Council planning record

Outline planning application with all matters reserved except for means of access to the site, for the phased development of a residential-led mixed-use development comprising up to 1,800 dwellings (Class C3 Use), C2 use, 6 gypsy and travellers pitches, a mixed-use local centre (comprising some or all Use Class C2, C3, E, F2 and sui generis use), with associated public space, employment floorspace (comprising some or all Use Class B2, B8 and E), land for the provision of a primary school and a secondary school (Use Class F1), creation of a new junction onto the A3, new vehicular access from London Road and Merrow Lane, Park and Ride facility, green infrastructure (including allotments, playspace, amenity green space and sport pitches (Use Class F2(c) and pavilion), SANG, and associated infrastructure and earthworks, at land at Gosden Hill Farm.

Gosden Hill Farm, Merrow Lane, Guildford, GU4 7LE

RegisteredReference: 25/P/01156Guildford Borough Council

Application location

Gosden Hill Farm, Merrow Lane, Guildford, GU4 7LE

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Outline Application
Received
18 Aug 2025
Validated
18 Aug 2025
Determination deadline
Not published
Local authority
Guildford Borough Council

Application overview

Outline planning application with all matters reserved except for means of access to the site, for the phased development of a residential-led mixed-use development comprising up to 1,800 dwellings (Class C3 Use), C2 use, 6 gypsy and travellers pitches, a mixed-use local centre (comprising some or all Use Class C2, C3, E, F2 and sui generis use), with associated public space, employment floorspace (comprising some or all Use Class B2, B8 and E), land for the provision of a primary school and a secondary school (Use Class F1), creation of a new junction onto the A3, new vehicular access from London Road and Merrow Lane, Park and Ride facility, green infrastructure (including allotments, playspace, amenity green space and sport pitches (Use Class F2(c) and pavilion), SANG, and associated infrastructure and earthworks, at land at Gosden Hill Farm.

Proposal details

Reference
25/P/01156
Alternative references
PP-14184053
Ward
Clandon & Horsley
Parish
Send
Agent
tor&co

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 352 of 352

DocumentPublishedAction
Merrow residents? association - objectCorrespondence · PDF6 Oct 2026View
Hydraulic flood modelling study - addendum 2Application Document · PDF28 Sept 2026View
Ecology response technical note 11.9.26Application Document · PDF11 Sept 2026View
Environment agency - commentCorrespondence · PDF10 Sept 2026View
National highways - commentCorrespondence · PDF1 Sept 2026View
Active travel englandCorrespondence · PDF7 Aug 2026View
Network railCorrespondence · PDF7 Aug 2026View
Burpham neighbourhood forum comments (highways review)Correspondence · PDF27 Jul 2026View
Burpham neighbourhood forum comments (water & floor review)Correspondence · PDF27 Jul 2026View
Burpham neighbourhood forum - commentCorrespondence · PDF22 Jul 2026View
Gdc environmental healthCorrespondence · PDF22 Jul 2026View
Sustainable transport strategy overviewApplication Document · PDF13 Jul 2026View
Illustrative masterplanDrawing · PDF13 Jul 2026View
Hydraulic modelling flooding study addendumApplication Document · PDF13 Jul 2026View
Technical note 5 - a3 accessApplication Document · PDF26 Jun 2026View
Ecology consulteeCorrespondence · PDF24 Jun 2026View
National highways - commentCorrespondence · PDF9 Jun 2026View
Amended biodiversity metric calculation toolApplication Document5 Jun 2026View
Ecology response technical noteApplication Document · PDF5 Jun 2026View
Covering letterApplication Document · PDF5 Jun 2026View
Environment agency - objectCorrespondence · PDF26 May 2026View
Non-real time hydraulic model reviewCorrespondence26 May 2026View
Flood hydrology reviewCorrespondence26 May 2026View
Sport englandCorrespondence · PDF13 May 2026View
Police - s106 requestCorrespondence · PDF23 Apr 2026View
Police - s106 request - appendix 1Correspondence · PDF23 Apr 2026View
Police - s106 request - appendix 2Correspondence · PDF23 Apr 2026View
Police - s106 request - appendix 3Correspondence · PDF23 Apr 2026View
Police - s106 request - appendix 4Correspondence · PDF23 Apr 2026View
Police - s106 request - appendix 5Correspondence · PDF23 Apr 2026View
Police - s106 request - appendix 6Correspondence · PDF23 Apr 2026View
Ecology consulteeCorrespondence · PDF23 Apr 2026View
Send parish councilCorrespondence · PDF10 Apr 2026View
National highways - commentCorrespondence · PDF30 Mar 2026View
Douglas whitbournCorrespondence · PDF27 Mar 2026View
Sport englandCorrespondence · PDF26 Mar 2026View
Naturespace partnershipCorrespondence · PDF25 Mar 2026View
Wendy boardman - objectCorrespondence · PDF23 Mar 2026View
Heather thompson - objectCorrespondence · PDF23 Mar 2026View
Jamie robinson - objectCorrespondence · PDF23 Mar 2026View
Colin pearce - objectCorrespondence · PDF23 Mar 2026View
David minnett - objectCorrespondence · PDF23 Mar 2026View
Forestry commissionCorrespondence · PDF23 Mar 2026View
Scc countryside officer commentCorrespondence · PDF20 Mar 2026View
Jim allen - objectCorrespondence · PDF18 Mar 2026View
Guildford environmental protectionCorrespondence · PDF18 Mar 2026View
National highways - commentCorrespondence · PDF17 Mar 2026View
Surrey archaeology - commentCorrespondence · PDF17 Mar 2026View
Thames water - commentCorrespondence · PDF13 Mar 2026View
Surrey suds - commentCorrespondence · PDF13 Mar 2026View
Natural england - commentCorrespondence · PDF12 Mar 2026View
Southern gas networksCorrespondence · PDF10 Mar 2026View
Surrey hills national landscape planning adviserCorrespondence · PDF3 Mar 2026View
Amended planning supporting noteApplication Document · PDF3 Mar 2026View
Amended covering letter planning supporting noteApplication Document · PDF2 Mar 2026View
Outline community governance strategyApplication Document · PDF2 Mar 2026View
Surface water drainage strategyDrawing · PDF27 Feb 2026View
Foul water drainage strategyDrawing · PDF27 Feb 2026View
Indicative levels planDrawing · PDF27 Feb 2026View
Earthworks strategyDrawing · PDF27 Feb 2026View
Overland flow planDrawing · PDF27 Feb 2026View
Site section planDrawing · PDF27 Feb 2026View
Site section sheet 1/2Drawing · PDF27 Feb 2026View
Site section sheet 2/2Drawing · PDF27 Feb 2026View
Environmental statement addendumApplication Document · PDF27 Feb 2026View
Es addendum chapter 12 natural heritageApplication Document · PDF27 Feb 2026View
Es addendum technical appendix historic building assessment 1/3Application Document · PDF27 Feb 2026View
Es addendum technical appendix historic building assessment 2/3Application Document · PDF27 Feb 2026View
Es addendum technical appendix historic building assessment 3/3Application Document · PDF27 Feb 2026View
Es addendum technical appendix h 10.5 landscape effects tableApplication Document · PDF27 Feb 2026View
Es addendum technical appendix h 10.6 visual effects tableApplication Document · PDF27 Feb 2026View
Es addendum technical appendix h 10.7 night time effects tableApplication Document · PDF27 Feb 2026View
Es addendum technical appendix h 10.8 cumulative effects tableApplication Document · PDF27 Feb 2026View
Es addendum technical appendix jo ecological impact assessmentApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j1 wildlife legislation and conservation statusApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j4 biodiversity net gain assessment 1/2Application Document · PDF27 Feb 2026View
Es addendum technical appendix j4 biodiversity net gain assessment 2/2Application Document · PDF27 Feb 2026View
Es addendum technical appendix j5 invasive plant surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j6 botanical survey of sang woodlandApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j7 hedgerow surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j8 great crested newt surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j9 reptile surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j10 breeding bird surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j11 nightjar surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j12 winter bird surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j13 dormouse surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j14 badger surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j15 bat roost surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j16 advanced level bat surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j17 bat activity surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j18 otter and water vole surveyApplication Document · PDF27 Feb 2026View
Es addendum technical appendix j20 botanical species listApplication Document · PDF27 Feb 2026View
Es addendum technical appendix l framework travel planApplication Document · PDF27 Feb 2026View
Es addendum technical appendix n2 flood risk assessment and drainage strategy adApplication Document · PDF27 Feb 2026View
Es addendum technical appendix n2 flood risk assessment and drainage strategy adApplication Document · PDF27 Feb 2026View
Es addendum technical appendix n2 flood risk assessment and drainage strategy adApplication Document · PDF27 Feb 2026View
Es addendum technical appendix n2 flood risk assessment and drainage strategy adApplication Document · PDF27 Feb 2026View
Es addendum technical appendix n3 hydraulic flood modellingApplication Document · PDF27 Feb 2026View
Superseded - amended illustrative masterplanDrawing · PDF27 Feb 2026View
Amended parameter plan land useDrawing · PDF27 Feb 2026View
Amended parameter plan - green infrastructureDrawing · PDF27 Feb 2026View
Amended parameter plan - access & movementDrawing · PDF27 Feb 2026View
Amended parameter plan - building heightsDrawing · PDF27 Feb 2026View
Superseded planning supporting noteApplication Document · PDF27 Feb 2026View
Superseded covering letter planning supporting noteApplication Document · PDF27 Feb 2026View
Amended energy and sustainablity statementApplication Document · PDF27 Feb 2026View
Amended shadow habitatts regulations assessmentApplication Document · PDF27 Feb 2026View
Active travel england response noteApplication Document · PDF27 Feb 2026View
Addendum to d&asApplication Document · PDF27 Feb 2026View
Response to comments from gbc urban design officer 2/4Application Document · PDF27 Feb 2026View
Response to comments from gbc urban design officer 3/4Application Document · PDF27 Feb 2026View
Response to comments from gbc urban design officer 4/4Application Document · PDF27 Feb 2026View
Amended design principles documentApplication Document · PDF27 Feb 2026View
Ecology technical response noteApplication Document · PDF27 Feb 2026View
Heritage technical response noteApplication Document · PDF27 Feb 2026View
Landscape technical response noteApplication Document · PDF27 Feb 2026View
National highways response noteApplication Document · PDF27 Feb 2026View
Noise technical response noteApplication Document · PDF27 Feb 2026View
Non-technical response to ea review letterApplication Document · PDF27 Feb 2026View
Scc highways response noteApplication Document · PDF27 Feb 2026View
Environmental statement addendum figuresApplication Document · PDF27 Feb 2026View
Burpham community association - commentCorrespondence · PDF28 Jan 2026View
Amended application formApplication Form · PDF14 Jan 2026View
Companies house certificate of incorporation on change of nameApplication Document · PDF14 Jan 2026View
National highways technical noteCorrespondence · PDF5 Jan 2026View
National highways - commentCorrespondence · PDF23 Dec 2025View
Scc educationCorrespondence · PDF15 Dec 2025View
Urban design and conservationCorrespondence · PDF15 Dec 2025View
Landscape commentsCorrespondence · PDF12 Dec 2025View
Burpham community association - objectCorrespondence · PDF12 Dec 2025View
Environmental protectionCorrespondence26 Nov 2025View
Environment agency - objectCorrespondence · PDF21 Nov 2025View
Lc ecological services - commentCorrespondence · PDF13 Nov 2025View
Network rail - commentCorrespondence · PDF7 Nov 2025View
Naturespace - commentCorrespondence · PDF29 Oct 2025View
Ockham parish council - objectCorrespondence · PDF24 Oct 2025View
Ripley parish council and send parish council joint reponseCorrespondence · PDF22 Oct 2025View
Woodland trustCorrespondence · PDF14 Oct 2025View
Jim allen concerns for water supply for the sitePublic Comment · PDF14 Oct 2025View
The guildford society objectCorrespondence · PDF13 Oct 2025View
Save surrey countryside objectCorrespondence · PDF11 Oct 2025View
Forestry commissionCorrespondence · PDF10 Oct 2025View
Housing strategyCorrespondence9 Oct 2025View
Natural england request further informationCorrespondence · PDF9 Oct 2025View
West horsley parish council responseCorrespondence · PDF7 Oct 2025View
Reg 25 letterCorrespondence · PDF6 Oct 2025View
Merrow residents association - objectionCorrespondence · PDF6 Oct 2025View
Effingham parish council - commentCorrespondence · PDF6 Oct 2025View
Active travel englandCorrespondence · PDF2 Oct 2025View
National highways - holding responseCorrespondence · PDF1 Oct 2025View
Alison & ian martin objectCorrespondence · PDF1 Oct 2025View
Muriel warren objectCorrespondence · PDF1 Oct 2025View
John oliver objectCorrespondence · PDF1 Oct 2025View
Icb (nhs)Correspondence · PDF1 Oct 2025View
Paul mattos objectCorrespondence · PDF1 Oct 2025View
Louise & robert blackwell objectCorrespondence · PDF27 Sept 2025View
Antony hatton objectCorrespondence · PDF27 Sept 2025View
Burpham community association - objectCorrespondence · PDF25 Sept 2025View
Surrey suds - objectCorrespondence · PDF25 Sept 2025View
Adam hellbron objectCorrespondence · PDF25 Sept 2025View
Burpham neighbourhood forum objectsCorrespondence · PDF23 Sept 2025View
Thames waterCorrespondence · PDF22 Sept 2025View
Sport englandCorrespondence · PDF22 Sept 2025View
Scc county archaeologist responseCorrespondence · PDF19 Sept 2025View
Lisa kiss objectsCorrespondence · PDF19 Sept 2025View
Environment agency - objectCorrespondence · PDF18 Sept 2025View
Recyling officer commentsCorrespondence · PDF18 Sept 2025View
Surrey highways - commentCorrespondence · PDF15 Sept 2025View
Scc minerals and waste responseeCorrespondence · PDF15 Sept 2025View
Jim allen objectsCorrespondence · PDF15 Sept 2025View
London gatwick - commentCorrespondence · PDF11 Sept 2025View
Historic england - commentCorrespondence · PDF11 Sept 2025View
Southern gas networks plc responseCorrespondence · PDF11 Sept 2025View
Scotia gas networks limitedCorrespondence · PDF9 Sept 2025View
Scotia gas networks limitedCorrespondence · PDF9 Sept 2025View
Jennifer morris - objectCorrespondence · PDF8 Sept 2025View
Surrey dormouse group - commentCorrespondence · PDF8 Sept 2025View
Nats safeguarding - commentCorrespondence · PDF5 Sept 2025View
Amended lightingApplication Document · PDF3 Sept 2025View
Roy darkin - objectCorrespondence · PDF3 Sept 2025View
Forestry comission - commentCorrespondence · PDF3 Sept 2025View
Surface water drainage pro-formaApplication Document · PDF2 Sept 2025View
Surrey hills aonb - commentCorrespondence · PDF2 Sept 2025View
Authorization to publishApplication Document · PDF21 Aug 2025View
Indictative levels planDrawing · PDF18 Aug 2025View
Proposed main site access from a3 with on/off slips and connection with a3100Drawing · PDF18 Aug 2025View
Site sections sheet 1 of 2Drawing · PDF18 Aug 2025View
Tree protection planDrawing · PDF18 Aug 2025View
Site sections sheet 2 of 2Drawing · PDF18 Aug 2025View
Tree constraints planDrawing · PDF18 Aug 2025View
Site location planDrawing · PDF18 Aug 2025View
Site location planDrawing · PDF18 Aug 2025View
Proposed demolition planDrawing · PDF18 Aug 2025View
Superseded illustrative masterplanDrawing · PDF18 Aug 2025View
Indictative phasing strategyDrawing · PDF18 Aug 2025View
Superseded parameter plan land useDrawing · PDF18 Aug 2025View
Superseded parameter plan - green infrastructureDrawing · PDF18 Aug 2025View
Superseded parameter plan - access & movementDrawing · PDF18 Aug 2025View
Superseded parameter plan - building heightsDrawing · PDF18 Aug 2025View
Proposed main site access from a3 with visiblity splaysDrawing · PDF18 Aug 2025View
Phase 1 proposed access and improvements to merrow laneDrawing · PDF18 Aug 2025View
Sr utility statement part 14Application Document · PDF18 Aug 2025View
Sr utility statement part 13Application Document · PDF18 Aug 2025View
Sr utility statement part 12Application Document · PDF18 Aug 2025View
Sr utility statement part 16Application Document · PDF18 Aug 2025View
Sr utility statement part 15Application Document · PDF18 Aug 2025View
Sr utility statement part 17Application Document · PDF18 Aug 2025View
Sr utility statement part 1Application Document · PDF18 Aug 2025View
Sr utility statement part 3Application Document · PDF18 Aug 2025View
Sr utility statement part 4Application Document · PDF18 Aug 2025View
Sr utility statement part 5Application Document · PDF18 Aug 2025View
Sr utility statment part 6Application Document · PDF18 Aug 2025View
Sr utility statment part 8Application Document · PDF18 Aug 2025View
Sr utility statment part 9Application Document · PDF18 Aug 2025View
Sr utility statment part 11Application Document · PDF18 Aug 2025View
Sr utility statment part 10Application Document · PDF18 Aug 2025View
Topographical surveyDrawing · PDF18 Aug 2025View
Superseded shadow habitatts regulations assessmentApplication Document · PDF18 Aug 2025View
Sr statement of community involvementApplication Document · PDF18 Aug 2025View
Sr planning statementApplication Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 16Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 17Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 18Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 19Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 20Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 21Application Document · PDF18 Aug 2025View
Superseded application formApplication Form · PDF18 Aug 2025View
Earthworks strategyDrawing · PDF18 Aug 2025View
Ph 1 contamination assessment - part 12Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 13Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 14Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 15Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 11Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 6Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 7Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 8Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 9Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 10Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 5Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 3Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 4Application Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 1Application Document · PDF18 Aug 2025View
Sr design and access statement - part 1Application Document · PDF18 Aug 2025View
Sr design and access statement - part 2Application Document · PDF18 Aug 2025View
Sr design and access statement - part 3Application Document · PDF18 Aug 2025View
Sr design and access statement - part 4Application Document · PDF18 Aug 2025View
Sr design and access statement - part 5Application Document · PDF18 Aug 2025View
Sr design and access statement - part 6Application Document · PDF18 Aug 2025View
Superseded sr design principlesApplication Document · PDF18 Aug 2025View
Superseded energy and sustainablity statementApplication Document · PDF18 Aug 2025View
Construction environment management planApplication Document · PDF18 Aug 2025View
Ecological impact assessmentApplication Document · PDF18 Aug 2025View
Flood risk assessment - part 4Application Document · PDF18 Aug 2025View
Flood risk assessment - part 3Application Document · PDF18 Aug 2025View
Flood risk assessment - part 2Application Document · PDF18 Aug 2025View
Flood risk assessment - part 1Application Document · PDF18 Aug 2025View
Sr aia - arboricultural impact assessmentApplication Document · PDF18 Aug 2025View
Wildlife legislation & conservation statusApplication Document · PDF18 Aug 2025View
National planning policyApplication Document · PDF18 Aug 2025View
Local planning policyApplication Document · PDF18 Aug 2025View
Transport assessment - part 1Application Document · PDF18 Aug 2025View
Biodiversity net gain assessmentApplication Document · PDF18 Aug 2025View
Transport assessment - part 2Application Document · PDF18 Aug 2025View
Invasive plant surveyApplication Document · PDF18 Aug 2025View
Botanical survey of sang woodlandApplication Document · PDF18 Aug 2025View
Hedgerow surveyApplication Document · PDF18 Aug 2025View
Great crested newt surveyApplication Document · PDF18 Aug 2025View
Reptile surveyApplication Document · PDF18 Aug 2025View
Breeding birds surveyApplication Document · PDF18 Aug 2025View
Nightjar surveyApplication Document · PDF18 Aug 2025View
Winter bird surveyApplication Document · PDF18 Aug 2025View
Hazel dormouse surveyApplication Document · PDF18 Aug 2025View
Badger survey redactedApplication Document · PDF18 Aug 2025View
Bat roost surveyApplication Document · PDF18 Aug 2025View
Advanced level bat surveyApplication Document · PDF18 Aug 2025View
Transport assessment - part 3Application Document · PDF18 Aug 2025View
Bat activity surveyApplication Document · PDF18 Aug 2025View
Transport assessment - part 4Application Document · PDF18 Aug 2025View
Otter & water vole surveyApplication Document · PDF18 Aug 2025View
Transport assessment - part 5Application Document · PDF18 Aug 2025View
Transport assessment - part 5Application Document · PDF18 Aug 2025View
Transport assessment - part 6Application Document · PDF18 Aug 2025View
Designated sites of nature conservationApplication Document · PDF18 Aug 2025View
Transport assessment - part 7Application Document · PDF18 Aug 2025View
Botanical species listApplication Document · PDF18 Aug 2025View
Transport assessment - part 8Application Document · PDF18 Aug 2025View
Travel planApplication Document · PDF18 Aug 2025View
Env st- ch 0 contentsApplication Document · PDF18 Aug 2025View
Environment statement - figure listApplication Document · PDF18 Aug 2025View
Environment statement - ntsApplication Document · PDF18 Aug 2025View
Env st - ch 1 introductionApplication Document · PDF18 Aug 2025View
Environment statement - ch 2 site descriptionApplication Document · PDF18 Aug 2025View
Environment statement - ch 3 proposed development and alternativesApplication Document · PDF18 Aug 2025View
Environment statement - ch 4 environmental issues and methodologyApplication Document · PDF18 Aug 2025View
Environment statement - ch 5 agriculture and soilsApplication Document · PDF18 Aug 2025View
Environment statement - ch 6 air qualityApplication Document · PDF18 Aug 2025View
Environment statement - ch 7 climate changeApplication Document · PDF18 Aug 2025View
Environment statement - ch 8 community health and economic effectsApplication Document · PDF18 Aug 2025View
Environment statement - ch 9 cultural heritage part 1Application Document · PDF18 Aug 2025View
Environment statement - ch 9 cultural heritage part 2Application Document · PDF18 Aug 2025View
Environment statement - ch 10 landscape and visual effectsApplication Document · PDF18 Aug 2025View
Environment statement - ch 11 lightingApplication Document · PDF18 Aug 2025View
Environment statement - ch 12 natural heritageApplication Document · PDF18 Aug 2025View
Environment statement - ch 13 noise and vibrationApplication Document · PDF18 Aug 2025View
Environment statement - ch 14 traffic and transportApplication Document · PDF18 Aug 2025View
Environment statement - ch 15 wasteApplication Document · PDF18 Aug 2025View
Environment statement - ch 16 water environmentApplication Document · PDF18 Aug 2025View
Environment statement - ch 17 summary tablesApplication Document · PDF18 Aug 2025View
Environment statement - glossaryApplication Document · PDF18 Aug 2025View
Environment statement - part 1 eia scoping reportApplication Document · PDF18 Aug 2025View
Superseded biodiversity metric calculation toolApplication Document18 Aug 2025View
Environment statement - part 2 eia scoping opinionApplication Document · PDF18 Aug 2025View
Environment statement - part 3 eia scoping consultation responsesApplication Document · PDF18 Aug 2025View
Environment statement - part 4 eia scoping response reportApplication Document · PDF18 Aug 2025View
Env st - appendix b competant expertsApplication Document · PDF18 Aug 2025View
Environment statement c part1 alc survey report 1993t expertsApplication Document · PDF18 Aug 2025View
Environment statement part 2 alc nov 2001Application Document · PDF18 Aug 2025View
Environment statement part 3 alc survey mapApplication Document · PDF18 Aug 2025View
Climate change appendicesApplication Document · PDF18 Aug 2025View
Environment statement d air qualityApplication Document · PDF18 Aug 2025View
Economic impact reportApplication Document · PDF18 Aug 2025View
Healthy urban development unit rapid health impact assessment tablesApplication Document · PDF18 Aug 2025View
Gazetteer of heritage assets in study areaApplication Document · PDF18 Aug 2025View
Desk based archaeological assessment part 1Application Document · PDF18 Aug 2025View
Desk based archaeological assessment part 2Application Document · PDF18 Aug 2025View
Landscape & visual impact assessment methodologyApplication Document · PDF18 Aug 2025View
Published landscape character extractsApplication Document · PDF18 Aug 2025View
Site appraisal summer photographsPhoto · PDF18 Aug 2025View
Site appraisal winter photographsPhoto · PDF18 Aug 2025View
Site context photographs summer part aPhoto · PDF18 Aug 2025View
Site context photographs summer part bPhoto · PDF18 Aug 2025View
Site context photographs summer part cPhoto · PDF18 Aug 2025View
Site context photographs winter part aPhoto · PDF18 Aug 2025View
Site context photographs winter part bPhoto · PDF18 Aug 2025View
Site context photographs winter part cPhoto · PDF18 Aug 2025View
Site context photographs winter part dPhoto · PDF18 Aug 2025View
Landscape effects tableApplication Document · PDF18 Aug 2025View
Visual effects tableApplication Document · PDF18 Aug 2025View
Night effects tableApplication Document · PDF18 Aug 2025View
Cumulative effects tableApplication Document · PDF18 Aug 2025View
Landscape & ecological management strategy part aApplication Document · PDF18 Aug 2025View
Landscape & ecological management strategy part bApplication Document · PDF18 Aug 2025View
Sang management plan part aApplication Document · PDF18 Aug 2025View
Sang management plan part bApplication Document · PDF18 Aug 2025View
Accurate visual representationsApplication Document · PDF18 Aug 2025View
Superseded lightingApplication Document · PDF18 Aug 2025View
Legislation, policy & guidance reportApplication Document · PDF18 Aug 2025View
Construction, noise & vibration assumptionsApplication Document · PDF18 Aug 2025View
Site suitability studyApplication Document · PDF18 Aug 2025View
Waste reportApplication Document · PDF18 Aug 2025View
Air quality appendixApplication Document · PDF18 Aug 2025View
Ph 1 contamination assessment - part 2Application Document · PDF18 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Last Site Notice Posted Date

    Published milestoneCouncil source
  6. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.