Erection of substation that will contain heat plate exchangers as part of the District Energy Scheme (DC/21/00057/FUL), district heating network, to serve as an above ground connection point for district heating pipes, LV and Fibre optic pipes/cables. The substation will then be a connection point for the Freight Depot housing development (Phase 2 risk assessment received 25.05.2023, noise and odour assessment received 02.08.2023, noise mitigation details received 24.08.2023).
Land To The South Of Evans Halshaw Vauxhall Dealership St James Road Gateshead NE8 3RG
Erection of substation that will contain heat plate exchangers as part of the District Energy Scheme (DC/21/00057/FUL), district heating network, to serve as an above ground connection point for district heating pipes, LV and Fibre optic pipes/cables. The substation will then be a connection point for the Freight Depot housing development (Phase 2 risk assessment received 25.05.2023, noise and odour assessment received 02.08.2023, noise mitigation details received 24.08.2023).
Reference
DC/22/01250/FUL
Ward
Bridges
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.