ApprovedCouncil status: Decided

Increase in width of existing path from 1.25m to 3.2m to match width of arch detail to front of house, creation of narrow brick on edge and stone path along the front of the house, erection of wrought iron trellis to the wall that infills the arch and create wrought iron window boxes to match in style to fit below the two ground floor windows, installation of electric vehicle charging point in concealed space in trellis and erection of 600mm high wrought iron railing type fencing to front boundary of property curving in to widened path. (Amended plans received: 11th January 2024)

Park Cottage School Lane Newcastle Upon Tyne NE16 4SL

Gateshead Metropolitan Borough CouncilReference DC/23/00735/HHAHouseholder Application

Last published check: 8 Nov 2026, 20:51. Check the council record for more recent changes.

Status and dates

Last published check: 8 Nov 2026, 20:51 (UK)

  1. DoneReceived17 Aug 2023
  2. DoneValidated18 Aug 2023
  3. ClosedConsultationEnded 2 Feb 2024
  4. Date set by councilTarget decision date16 Feb 2024
  5. DecidedGrant15 Feb 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Householder Application
Ward
Dunston Hill And Whickham East
Documents
16 published

Proposal

Increase in width of existing path from 1.25m to 3.2m to match width of arch detail to front of house, creation of narrow brick on edge and stone path along the front of the house, erection of wrought iron trellis to the wall that infills the arch and create wrought iron window boxes to match in style to fit below the two ground floor windows, installation of electric vehicle charging point in concealed space in trellis and erection of 600mm high wrought iron railing type fencing to front boundary of property curving in to widened path. (Amended plans received: 11th January 2024)

Reference
DC/23/00735/HHA
Ward
Dunston Hill And Whickham East

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • 735 officer reportOfficers Report15 Feb 2024View
  • Approval CertificateApproval Certificate15 Feb 2024View
  • amended plansAmended Plans12 Jan 2024View
  • Amended Swept Path analysisAmended Plans12 Jan 2024View
  • Superseded swept path analysisPlans22 Sept 2023View
  • Supporting Document - Design Concept ArtSupporting documents17 Aug 2023View
  • superseded Plans - Trellis and Window BoxPlans17 Aug 2023View
  • superseded Site Layout Plan - ProposedSite Layout Plan17 Aug 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Grant
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.