Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Police Barracks Building 85 Fort Blockhouse Haslar Road Gosport Hampshire PO12 2AB
Last published check: 27 Sept 2026, 23:02. Check the council record for more recent changes.
Police Barracks Building 85 Fort Blockhouse Haslar Road Gosport Hampshire PO12 2AB
This record has no verified map location.
View council mapLISTED BUILDING APPLICATION - (A) INSTALLATION OF NEW KITCHENETTE, CLEANERS CUPBOARD AND TOILETS INCLUDING ACCESSIBLE TOILET AND SHOWER WITH ASSOCIATED DRAINAGE AND BUILDING SERVICES TO FACILITATE USE OF FORMER POLICE BARRACKS AS OFFICES, CANTEEN AND MEETING AND CLASSROOM (B) INSTALLATION OF NEW FLOORS AND FLOOR FINISHES; (C) REINSTATEMENT OF LATH & PLASTER CEILINGS, REINSTATEMENT AND INSTALLATION OF NEW PLASTERBOARD CEILINGS; (D) WIDENING DOOR OPENING AND REMOVAL OF CONCRETE FLOOR SLAB; (E) REFURBISHMENT AND REPLACEMENT OF EXISTING NON-ORIGINAL FIREPLACES; (F) INSTALLATION OF NEW DOORS, SKIRTINGS AND PICTURE RAILS; (G) THERMAL IMPROVEMENTS TO BUILDING TO INCLUDE INSTALLATION OF INSULATED ROOFS, WALLS AND FLOORS; (H) INSTALLATION OF SECONDARY GLAZING; (I) INSTALLATION OF FIRE SAFETY MEASURES; (J) INSTALLATION OF NEW HEATING AND MECHANICAL VENTILATION SYSTEMS WITH ASSOCIATED BOILER, ROOF MOUNTED PLANT AND STRUCTURAL SUPPORT GRILLAGE; (K) INSTALLATION OF NEW POWER SUPPLIES AND INTERNAL AND EXTERNAL LIGHTING AND PROJECTION EQUIPMENT, FIRE ALARM AND SECURITY SYSTEMS WITH ASSOCIATED EXTERNAL WORKS AND UTILITIES; AND, (L) REMOVAL OF EXISTING METAL RAILS TO COLONNADE AND INSTALLATION OF NEW METAL HANDRAIL
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| CONSERVATION OFFICERConsultee Comment · PDF | 16 Jun 2022 | View |
| Officer ReportOfficer Report · PDF | 16 Jun 2022 | View |
| PLAN FOR HISTORIC RECORDSupporting Document · PDF | 16 Jun 2022 | View |
| PHOTOS FOR HISTORIC RECORDSupporting Document · PDF | 16 Jun 2022 | View |
| Decision NoticeDecision Notice · PDF | 16 Jun 2022 | View |
| APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF | 21 Apr 2022 | View |
| HERITAGE, DESIGNDesign and Access Statement · PDF | 21 Apr 2022 | View |
| SITE LOCATION PLANApproved Plans · PDF | 21 Apr 2022 | View |
| PROPOSED SITE PLANApproved Plans · PDF | 21 Apr 2022 | View |
| BIODIVERSITY SURVEY AND REPORTSupporting Document · PDF | 21 Apr 2022 | View |
| FLOOD MAP FOR PLANNINGPlans · PDF | 21 Apr 2022 | View |
| PHOTOGRAPHS AND PHOTOMONTAGESPhoto · PDF | 21 Apr 2022 | View |
| GROUND FLOOR GA PLAN PROPOSEDApproved Plans · PDF | 21 Apr 2022 | View |
| ROOF PLAN - PROPOSEDApproved Plans · PDF | 21 Apr 2022 | View |
| PROPOSED SECTION A AApproved Plans · PDF | 21 Apr 2022 | View |
| PROPOSED SECTION B BApproved Plans · PDF | 21 Apr 2022 | View |
| ACCESSIBLE TOILET AND SHOWER PLAN AND ELEVATIONSApproved Plans · PDF | 21 Apr 2022 | View |
| UNISEX TOILETS AND SHOWER PLANApproved Plans · PDF | 21 Apr 2022 | View |
| REFLECTED CEILING PLANApproved Plans · PDF | 21 Apr 2022 | View |
| NORTH AND SOUTH ELEVATIONS PROPOSEDApproved Plans · PDF | 21 Apr 2022 | View |
| EAST AND WEST ELEVATIONS PROPOSEDApproved Plans · PDF | 21 Apr 2022 | View |
| PROPOSED WINDOW DETAILS W8-W10 AND OPTION 1Approved Plans · PDF | 21 Apr 2022 | View |
| COLONNADE RAMPED ACCESSApproved Plans · PDF | 21 Apr 2022 | View |
| ROOM 7 SLAB DETAILSApproved Plans · PDF | 21 Apr 2022 | View |
| STEELWORK PLANApproved Plans · PDF | 21 Apr 2022 | View |
| STEELWORK ROOF GRILLAGE BEARING BRACKET DETAILSApproved Plans · PDF | 21 Apr 2022 | View |
| BRACKET BEARING DETAILApproved Plans · PDF | 21 Apr 2022 | View |
| SMALL POWER AND ANCILLARY SERVICES DRAWINGPRELIMINARY ISSUEApproved Plans · PDF | 21 Apr 2022 | View |
| LIGHTING SERVICES DRAWING TENDER ISSUEApproved Plans · PDF | 21 Apr 2022 | View |
| HEATING SERVICES DRAWING TENDER ISSUEApproved Plans · PDF | 21 Apr 2022 | View |
| DOMESTIC WATER SERVICES DRAWING TENDER ISSUEApproved Plans · PDF | 21 Apr 2022 | View |
| DRAINAGE SERVICES DRAWING TENDER ISSUEApproved Plans · PDF | 21 Apr 2022 | View |
| VENTILATION SERVICES DRAWING TENDER ISSUEApproved Plans · PDF | 21 Apr 2022 | View |
| REFURBISHMENT - DOOR AND IRONMONGERY SCHEDULEApproved Plans · PDF | 21 Apr 2022 | View |
| TYPICAL CROSS SECTIONS THROUGH WINDOWApproved Plans · PDF | 21 Apr 2022 | View |
| INTERNAL WALL INSULATION SYSTEMSupporting Document · PDF | 21 Apr 2022 | View |
| FIRE SAFETY PLANApproved Plans · PDF | 21 Apr 2022 | View |
| REFURBISHMENT - FIREPLACESAmended Plans · PDF | 21 Apr 2022 | View |
| SPECIFICATION FOR POLICE BARRACKS REFURBISHMENT 2022Approved Plans · PDF | 21 Apr 2022 | View |
| SPECIFICATION FOR THE BUILDING SERVICES ENGINEERINGApproved Plans · PDF | 21 Apr 2022 | View |
| HEATING SCHEDULEApproved Plans · PDF | 21 Apr 2022 | View |
| SUMMARY OF ORIGINAL DECORATIONSupporting Document · PDF | 21 Apr 2022 | View |
| GROUND FLOOR - PROPOSED FLOOR FINISHESApproved Plans · PDF | 21 Apr 2022 | View |
| UNDERFLOOR VENT AND FLOOR INSULATION DETAILSApproved Plans · PDF | 21 Apr 2022 | View |
| GROUND FLOOR PLAN PROPOSED U/FLOOR VENTSApproved Plans · PDF | 21 Apr 2022 | View |
| GROUND FLOOR PLAN PROPOSEDApproved Plans · PDF | 21 Apr 2022 | View |
| INSULATION DETAILS - DOORSApproved Plans · PDF | 21 Apr 2022 | View |
| INSULATION DETAILS - GENERALApproved Plans · PDF | 21 Apr 2022 | View |
| REFURBISHMENT FIREPLACESApproved Plans · PDF | 21 Apr 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.