ApprovedCouncil status: Unknown

The proposal involves the installation of a 20-metre Valmont street works monopole, equipped with 2 GPS nodes at the top. The structure will support a total of 9 antennas positioned at heights of 16.32m, 18.22m, and 19.52m, along with 2 x 300mm transmission dishes at 13.62m. Additionally, 6 equipment cabinets will be installed at ground level, along with associated ancillary equipment as detailed in the accompanying drawings.

GLO103 - TCM Finlay Road Gloucester

Gloucester City CouncilReference 25/01079/TCMTelecomunication Masts

Last published check: 28 Sept 2026, 11:10. Check the council record for more recent changes.

Status and dates

Last published check: 28 Sept 2026, 11:10 (UK)

  1. DoneReceived9 Dec 2025
  2. DoneValidated17 Dec 2025
  3. ClosedConsultationEnded 25 Feb 2026
  4. Date set by councilAgreed decision date4 Mar 2026
  5. DecidedGrant prior approval telecom mast4 Mar 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (15)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Standard Consultation Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision Issued Date

    Published milestoneCouncil source
  11. Decision Made Date

    Published milestoneCouncil source
  12. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  13. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Telecomunication Masts
Ward
Tuffley
Documents
35 published

Proposal

The proposal involves the installation of a 20-metre Valmont street works monopole, equipped with 2 GPS nodes at the top. The structure will support a total of 9 antennas positioned at heights of 16.32m, 18.22m, and 19.52m, along with 2 x 300mm transmission dishes at 13.62m. Additionally, 6 equipment cabinets will be installed at ground level, along with associated ancillary equipment as detailed in the accompanying drawings.

Reference
25/01079/TCM
Alternative references
PP-14542425
Ward
Tuffley
Agent
DOT Surveying Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Delegated ReportDelegated Report4 Mar 2026View
  • Decision NoticeDecision4 Mar 2026View
  • Highways commentsConsultee Comment1 Mar 2026View
  • Neighbour comment 18Comment23 Feb 2026View
  • Neighbour comment 17Comment21 Feb 2026View
  • Neighbour comment 14Comment17 Feb 2026View
  • Neighbour comment 15Comment17 Feb 2026View
  • Neighbour comment 16Comment17 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Grant prior approval telecom mast
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.