Council planning record

Installation of solar PV panels on the upper level of the multi-storey car park (amended 26/01/24).

Baltic Campus Quarryfield Road Gateshead

DecidedReference: DC/23/01071/FULGateshead Metropolitan Borough Council

Last published check: 30 Sept 2026, 20:42. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Full Application
Received
18 Dec 2023
Validated
19 Dec 2023
Determination deadline
13 Feb 2024
Local authority
Gateshead Metropolitan Borough Council

Application overview

Installation of solar PV panels on the upper level of the multi-storey car park (amended 26/01/24).

Proposal details

Reference
DC/23/01071/FUL
Ward
Bridges
Agent
xsite architecture LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Baltic Campus Quarryfield Road Gateshead

This record has no verified map location.

View council map

Documents 20 of 20

DocumentPublishedAction
1071 officer reportOfficers Report6 Feb 2024View
Approval Certificate FULApproval Certificate FUL6 Feb 2024View
amended - 2312 XA DR 2100 P3.1 Existing and Proposed Front Elevation NEAmended Plans - Elevations30 Jan 2024View
amended - 2312 XA DR 2200 P3.1 Existing and Proposed SectionsAmended Plans30 Jan 2024View
amended - 2312 XA DR 2300 P3.1 Proposed Perspective 3D ViewsAmended Plans30 Jan 2024View
amended - 2312 XA DR 2007 P1.2 Proposed PV Assembly PlanAmended Plans30 Jan 2024View
amended - 2312 XA DR 2008 P1.1 Proposed Indicative Drainage Plan DetailAmended Plans30 Jan 2024View
2312 XA DR 2300 P3.0 Proposed Perspective 3D ViewsSuperseded Plans18 Dec 2023View
2312 XA DR 2301 P2.0 Proposed Street View in ContextPlans18 Dec 2023View
2312 XA DR 2200 P3.0 Existing and Proposed SectionsSuperseded Plans18 Dec 2023View
2312 XA DR 2100 P3.0 Existing and Proposed Front Elevation NESuperseded Plans18 Dec 2023View
2312 XA DR 2008 P1.0 Proposed Indicative Drainage Plan DetailSuperseded Plans18 Dec 2023View
2312 XA DR 2007 P1.0 Proposed PV Assembly PlanSuperseded Plans18 Dec 2023View
2312 XA DR 2006 P3.0 Proposed Level 7 GA PlanFloor Plans18 Dec 2023View
2312 XA DR 0204 P2.0 Existing Level 7 GA PlanFloor Plans18 Dec 2023View
2312 XA DR 2000 P3.0 Proposed Site PlanSite Layout Plan18 Dec 2023View
2312 XA DR 0200 P2.0 Existing Site PlanSite Layout Plan18 Dec 2023View
2312 XA DR 0001 P2.0 Location PlanSite Location Plan18 Dec 2023View
Design and Access Statement - 2312_GCCP PV ARRAYDesign and Access Statement18 Dec 2023View
ApplicationFormRedactedApplication Form18 Dec 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Grant
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.