Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Gosden Hill Farm, Merrow Lane, Guildford, GU4 7LE
Gosden Hill Farm, Merrow Lane, Guildford, GU4 7LE
This record has no verified map location.
View council mapOutline planning application with all matters reserved except for means of access to the site, for the phased development of a residential-led mixed-use development comprising up to 1,800 dwellings (Class C3 Use), C2 use, 6 gypsy and travellers pitches, a mixed-use local centre (comprising some or all Use Class C2, C3, E, F2 and sui generis use), with associated public space, employment floorspace (comprising some or all Use Class B2, B8 and E), land for the provision of a primary school and a secondary school (Use Class F1), creation of a new junction onto the A3, new vehicular access from London Road and Merrow Lane, Park and Ride facility, green infrastructure (including allotments, playspace, amenity green space and sport pitches (Use Class F2(c) and pavilion), SANG, and associated infrastructure and earthworks, at land at Gosden Hill Farm.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Merrow residents? association - objectCorrespondence · PDF | 6 Oct 2026 | View |
| Hydraulic flood modelling study - addendum 2Application Document · PDF | 28 Sept 2026 | View |
| Ecology response technical note 11.9.26Application Document · PDF | 11 Sept 2026 | View |
| Environment agency - commentCorrespondence · PDF | 10 Sept 2026 | View |
| National highways - commentCorrespondence · PDF | 1 Sept 2026 | View |
| Active travel englandCorrespondence · PDF | 7 Aug 2026 | View |
| Network railCorrespondence · PDF | 7 Aug 2026 | View |
| Burpham neighbourhood forum comments (highways review)Correspondence · PDF | 27 Jul 2026 | View |
| Burpham neighbourhood forum comments (water & floor review)Correspondence · PDF | 27 Jul 2026 | View |
| Burpham neighbourhood forum - commentCorrespondence · PDF | 22 Jul 2026 | View |
| Gdc environmental healthCorrespondence · PDF | 22 Jul 2026 | View |
| Sustainable transport strategy overviewApplication Document · PDF | 13 Jul 2026 | View |
| Illustrative masterplanDrawing · PDF | 13 Jul 2026 | View |
| Hydraulic modelling flooding study addendumApplication Document · PDF | 13 Jul 2026 | View |
| Technical note 5 - a3 accessApplication Document · PDF | 26 Jun 2026 | View |
| Ecology consulteeCorrespondence · PDF | 24 Jun 2026 | View |
| National highways - commentCorrespondence · PDF | 9 Jun 2026 | View |
| Amended biodiversity metric calculation toolApplication Document | 5 Jun 2026 | View |
| Ecology response technical noteApplication Document · PDF | 5 Jun 2026 | View |
| Covering letterApplication Document · PDF | 5 Jun 2026 | View |
| Environment agency - objectCorrespondence · PDF | 26 May 2026 | View |
| Non-real time hydraulic model reviewCorrespondence | 26 May 2026 | View |
| Flood hydrology reviewCorrespondence | 26 May 2026 | View |
| Sport englandCorrespondence · PDF | 13 May 2026 | View |
| Police - s106 requestCorrespondence · PDF | 23 Apr 2026 | View |
| Police - s106 request - appendix 1Correspondence · PDF | 23 Apr 2026 | View |
| Police - s106 request - appendix 2Correspondence · PDF | 23 Apr 2026 | View |
| Police - s106 request - appendix 3Correspondence · PDF | 23 Apr 2026 | View |
| Police - s106 request - appendix 4Correspondence · PDF | 23 Apr 2026 | View |
| Police - s106 request - appendix 5Correspondence · PDF | 23 Apr 2026 | View |
| Police - s106 request - appendix 6Correspondence · PDF | 23 Apr 2026 | View |
| Ecology consulteeCorrespondence · PDF | 23 Apr 2026 | View |
| Send parish councilCorrespondence · PDF | 10 Apr 2026 | View |
| National highways - commentCorrespondence · PDF | 30 Mar 2026 | View |
| Douglas whitbournCorrespondence · PDF | 27 Mar 2026 | View |
| Sport englandCorrespondence · PDF | 26 Mar 2026 | View |
| Naturespace partnershipCorrespondence · PDF | 25 Mar 2026 | View |
| Wendy boardman - objectCorrespondence · PDF | 23 Mar 2026 | View |
| Heather thompson - objectCorrespondence · PDF | 23 Mar 2026 | View |
| Jamie robinson - objectCorrespondence · PDF | 23 Mar 2026 | View |
| Colin pearce - objectCorrespondence · PDF | 23 Mar 2026 | View |
| David minnett - objectCorrespondence · PDF | 23 Mar 2026 | View |
| Forestry commissionCorrespondence · PDF | 23 Mar 2026 | View |
| Scc countryside officer commentCorrespondence · PDF | 20 Mar 2026 | View |
| Jim allen - objectCorrespondence · PDF | 18 Mar 2026 | View |
| Guildford environmental protectionCorrespondence · PDF | 18 Mar 2026 | View |
| National highways - commentCorrespondence · PDF | 17 Mar 2026 | View |
| Surrey archaeology - commentCorrespondence · PDF | 17 Mar 2026 | View |
| Thames water - commentCorrespondence · PDF | 13 Mar 2026 | View |
| Surrey suds - commentCorrespondence · PDF | 13 Mar 2026 | View |
| Natural england - commentCorrespondence · PDF | 12 Mar 2026 | View |
| Southern gas networksCorrespondence · PDF | 10 Mar 2026 | View |
| Surrey hills national landscape planning adviserCorrespondence · PDF | 3 Mar 2026 | View |
| Amended planning supporting noteApplication Document · PDF | 3 Mar 2026 | View |
| Amended covering letter planning supporting noteApplication Document · PDF | 2 Mar 2026 | View |
| Outline community governance strategyApplication Document · PDF | 2 Mar 2026 | View |
| Surface water drainage strategyDrawing · PDF | 27 Feb 2026 | View |
| Foul water drainage strategyDrawing · PDF | 27 Feb 2026 | View |
| Indicative levels planDrawing · PDF | 27 Feb 2026 | View |
| Earthworks strategyDrawing · PDF | 27 Feb 2026 | View |
| Overland flow planDrawing · PDF | 27 Feb 2026 | View |
| Site section planDrawing · PDF | 27 Feb 2026 | View |
| Site section sheet 1/2Drawing · PDF | 27 Feb 2026 | View |
| Site section sheet 2/2Drawing · PDF | 27 Feb 2026 | View |
| Environmental statement addendumApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum chapter 12 natural heritageApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix historic building assessment 1/3Application Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix historic building assessment 2/3Application Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix historic building assessment 3/3Application Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix h 10.5 landscape effects tableApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix h 10.6 visual effects tableApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix h 10.7 night time effects tableApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix h 10.8 cumulative effects tableApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix jo ecological impact assessmentApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j1 wildlife legislation and conservation statusApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j4 biodiversity net gain assessment 1/2Application Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j4 biodiversity net gain assessment 2/2Application Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j5 invasive plant surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j6 botanical survey of sang woodlandApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j7 hedgerow surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j8 great crested newt surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j9 reptile surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j10 breeding bird surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j11 nightjar surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j12 winter bird surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j13 dormouse surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j14 badger surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j15 bat roost surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j16 advanced level bat surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j17 bat activity surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j18 otter and water vole surveyApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix j20 botanical species listApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix l framework travel planApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix n2 flood risk assessment and drainage strategy adApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix n2 flood risk assessment and drainage strategy adApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix n2 flood risk assessment and drainage strategy adApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix n2 flood risk assessment and drainage strategy adApplication Document · PDF | 27 Feb 2026 | View |
| Es addendum technical appendix n3 hydraulic flood modellingApplication Document · PDF | 27 Feb 2026 | View |
| Superseded - amended illustrative masterplanDrawing · PDF | 27 Feb 2026 | View |
| Amended parameter plan land useDrawing · PDF | 27 Feb 2026 | View |
| Amended parameter plan - green infrastructureDrawing · PDF | 27 Feb 2026 | View |
| Amended parameter plan - access & movementDrawing · PDF | 27 Feb 2026 | View |
| Amended parameter plan - building heightsDrawing · PDF | 27 Feb 2026 | View |
| Superseded planning supporting noteApplication Document · PDF | 27 Feb 2026 | View |
| Superseded covering letter planning supporting noteApplication Document · PDF | 27 Feb 2026 | View |
| Amended energy and sustainablity statementApplication Document · PDF | 27 Feb 2026 | View |
| Amended shadow habitatts regulations assessmentApplication Document · PDF | 27 Feb 2026 | View |
| Active travel england response noteApplication Document · PDF | 27 Feb 2026 | View |
| Addendum to d&asApplication Document · PDF | 27 Feb 2026 | View |
| Response to comments from gbc urban design officer 2/4Application Document · PDF | 27 Feb 2026 | View |
| Response to comments from gbc urban design officer 3/4Application Document · PDF | 27 Feb 2026 | View |
| Response to comments from gbc urban design officer 4/4Application Document · PDF | 27 Feb 2026 | View |
| Amended design principles documentApplication Document · PDF | 27 Feb 2026 | View |
| Ecology technical response noteApplication Document · PDF | 27 Feb 2026 | View |
| Heritage technical response noteApplication Document · PDF | 27 Feb 2026 | View |
| Landscape technical response noteApplication Document · PDF | 27 Feb 2026 | View |
| National highways response noteApplication Document · PDF | 27 Feb 2026 | View |
| Noise technical response noteApplication Document · PDF | 27 Feb 2026 | View |
| Non-technical response to ea review letterApplication Document · PDF | 27 Feb 2026 | View |
| Scc highways response noteApplication Document · PDF | 27 Feb 2026 | View |
| Environmental statement addendum figuresApplication Document · PDF | 27 Feb 2026 | View |
| Burpham community association - commentCorrespondence · PDF | 28 Jan 2026 | View |
| Amended application formApplication Form · PDF | 14 Jan 2026 | View |
| Companies house certificate of incorporation on change of nameApplication Document · PDF | 14 Jan 2026 | View |
| National highways technical noteCorrespondence · PDF | 5 Jan 2026 | View |
| National highways - commentCorrespondence · PDF | 23 Dec 2025 | View |
| Scc educationCorrespondence · PDF | 15 Dec 2025 | View |
| Urban design and conservationCorrespondence · PDF | 15 Dec 2025 | View |
| Landscape commentsCorrespondence · PDF | 12 Dec 2025 | View |
| Burpham community association - objectCorrespondence · PDF | 12 Dec 2025 | View |
| Environmental protectionCorrespondence | 26 Nov 2025 | View |
| Environment agency - objectCorrespondence · PDF | 21 Nov 2025 | View |
| Lc ecological services - commentCorrespondence · PDF | 13 Nov 2025 | View |
| Network rail - commentCorrespondence · PDF | 7 Nov 2025 | View |
| Naturespace - commentCorrespondence · PDF | 29 Oct 2025 | View |
| Ockham parish council - objectCorrespondence · PDF | 24 Oct 2025 | View |
| Ripley parish council and send parish council joint reponseCorrespondence · PDF | 22 Oct 2025 | View |
| Woodland trustCorrespondence · PDF | 14 Oct 2025 | View |
| Jim allen concerns for water supply for the sitePublic Comment · PDF | 14 Oct 2025 | View |
| The guildford society objectCorrespondence · PDF | 13 Oct 2025 | View |
| Save surrey countryside objectCorrespondence · PDF | 11 Oct 2025 | View |
| Forestry commissionCorrespondence · PDF | 10 Oct 2025 | View |
| Housing strategyCorrespondence | 9 Oct 2025 | View |
| Natural england request further informationCorrespondence · PDF | 9 Oct 2025 | View |
| West horsley parish council responseCorrespondence · PDF | 7 Oct 2025 | View |
| Reg 25 letterCorrespondence · PDF | 6 Oct 2025 | View |
| Merrow residents association - objectionCorrespondence · PDF | 6 Oct 2025 | View |
| Effingham parish council - commentCorrespondence · PDF | 6 Oct 2025 | View |
| Active travel englandCorrespondence · PDF | 2 Oct 2025 | View |
| National highways - holding responseCorrespondence · PDF | 1 Oct 2025 | View |
| Alison & ian martin objectCorrespondence · PDF | 1 Oct 2025 | View |
| Muriel warren objectCorrespondence · PDF | 1 Oct 2025 | View |
| John oliver objectCorrespondence · PDF | 1 Oct 2025 | View |
| Icb (nhs)Correspondence · PDF | 1 Oct 2025 | View |
| Paul mattos objectCorrespondence · PDF | 1 Oct 2025 | View |
| Louise & robert blackwell objectCorrespondence · PDF | 27 Sept 2025 | View |
| Antony hatton objectCorrespondence · PDF | 27 Sept 2025 | View |
| Burpham community association - objectCorrespondence · PDF | 25 Sept 2025 | View |
| Surrey suds - objectCorrespondence · PDF | 25 Sept 2025 | View |
| Adam hellbron objectCorrespondence · PDF | 25 Sept 2025 | View |
| Burpham neighbourhood forum objectsCorrespondence · PDF | 23 Sept 2025 | View |
| Thames waterCorrespondence · PDF | 22 Sept 2025 | View |
| Sport englandCorrespondence · PDF | 22 Sept 2025 | View |
| Scc county archaeologist responseCorrespondence · PDF | 19 Sept 2025 | View |
| Lisa kiss objectsCorrespondence · PDF | 19 Sept 2025 | View |
| Environment agency - objectCorrespondence · PDF | 18 Sept 2025 | View |
| Recyling officer commentsCorrespondence · PDF | 18 Sept 2025 | View |
| Surrey highways - commentCorrespondence · PDF | 15 Sept 2025 | View |
| Scc minerals and waste responseeCorrespondence · PDF | 15 Sept 2025 | View |
| Jim allen objectsCorrespondence · PDF | 15 Sept 2025 | View |
| London gatwick - commentCorrespondence · PDF | 11 Sept 2025 | View |
| Historic england - commentCorrespondence · PDF | 11 Sept 2025 | View |
| Southern gas networks plc responseCorrespondence · PDF | 11 Sept 2025 | View |
| Scotia gas networks limitedCorrespondence · PDF | 9 Sept 2025 | View |
| Scotia gas networks limitedCorrespondence · PDF | 9 Sept 2025 | View |
| Jennifer morris - objectCorrespondence · PDF | 8 Sept 2025 | View |
| Surrey dormouse group - commentCorrespondence · PDF | 8 Sept 2025 | View |
| Nats safeguarding - commentCorrespondence · PDF | 5 Sept 2025 | View |
| Amended lightingApplication Document · PDF | 3 Sept 2025 | View |
| Roy darkin - objectCorrespondence · PDF | 3 Sept 2025 | View |
| Forestry comission - commentCorrespondence · PDF | 3 Sept 2025 | View |
| Surface water drainage pro-formaApplication Document · PDF | 2 Sept 2025 | View |
| Surrey hills aonb - commentCorrespondence · PDF | 2 Sept 2025 | View |
| Authorization to publishApplication Document · PDF | 21 Aug 2025 | View |
| Indictative levels planDrawing · PDF | 18 Aug 2025 | View |
| Proposed main site access from a3 with on/off slips and connection with a3100Drawing · PDF | 18 Aug 2025 | View |
| Site sections sheet 1 of 2Drawing · PDF | 18 Aug 2025 | View |
| Tree protection planDrawing · PDF | 18 Aug 2025 | View |
| Site sections sheet 2 of 2Drawing · PDF | 18 Aug 2025 | View |
| Tree constraints planDrawing · PDF | 18 Aug 2025 | View |
| Site location planDrawing · PDF | 18 Aug 2025 | View |
| Site location planDrawing · PDF | 18 Aug 2025 | View |
| Proposed demolition planDrawing · PDF | 18 Aug 2025 | View |
| Superseded illustrative masterplanDrawing · PDF | 18 Aug 2025 | View |
| Indictative phasing strategyDrawing · PDF | 18 Aug 2025 | View |
| Superseded parameter plan land useDrawing · PDF | 18 Aug 2025 | View |
| Superseded parameter plan - green infrastructureDrawing · PDF | 18 Aug 2025 | View |
| Superseded parameter plan - access & movementDrawing · PDF | 18 Aug 2025 | View |
| Superseded parameter plan - building heightsDrawing · PDF | 18 Aug 2025 | View |
| Proposed main site access from a3 with visiblity splaysDrawing · PDF | 18 Aug 2025 | View |
| Phase 1 proposed access and improvements to merrow laneDrawing · PDF | 18 Aug 2025 | View |
| Sr utility statement part 14Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 13Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 12Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 16Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 15Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 17Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 1Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 3Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 4Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statement part 5Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statment part 6Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statment part 8Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statment part 9Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statment part 11Application Document · PDF | 18 Aug 2025 | View |
| Sr utility statment part 10Application Document · PDF | 18 Aug 2025 | View |
| Topographical surveyDrawing · PDF | 18 Aug 2025 | View |
| Superseded shadow habitatts regulations assessmentApplication Document · PDF | 18 Aug 2025 | View |
| Sr statement of community involvementApplication Document · PDF | 18 Aug 2025 | View |
| Sr planning statementApplication Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 16Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 17Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 18Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 19Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 20Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 21Application Document · PDF | 18 Aug 2025 | View |
| Superseded application formApplication Form · PDF | 18 Aug 2025 | View |
| Earthworks strategyDrawing · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 12Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 13Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 14Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 15Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 11Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 6Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 7Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 8Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 9Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 10Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 5Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 3Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 4Application Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 1Application Document · PDF | 18 Aug 2025 | View |
| Sr design and access statement - part 1Application Document · PDF | 18 Aug 2025 | View |
| Sr design and access statement - part 2Application Document · PDF | 18 Aug 2025 | View |
| Sr design and access statement - part 3Application Document · PDF | 18 Aug 2025 | View |
| Sr design and access statement - part 4Application Document · PDF | 18 Aug 2025 | View |
| Sr design and access statement - part 5Application Document · PDF | 18 Aug 2025 | View |
| Sr design and access statement - part 6Application Document · PDF | 18 Aug 2025 | View |
| Superseded sr design principlesApplication Document · PDF | 18 Aug 2025 | View |
| Superseded energy and sustainablity statementApplication Document · PDF | 18 Aug 2025 | View |
| Construction environment management planApplication Document · PDF | 18 Aug 2025 | View |
| Ecological impact assessmentApplication Document · PDF | 18 Aug 2025 | View |
| Flood risk assessment - part 4Application Document · PDF | 18 Aug 2025 | View |
| Flood risk assessment - part 3Application Document · PDF | 18 Aug 2025 | View |
| Flood risk assessment - part 2Application Document · PDF | 18 Aug 2025 | View |
| Flood risk assessment - part 1Application Document · PDF | 18 Aug 2025 | View |
| Sr aia - arboricultural impact assessmentApplication Document · PDF | 18 Aug 2025 | View |
| Wildlife legislation & conservation statusApplication Document · PDF | 18 Aug 2025 | View |
| National planning policyApplication Document · PDF | 18 Aug 2025 | View |
| Local planning policyApplication Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 1Application Document · PDF | 18 Aug 2025 | View |
| Biodiversity net gain assessmentApplication Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 2Application Document · PDF | 18 Aug 2025 | View |
| Invasive plant surveyApplication Document · PDF | 18 Aug 2025 | View |
| Botanical survey of sang woodlandApplication Document · PDF | 18 Aug 2025 | View |
| Hedgerow surveyApplication Document · PDF | 18 Aug 2025 | View |
| Great crested newt surveyApplication Document · PDF | 18 Aug 2025 | View |
| Reptile surveyApplication Document · PDF | 18 Aug 2025 | View |
| Breeding birds surveyApplication Document · PDF | 18 Aug 2025 | View |
| Nightjar surveyApplication Document · PDF | 18 Aug 2025 | View |
| Winter bird surveyApplication Document · PDF | 18 Aug 2025 | View |
| Hazel dormouse surveyApplication Document · PDF | 18 Aug 2025 | View |
| Badger survey redactedApplication Document · PDF | 18 Aug 2025 | View |
| Bat roost surveyApplication Document · PDF | 18 Aug 2025 | View |
| Advanced level bat surveyApplication Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 3Application Document · PDF | 18 Aug 2025 | View |
| Bat activity surveyApplication Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 4Application Document · PDF | 18 Aug 2025 | View |
| Otter & water vole surveyApplication Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 5Application Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 5Application Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 6Application Document · PDF | 18 Aug 2025 | View |
| Designated sites of nature conservationApplication Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 7Application Document · PDF | 18 Aug 2025 | View |
| Botanical species listApplication Document · PDF | 18 Aug 2025 | View |
| Transport assessment - part 8Application Document · PDF | 18 Aug 2025 | View |
| Travel planApplication Document · PDF | 18 Aug 2025 | View |
| Env st- ch 0 contentsApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - figure listApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ntsApplication Document · PDF | 18 Aug 2025 | View |
| Env st - ch 1 introductionApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 2 site descriptionApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 3 proposed development and alternativesApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 4 environmental issues and methodologyApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 5 agriculture and soilsApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 6 air qualityApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 7 climate changeApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 8 community health and economic effectsApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 9 cultural heritage part 1Application Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 9 cultural heritage part 2Application Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 10 landscape and visual effectsApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 11 lightingApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 12 natural heritageApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 13 noise and vibrationApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 14 traffic and transportApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 15 wasteApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 16 water environmentApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - ch 17 summary tablesApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - glossaryApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - part 1 eia scoping reportApplication Document · PDF | 18 Aug 2025 | View |
| Superseded biodiversity metric calculation toolApplication Document | 18 Aug 2025 | View |
| Environment statement - part 2 eia scoping opinionApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - part 3 eia scoping consultation responsesApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement - part 4 eia scoping response reportApplication Document · PDF | 18 Aug 2025 | View |
| Env st - appendix b competant expertsApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement c part1 alc survey report 1993t expertsApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement part 2 alc nov 2001Application Document · PDF | 18 Aug 2025 | View |
| Environment statement part 3 alc survey mapApplication Document · PDF | 18 Aug 2025 | View |
| Climate change appendicesApplication Document · PDF | 18 Aug 2025 | View |
| Environment statement d air qualityApplication Document · PDF | 18 Aug 2025 | View |
| Economic impact reportApplication Document · PDF | 18 Aug 2025 | View |
| Healthy urban development unit rapid health impact assessment tablesApplication Document · PDF | 18 Aug 2025 | View |
| Gazetteer of heritage assets in study areaApplication Document · PDF | 18 Aug 2025 | View |
| Desk based archaeological assessment part 1Application Document · PDF | 18 Aug 2025 | View |
| Desk based archaeological assessment part 2Application Document · PDF | 18 Aug 2025 | View |
| Landscape & visual impact assessment methodologyApplication Document · PDF | 18 Aug 2025 | View |
| Published landscape character extractsApplication Document · PDF | 18 Aug 2025 | View |
| Site appraisal summer photographsPhoto · PDF | 18 Aug 2025 | View |
| Site appraisal winter photographsPhoto · PDF | 18 Aug 2025 | View |
| Site context photographs summer part aPhoto · PDF | 18 Aug 2025 | View |
| Site context photographs summer part bPhoto · PDF | 18 Aug 2025 | View |
| Site context photographs summer part cPhoto · PDF | 18 Aug 2025 | View |
| Site context photographs winter part aPhoto · PDF | 18 Aug 2025 | View |
| Site context photographs winter part bPhoto · PDF | 18 Aug 2025 | View |
| Site context photographs winter part cPhoto · PDF | 18 Aug 2025 | View |
| Site context photographs winter part dPhoto · PDF | 18 Aug 2025 | View |
| Landscape effects tableApplication Document · PDF | 18 Aug 2025 | View |
| Visual effects tableApplication Document · PDF | 18 Aug 2025 | View |
| Night effects tableApplication Document · PDF | 18 Aug 2025 | View |
| Cumulative effects tableApplication Document · PDF | 18 Aug 2025 | View |
| Landscape & ecological management strategy part aApplication Document · PDF | 18 Aug 2025 | View |
| Landscape & ecological management strategy part bApplication Document · PDF | 18 Aug 2025 | View |
| Sang management plan part aApplication Document · PDF | 18 Aug 2025 | View |
| Sang management plan part bApplication Document · PDF | 18 Aug 2025 | View |
| Accurate visual representationsApplication Document · PDF | 18 Aug 2025 | View |
| Superseded lightingApplication Document · PDF | 18 Aug 2025 | View |
| Legislation, policy & guidance reportApplication Document · PDF | 18 Aug 2025 | View |
| Construction, noise & vibration assumptionsApplication Document · PDF | 18 Aug 2025 | View |
| Site suitability studyApplication Document · PDF | 18 Aug 2025 | View |
| Waste reportApplication Document · PDF | 18 Aug 2025 | View |
| Air quality appendixApplication Document · PDF | 18 Aug 2025 | View |
| Ph 1 contamination assessment - part 2Application Document · PDF | 18 Aug 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.