Council planning record

LISTED BUILDING APPLICATION - REPAIRS AND IMPROVEMENTS TO INCLUDE REMOVAL OF THE PARAPET FROM THE TWO STOREY SECTION OF THE BUILDING, INSTALL NEW SLATE ROOF WITH INSULATED BUILD UP TO WEST RANGE, REPOINT EXTERNAL WALLS AND PATCH REPOINT INTERNALLY, REPLACE 4NO. WINDOWS AND UNDERTAKE REPAIRS TO REMAINDER, RAISE 7NO. INTERNAL LINTELS AND DOORS BY 150MM ALONG THE FIRST FLOOR, REMOVE ALL POST WAR RAINWATER GOODS SERVING THE FLAT ROOF AND REMOVE INTERNAL DOWNPIPES FOUND WITHIN THE CENTRAL RANGE AND REMOVE OF MECHANICAL AND ELECTRICAL SERVICES (CONSERVATION AREA) (as amplified by e-mail dated 29.10.24)

Rum Store Victoria Quay Weevil Lane Gosport Hampshire

Grant Listed Building ConsentReference: 24/00305/LBAGosport Borough Council

Last published check: 21 Sept 2026, 12:04. Check the council record for more recent changes.

Application location

Rum Store Victoria Quay Weevil Lane Gosport Hampshire

This record has no verified map location.

View council map

Application summary

Status
Grant Listed Building Consent
Application type
Listed Building
Received
13 Sept 2024
Validated
13 Sept 2024
Determination deadline
8 Nov 2024
Local authority
Gosport Borough Council

Application overview

LISTED BUILDING APPLICATION - REPAIRS AND IMPROVEMENTS TO INCLUDE REMOVAL OF THE PARAPET FROM THE TWO STOREY SECTION OF THE BUILDING, INSTALL NEW SLATE ROOF WITH INSULATED BUILD UP TO WEST RANGE, REPOINT EXTERNAL WALLS AND PATCH REPOINT INTERNALLY, REPLACE 4NO. WINDOWS AND UNDERTAKE REPAIRS TO REMAINDER, RAISE 7NO. INTERNAL LINTELS AND DOORS BY 150MM ALONG THE FIRST FLOOR, REMOVE ALL POST WAR RAINWATER GOODS SERVING THE FLAT ROOF AND REMOVE INTERNAL DOWNPIPES FOUND WITHIN THE CENTRAL RANGE AND REMOVE OF MECHANICAL AND ELECTRICAL SERVICES (CONSERVATION AREA) (as amplified by e-mail dated 29.10.24)

Proposal details

Reference
24/00305/LBA
Alternative references
PP-13400061
Ward
Forton
Agent
Pritchard Architecture

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 50 of 50

DocumentPublishedAction
Officer ReportOfficer Report · PDF6 Nov 2024View
Decision NoticeDecision Notice · PDF6 Nov 2024View
CONSERVATION AND DESIGNConsultee Comment · PDF5 Nov 2024View
GOSPORT SOCIETYConsultee Comment · PDF9 Oct 2024View
MS MARAL MIRI HCC ECOLOGYConsultee Comment · PDF17 Sept 2024View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF13 Sept 2024View
LOCATION PLANApproved Plans · PDF13 Sept 2024View
SITE PLAN AS EXISTINGPlans · PDF13 Sept 2024View
NORTH ELEVATION - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
SOUTH ELEVATION - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
EAST ELEVATION E01 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
EAST ELEVATION E02 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
EAST ELEVATION E03 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
WEST ELEVATION W01 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
WEST ELEVATION W02 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
WEST ELEVATION W03 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
WINDOW SCHEDULE W01-W18Approved Plans · PDF13 Sept 2024View
WINDOW SCHEDULE W19-W35Approved Plans · PDF13 Sept 2024View
WINDOW SCHEDULE W36-W53Approved Plans · PDF13 Sept 2024View
WINDOW SCHEDULE W54-W70Approved Plans · PDF13 Sept 2024View
WINDOW SCHEDULE W71-W88Approved Plans · PDF13 Sept 2024View
EXTERNAL DOOR SCHEDULE DE01-DE05Approved Plans · PDF13 Sept 2024View
EXTERNAL DOOR SCHEDULE DE06-DE12Approved Plans · PDF13 Sept 2024View
EXTERNAL DOOR SCHEDULE DE13-DE18Approved Plans · PDF13 Sept 2024View
INTERNAL DOOR SCHEDULE D01-D04Approved Plans · PDF13 Sept 2024View
INTERNAL DOOR SCHEDULE D05-D09Approved Plans · PDF13 Sept 2024View
INTERNAL DOOR SCHEDULE DE10-D13Approved Plans · PDF13 Sept 2024View
INTERNAL DOOR SCHEDULE DE14-D23Approved Plans · PDF13 Sept 2024View
WINDOW REPAIRS - STANDARD DETAILSApproved Plans · PDF13 Sept 2024View
DOOR REPAIRS - STANDARD DETAILSApproved Plans · PDF13 Sept 2024View
GROUND, FIRST & SECOND FLOOR PLANSApproved Plans · PDF13 Sept 2024View
GROUND, FIRST & SECOND FLOOR RCP - REPAIRSApproved Plans · PDF13 Sept 2024View
G01 INTERNAL ELEVATIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G02 INTERNAL ELEVATIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G03 INTERNAL ELEVATIONS SHEET 1 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G03 INTERNAL ELEVATIONS SHEET 2 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G04 INTERNAL ELEVATIONS SHEET 1 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G04 INTERNAL ELEVATIONS SHEET 2 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G05 & G08 INTERNAL ELEVATIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G07 INTERNAL ELEVAIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G06 INTERNAL ELEVATIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G09 INTERNAL ELEVATIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G10 INTERNAL ELEVATIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
G11 INTERNAL ELEVATIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
F01 INTERNAL ELEVATIONS SHEET 1 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
F01 INTERNAL ELEVATIONS SHEET 2 - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
F02 & S01 INTERNAL ELEVATIONS - REPAIR SCHEDULEApproved Plans · PDF13 Sept 2024View
DESIGN AND ACCESS STATEMENTDesign and Access Statement · PDF13 Sept 2024View
EXTENDED PHASE I ECOLOGICAL ASSESSMENT & PHASE II BAT SURVEYApproved Plans · PDF13 Sept 2024View
DRAWING ISSUE SHEETSupporting Document · PDF13 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Standard Consultation Date

    Published milestoneCouncil source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision Issued Date

    Published milestoneCouncil source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant Listed Building Consent
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.