Council planning record
James Paget University Hospital Lowestoft Road Gorleston NR31 6LA
Last published check: 13 Oct 2026, 20:27. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceHybrid planning application seeking: (1) Full planning permission for construction of enabling works for the new James Paget University Hospital to include: site clearance, multi-storey car park, surface level car park, three accesses to Woodfarm Lane, temporary pedestrian path to existing hospital, drainage works and associated infrastructure and landscaping. (2) Outline planning permission for the demolition of existing hospital buildings and development of the proposed new James Paget University Hospital (Use Class C2) along with associated ancillary uses and buildings, hospital buildings, temporary construction compound, car parking, energy centre, electrical substation, replacement helipad, associated highway works, landscaping, utilities and infrastructure. All matters reserved for future determination except access points at site boundary
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsJames Paget University Hospital Lowestoft Road Gorleston NR31 6LA
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Natural Environment TeamDC Planning App - Consultation Response (statutory) | 5 Aug 2026 | View |
| National HighwaysDC Planning App - Consultation Response (statutory) | 3 Aug 2026 | View |
| National HighwaysDC Planning App - Consultation Response (statutory) | 24 Jun 2026 | View |
| Ministry of DefenceDC Planning App - Consultation Response (statutory) | 19 Jun 2026 | View |
| National HighwaysDC Planning App - Consultation Response (statutory) | 1 May 2026 | View |
| National HighwaysDC Planning App - Consultation Response (statutory) | 27 Mar 2026 | View |
| Historic England - Supplementary comments on ArchaeologyDC Planning App - Consultation Response (statutory) | 23 Mar 2026 | View |
| JPUH Open Mosaic Habitats on Previously Developed Land Classification 18 03 2026Planning App - Other Supporting Documents | 19 Mar 2026 | View |
| LLFADC Planning App - Consultation Response (statutory) | 9 Mar 2026 | View |
| Public ObjectionDC Planning App - Consultation Response (public) | 25 Feb 2026 | View |
| Environmental HealthDC Planning App - Consultation Response (statutory) | 12 Feb 2026 | View |
| North Denes AirfieldDC Planning App - Consultation Response (statutory) | 11 Feb 2026 | View |
| Fire Water OfficerDC Planning App - Consultation Response (statutory) | 11 Feb 2026 | View |
| Historic EnvironmentDC Planning App - Consultation Response (statutory) | 10 Feb 2026 | View |
| Consultation Response - ArboriculturalDC Planning App - Consultation Response (statutory) | 9 Feb 2026 | View |
| Consultation Response - HighwaysDC Planning App - Consultation Response (statutory) | 9 Feb 2026 | View |
| EcologyDC Planning App - Consultation Response (statutory) | 6 Feb 2026 | View |
| LLFA Extension of Time Request - agreed if requiredDC Planning App - Consultation Response (statutory) | 5 Feb 2026 | View |
| Written Scheme of Investigation - Archaeology - Area 1Planning App - Other Supporting Documents | 5 Feb 2026 | View |
| Public comments and objections x 3DC Planning App - Consultation Response (public) | 4 Feb 2026 | View |
| National HighwaysDC Planning App - Consultation Response (statutory) | 3 Feb 2026 | View |
| Public objections and comments x 3DC Planning App - Consultation Response (public) | 3 Feb 2026 | View |
| ConservationDC Planning App - Consultation Response (statutory) | 30 Jan 2026 | View |
| Consultation Response - Belton&Browston Parish CouncilDC Planning App - Consultation Response (statutory) | 29 Jan 2026 | View |
| Consultation Response - Green Infrastructure Officer (PRoW)DC Planning App - Consultation Response (statutory) | 29 Jan 2026 | View |
| East Suffolk CouncilDC Planning App - Consultation Response (statutory) | 29 Jan 2026 | View |
| Public Health PlanningDC Planning App - Consultation Response (statutory) | 27 Jan 2026 | View |
| Consultation response - Natural EnglandDC Planning App - Consultation Response (statutory) | 27 Jan 2026 | View |
| Site Notice Location Map North and East SidesDC Planning App - Site Notice Plan | 23 Jan 2026 | View |
| Parish - No ObjectionDC Planning App - Consultation Response (statutory) | 23 Jan 2026 | View |
| Site Notice Location Map South and West SidesDC Planning App - Site Notice Plan | 23 Jan 2026 | View |
| Anglian WaterDC Planning App - Consultation Response (statutory) | 22 Jan 2026 | View |
| DC Planning App - Site NoticeDC Planning App - Site Notice | 22 Jan 2026 | View |
| Environment AgencyDC Planning App - Consultation Response (statutory) | 20 Jan 2026 | View |
| Historic EnvironmentDC Planning App - Consultation Response (statutory) | 20 Jan 2026 | View |
| 1043 - public comments x4DC Planning App - Consultation Response (public) | 19 Jan 2026 | View |
| Historic EnglandDC Planning App - Consultation Response (statutory) | 14 Jan 2026 | View |
| Public ObjectionDC Planning App - Consultation Response (public) | 9 Jan 2026 | View |
| Active Travel EnglandDC Planning App - Consultation Response (statutory) | 7 Jan 2026 | View |
| Public objectionDC Planning App - Consultation Response (public) | 5 Jan 2026 | View |
| Norwich Airport ResponseDC Planning App - Consultation Response (statutory) | 2 Jan 2026 | View |
| Norfolk ConstabularyDC Planning App - Consultation Response (statutory) | 2 Jan 2026 | View |
| National Air Traffic ServicesDC Planning App - Consultation Response (statutory) | 2 Jan 2026 | View |
| Cadent GasDC Planning App - Consultation Response (statutory) | 2 Jan 2026 | View |
| Mineral Planning AuthorityDC Planning App - Consultation Response (statutory) | 2 Jan 2026 | View |
| Cadent Gas asset location plansDC Planning App - Consultation Response (statutory) | 2 Jan 2026 | View |
| Cadent GasDC Planning App - Consultation Response (statutory) | 2 Jan 2026 | View |
| Resilience OfficerDC Planning App - Consultation Response (statutory) | 2 Jan 2026 | View |
| Internal Drainage BoardDC Planning App - Consultation Response (statutory) | 24 Dec 2025 | View |
| Application FormPlanning App - New Application Form | 22 Dec 2025 | View |
| Planning Statement (RGP-BID-XX-XX-RP-T-00002, December 2025)Planning App - Planning Statement | 22 Dec 2025 | View |
| RGP-WSP-XX-L0-DR-E-60014-P03 Electrical Systems External Services Layout External Lighting ServicePlanning App - Plans | 5 Dec 2025 | View |
| RGP-WSP-XX-L0-DR-E-60015-P02 Electrical Systems External Services Layout External Lighting ServicePlanning App - Plans | 5 Dec 2025 | View |
| RGP-WSP-V1-XX-DR-L-00101-P04 Indicative Landscape SectionsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-WSP-V1-XX-DR-L-00001-P02 Landscape GAPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12600-P04 MSCP Proposed Building SectionsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12501-P04 MSCP Proposed North and South ElevationsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12500-P04 MSCP Proposed East and West ElevationsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-RF-DR-A-110RF-P04 MSCP Proposed Floor Plan Level RoofPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L11-DR-A-11011-P04 MSCP Proposed Floor Plan Level 11Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L10-DR-A-11010-P04 MSCP Proposed Floor Plan Level 10Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L9-DR-A-11009-P04 MSCP Proposed Floor Plan Level 09Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L8-DR-A-11008-P04 MSCP Proposed Floor Plan Level 08Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L7-DR-A-11007-P04 MSCP Proposed Floor Plan Level 07Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L6-DR-A-11006-P04 MSCP Proposed Floor Plan Level 06Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L5-DR-A-11005-P04 MSCP Proposed Floor Plan Level 05Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L4-DR-A-11004-P04 MSCP Proposed Floor Plan Level 04Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L3-DR-A-11003-P04 MSCP Proposed Floor Plan Level 03Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L2-DR-A-11002-P04 MSCP Proposed Floor Plan Level 02Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L1-DR-A-11001-P04 MSCP Proposed Floor Plan Level 01Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-L0-DR-A-11000_P04 MSCP Proposed Floor Plan Level 00Planning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-10206-P04 MSCP Site Section BB Existing and ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-10205-P04 MSCP Site Section AA Existing and ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-10204-P04 MSCP Surface Parking - PermanentPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-10203-P04 MSCP Surface Parking - TemporaryPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-10202-P04 MSCP Proposed Site Temporary Access Path - Details and LayoutPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-10201-P04 MSCP Proposed Site PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-10200-P04 MSCP Existing Site PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12014-P05 Enabling Works - Contaminated Land ClearancePlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12013-P06 Enabling Works - S278 JunctionsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12011-P05 Enabling Works - Fence DemolishedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12010-P06 Enabling Works - Fence and Hoarding ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12009-P05 Enabling Works Package B - Tree and Soft Landscape ClearancePlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12003-P05 Enabling Works - Site ClearancePlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-12000-P06 Enabling Works Site PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63019-P04 Illustrative Section GG - Demolition DrawingsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63018-P04 Illustrative Section DD - EE - FF Demolition DrawingsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63017-P04 Illustrative Section AA - BB - CC Demolition DrawingsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63016-P04 Illustrative Section GG - Existing & ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63015-P04 Illustrative Section FF - Existing & ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63014-P04 Illustrative Section EE - Existing & ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63013-P04 Illustrative Section DD - Existing & ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63012-P04 Illustrative Section CC - Existing & ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63011-P04 Illustrative Section BB - Existing & ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-ZZ-DR-A-63010-P04 Illustrative Section AA - Existing & ProposedPlanning App - Plans | 5 Dec 2025 | View |
| RGP-AAM-XX-XX-DR-L-69031-P03 Illustrative Buffer Planting Section CCPlanning App - Plans | 5 Dec 2025 | View |
| RGP-AAM-XX-XX-DR-L-69030-P03 Illustrative Buffer Planting Sections AA & BBPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-66005-P05 Illustrative Phase 5 WorksPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-66004-P05 Illustrative Phase 4 WorksPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-66003-P06 Illustrative Phase 3 WorksPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-66002-P06 Illustrative Phase 2 WorksPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-66001-P05 Illustrative Phase 1 WorksPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-69020-P04 Illustrative Plan - Sitewide Car Parking & Motorbike NumbersPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-69013-P05 Illustrative Plan - Existing UtilitiesPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-69012-P05 Illustrative Plan - Pedestrian and Cyclist RoutesPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-69011-P05 Illustrative Plan - Hospital Vehicular RoutesPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-69010-P05 Illustrative Plan - Public Vehicular RoutesPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-69002-P05 Illustrative Block PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-AAM-XX-XX-DR-L-69001-P03 Illustrative Landscape MasterplanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-68004-P05 Parameter Plan - Site AccessPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-68003-P05 Parameter Plan - Maximum Development HeightsPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-68002-P05 Parameter Plan - Land Use FrameworkPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-68001-P04 Parameter Plan - Demolition and ClearancePlanning App - Plans | 5 Dec 2025 | View |
| RGP-AAM-XX-XX-DR-L-68005-P03 Parameter Plan - Buffer Tree Planting PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-67016-P03 Existing Topography SurveyPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-67015-P05 Existing Tree Survey PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-67012-P05 Hybrid Application Designation PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-67010-P05 EIA Site Boundary PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-67004-P04 Site Ownership PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-67002-P05 Site Location PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-67001-P05 Site Context PlanPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-40002-P05 Illustrative Intervention Site StrategyPlanning App - Plans | 5 Dec 2025 | View |
| RGP-PWA-XX-XX-DR-A-40001-P05 Existing Estate PlanPlanning App - Plans | 5 Dec 2025 | View |
| Environmental Statement Vol 3 - Non-Technical Summary (November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter19 - Wind Microclimate - Appendix 19.1 Wind Microclimate StudyPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter18 - Waste - Appendix 18.1 Operational landfill sites in East of England Region (2023)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter17 - Transport -Appendix 17.3 Framework Green Travel PlanPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter17 - Transport -Appendix 17.2 Transport Assessment_Part5Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter17 - Transport -Appendix 17.2 Transport Assessment_Part4Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter17 - Transport -Appendix 17.2 Transport Assessment_Part3Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter17 - Transport -Appendix 17.2 Transport Assessment_Part2Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter17 - Transport -Appendix 17.2 Transport Assessment_Part1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter17 - Transport - Appendix 17.1 Assessed Two-Way Links (including wider scale)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter15 - Noise & Vibration - Appendix 15.3 Construction Noise AssessmentPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter15 - Noise & Vibration - Appendix 15.2 Baseline Noise SurveyPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter15 - Noise & Vibration - Appendix 15.1 Legislation and GuidancePlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.8 Landscape Character AssessmentsPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.7 Residential Visual Amenity AssessmentPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.6 Visual Assessment SheetsPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.5 Landscape Assessment SheetsPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.4 LVIA MethodologyPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.3 Type 4 Visualisations_Part2Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.3 Type 4 Visualisations_Part1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.2 Viewpoint PhotographyPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter14 - Landscape & Visual - Appendix 14.1 LVIA Figures 1-12Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter13 - Ground Conditions - Appendix 13.4 Best & Most Versatile Agri Land TNPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter13 - Ground Conditions - Appendix 13.3 Minerals Resource AssessmentPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter13 - Ground Conditions - Appendix 13.2 GQRA Phase 2 Report Part 2Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter13 - Ground Conditions - Appendix 13.2 GQRA Phase 2 Report Part 1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter13 - Ground Conditions - Appendix 13.1 Preliminary Risk Assessment Part 2Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter13 - Ground Conditions - Appendix 13.1 Preliminary Risk Assessment Part 1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter12 - Flood Risk & Drainage - Appendix 12.1 FRA & Drainage Strategy - Part6Planning App - Flood Risk and/or Drainage Assessment | 5 Dec 2025 | View |
| E/S - Chapter12 - Flood Risk & Drainage - Appendix 12.1 FRA & Drainage Strategy - Part5Planning App - Flood Risk and/or Drainage Assessment | 5 Dec 2025 | View |
| E/S - Chapter12 - Flood Risk & Drainage - Appendix 12.1 FRA & Drainage Strategy - Part4Planning App - Flood Risk and/or Drainage Assessment | 5 Dec 2025 | View |
| E/S - Chapter12 - Flood Risk & Drainage - Appendix 12.1 FRA & Drainage Strategy - Part3Planning App - Flood Risk and/or Drainage Assessment | 5 Dec 2025 | View |
| E/S - Chapter12 - Flood Risk & Drainage - Appendix 12.1 FRA & Drainage Strategy - Part2Planning App - Flood Risk and/or Drainage Assessment | 5 Dec 2025 | View |
| E/S - Chapter12 - Flood Risk & Drainage - Appendix 12.1 FRA & Drainage Strategy - Part1Planning App - Flood Risk and/or Drainage Assessment | 5 Dec 2025 | View |
| E/S - Chapter11 - Daylight & Sunlight - Appendix 11.3 Detailed Overshadowing ResultsPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter11 - Daylight & Sunlight - Appendix 11.2 DSO Results on PropertiesPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter11 - Daylight & Sunlight - Appendix 11.1 DSO Sensitive ReceptorsPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter10 - Climate Change Resilience - Appendix 10.1 Climate Change RAPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter8 - Built Heritage - Appendix 8.2 Heritage Impact AssessmentPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter8 - Built Heritage - Appendix 8.1 Archaeological DBA and Heritage AppraisalPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.6 Black Redstart ReportPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.4 GLTA and PRA Bat Report_Part3Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.4 GLTA and PRA Bat Report_Part2Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.4 GLTA and PRA Bat Report_Part1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.3b Statutory Biodiversity MetricPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.3a Statutory Biodiversity Metric - Phase 1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.3 BNG ReportPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.2 Preliminary Ecological Appraisal Report, October 2025LRPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter7 - Biodiversity - Appendix 7.1 Preliminary Ecological Appraisal Report - October 2023Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter6 - Air Quality - Appendix 6.2 Dispersion Modelling Methodology & Assessment InputsPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter6 - Air Quality - Appendix 6.1 Construction Dust Assessment MethodologyPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter4 - Proposed Development - Appendix 4.1 Parameter Plans & Illustrative Masterplan Plan3Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter4 - Proposed Development - Appendix 4.1 Parameter Plans & Illustrative Masterplan Plan2Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter4 - Proposed Development - Appendix 4.1 Parameter Plans & Illustrative Masterplan Part1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter4 - Proposed Development - Appendix 4.1 Detailed Drawings Part 1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter4 - Proposed Development - Appendix 4.1 Detailed Drawings Part 2Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter2 - Methodology - Appendix 2.3 Archaeological Trial Trenching Ev2024Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter2 - Methodology - Appendix 2.2 GYBC Scoping OpinionPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter2 - Methodology - Appendix 2.1 JPUH Scoping Report March 2025_Part2Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| E/S - Chapter2 - Methodology - Appendix 2.1 JPUH Scoping Report March 2025_Part1Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Environmental Statement Vol 1 - Main Report (November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Energy Statement - Hospital Building (RGP-WSP-XX-XX-RP-J-50001 Rev3, November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Energy Statement - MultiStorey Car Park (RGP-WSP-V1-ZZ-RP-X-00001, November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Construction Management Plan (RGP-PWA-XX-XX-RP-A-00009, November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Utilities Statement_Part3 (RGP-WSP-XX-UG-RP-J-50001 Rev3)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Utilities Statement_Part2 (RGP-WSP-XX-UG-RP-J-50001 Rev3)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Utilities Statement_Part1 (RGP-WSP-XX-UG-RP-J-50001 Rev3, November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Lighting Management Plan (Works phase) Issue01 (November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Lighting Assessment Issue01 Part2 (RGP-BID-XX-XX-RP-T-00004, November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Lighting Assessment Issue01 Part1 (RGP-BID-XX-XX-RP-T-00004, November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Arboricultrual Method Statement (RGP-BID-XX-XX-RP-T-00008, survey date 18 June 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Arboricultrual Impact Assessment (RGP-BID-XX-XX-RP-T-00003, October 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Statement of Community Involvement (RGP-BID-XX-XX-RP-T-00005, October 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| SUPERSEDED Planning Statement (RGP-BID-XX-XX-RP-T-00002, November 2025)Planning App - Planning Statement | 5 Dec 2025 | View |
| D&AS 10SustainablePublicBenefits (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 09EnablingWorks - Part5 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 09EnablingWorks - Part4 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 09EnablingWorks - Part3 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 09EnablingWorks - Part2 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 09EnablingWorks - Part1 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 08Phasing (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 07Access (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 06Landscape - Part2 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 06Landscape - Part1 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 05Masterplan - Part4 (RGP-PWA-XX-XX-RP-A-00008 )Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 05Masterplan - Part3 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 05Masterplan - Part2 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 05Masterplan - Part1 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 04DesignDevelopment (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 03Vision&Concept (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 02Site&Context - Part3 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 02Site&Context - Part2 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 02Site&Context - Part1 (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 01Introduction (RGP-PWA-XX-XX-RP-A-00008)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| D&AS 00Contents (RGP-PWA-XX-XX-RP-A-00008, November 2025)Planning App - Design and Access Statement | 5 Dec 2025 | View |
| Drawing & Document Register (28 November 2025)Planning App - Other Supporting Documents | 5 Dec 2025 | View |
| Cover LetterPlanning App - Other Supporting Documents | 5 Dec 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.