ApprovedCouncil status: Decided

Non-Material Amendmend of Planning Application DC/23/00141/FUL to allow the back of house to be reduced in size to accomodate rear fire escape, the addition of an external canopy area outside rear escape door, bike lockers to be re-located against the building, tweaks to internal layout and shopfront, including the addition of an ATM, additional bollards to the rear of house, fascia board lifting, flat roof at rear of store changed from parapet to fascia board and gutter.

Crawcrook DIY And Trade 12 Main Street Ryton NE40 4ND

Gateshead Metropolitan Borough CouncilReference DC/23/00880/NMANon Material Amendment

Last published check: 8 Nov 2026, 14:12. Check the council record for more recent changes.

Status and dates

Last published check: 8 Nov 2026, 14:12 (UK)

  1. DoneReceived10 Oct 2023
  2. DoneValidated12 Oct 2023
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date9 Nov 2023
  5. DecidedGrant9 Nov 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Non Material Amendment
Ward
Crawcrook And Greenside
Documents
17 published

Proposal

Non-Material Amendmend of Planning Application DC/23/00141/FUL to allow the back of house to be reduced in size to accomodate rear fire escape, the addition of an external canopy area outside rear escape door, bike lockers to be re-located against the building, tweaks to internal layout and shopfront, including the addition of an ATM, additional bollards to the rear of house, fascia board lifting, flat roof at rear of store changed from parapet to fascia board and gutter.

Reference
DC/23/00880/NMA
Ward
Crawcrook And Greenside
Agent
DPP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • 23 00880Officers Report9 Nov 2023View
  • Approved Certificate NMAApproved Certificate NMA9 Nov 2023View
  • NMA Existing Plans - Site Layout Plan (21053-GDL-A1-00-DR-A-2017-S1-P15)NMA Existing Plans12 Oct 2023View
  • NMA Existing Plans - Sections (21053-GDL-A1-00-DR-A-2009-S1-P08)NMA Existing Plans12 Oct 2023View
  • NMA Existing Plans - Roof Plan (21053-GDL-A1-00-DR-A-2007-S1-P07)NMA Existing Plans12 Oct 2023View
  • NMA Existing Plans - Proposed Level Strategy (21053-GDL-A1-00-DR-A-2015-S1-P08)NMA Existing Plans12 Oct 2023View
  • NMA Existing Plans - Floor Plan (21053-GDL-A1-00-DR-A-2006-S1-P15)NMA Existing Plans12 Oct 2023View
  • NMA Existing Plans - External Site Works & Boundary Plan (21053-GDL-A1-00-DR-A-2012-S1-P23)NMA Existing Plans12 Oct 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Grant
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.