ApprovedCouncil status: Decided

Internal and External refurbishment of property including replacement roof with mix of salvaged and new matching slate, 1 sukkah to rear flat roof, installation of ensuite to main bedroom and associated new rear window, formation of new first floor utility with installation of stud wall and 1 no. roof light, new internal window with existing closet, widening of existing doorway to proposed kitchen, installation of ground floor WC, garden and front boundaries renovated and structural repairs to gable (amended description and plans 25.8.23)

2 Barrington Place Gateshead NE8 1XA

Gateshead Metropolitan Borough CouncilReference DC/23/00536/LBCListed Building Consent

Last published check: 8 Nov 2026, 23:25. Check the council record for more recent changes.

Status and dates

Last published check: 8 Nov 2026, 23:25 (UK)

  1. DoneReceived23 Jun 2023
  2. DoneValidated23 Jun 2023
  3. ClosedConsultationEnded 15 Sept 2023
  4. Date set by councilTarget decision date29 Sept 2023
  5. DecidedGrant28 Sept 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
Lobley Hill And Bensham
Documents
14 published

Proposal

Internal and External refurbishment of property including replacement roof with mix of salvaged and new matching slate, 1 sukkah to rear flat roof, installation of ensuite to main bedroom and associated new rear window, formation of new first floor utility with installation of stud wall and 1 no. roof light, new internal window with existing closet, widening of existing doorway to proposed kitchen, installation of ground floor WC, garden and front boundaries renovated and structural repairs to gable (amended description and plans 25.8.23)

Reference
DC/23/00536/LBC
Ward
Lobley Hill And Bensham

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Approved Certificate LBCApproved Certificate LBC28 Sept 2023View
  • Officer's ReportOfficers Report28 Sept 2023View
  • roofing method statementSupporting documents25 Aug 2023View
  • damp reportSupporting documents25 Aug 2023View
  • Existing floor plansAmended Plans25 Aug 2023View
  • Proposed floor plansAmended Plans25 Aug 2023View
  • Existing and Proposed Elevations and SectionsAmended Plans - Elevations25 Aug 2023View
  • 2 Bar Terrace site and location planSite Layout Plan29 Jun 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Grant
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.