LISTED BUILDING CONSENT: Repair and painting works to bridge, including grit blasting of metal work, repair and replacement of steel work and cast iron as required, resurfacing of footway and carriageway, new drainage pipework, channels and gullies, concrete and masonry repairs to abutment towers and roofs, replacement windows and doors to abutment towers, refurbishment and replacement of lifts, upgrading of internal and external lighting, architectural and flood lighting, removal of redundant apparatus, replacement and additional anti-bird netting and upgrading of anti-climb measures to main arch.
The Tyne Bridge High Street Gateshead Gateshead NE8 2FD
LISTED BUILDING CONSENT: Repair and painting works to bridge, including grit blasting of metal work, repair and replacement of steel work and cast iron as required, resurfacing of footway and carriageway, new drainage pipework, channels and gullies, concrete and masonry repairs to abutment towers and roofs, replacement windows and doors to abutment towers, refurbishment and replacement of lifts, upgrading of internal and external lighting, architectural and flood lighting, removal of redundant apparatus, replacement and additional anti-bird netting and upgrading of anti-climb measures to main arch.
Reference
DC/22/00203/LBC
Ward
Bridges
Agent
Technical Services, Newcastle City Council
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.