Maintenance repair work to a roof timber truss, reduction of a chimney, removal of redundant metal fire escape and various repairsusing materials to match the existing inc. timber doors, windows and re-pointing to damaged mortar.Roof Timber repair, The proposal is to repair a timber truss within the roof structure of the listed building by splicing in new timber. Thismethod will ensure the truss is structurally sound while preserving the overall architectural integrity and historical significance of the building.Chimney Proposed reduction in height, The proposal is to reduce the chimney in height by approximately two meters as following a structural survey theexisting chimney is leaning into the roof. The existing chimney is capped off and non-operational.Apply a liquid overlay roof system to two flat room areas to provide protection and waterproofing to the flat roofs.Remove redundant fire escape and infill metal doors with reclaimed bricks. Remove existing redundant metal fire escape and make good to render and mortar with like for like repairs. Remove existing fire door and frame, infill with reclaimed bricks from the property (from reduced chimney stack).Removal of a small skylight (not original fabric of the building) and making good to the roof using material to match the existing.
Santander 6 - 8 Westgate Street Gloucester GL1 2NL
Maintenance repair work to a roof timber truss, reduction of a chimney, removal of redundant metal fire escape and various repairsusing materials to match the existing inc. timber doors, windows and re-pointing to damaged mortar.Roof Timber repair, The proposal is to repair a timber truss within the roof structure of the listed building by splicing in new timber. Thismethod will ensure the truss is structurally sound while preserving the overall architectural integrity and historical significance of the building.Chimney Proposed reduction in height, The proposal is to reduce the chimney in height by approximately two meters as following a structural survey theexisting chimney is leaning into the roof. The existing chimney is capped off and non-operational.Apply a liquid overlay roof system to two flat room areas to provide protection and waterproofing to the flat roofs.Remove redundant fire escape and infill metal doors with reclaimed bricks. Remove existing redundant metal fire escape and make good to render and mortar with like for like repairs. Remove existing fire door and frame, infill with reclaimed bricks from the property (from reduced chimney stack).Removal of a small skylight (not original fabric of the building) and making good to the roof using material to match the existing.
Reference
25/00362/LBC
Alternative references
PP-13968920
Ward
Westgate
Agent
Santander
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.