Council planning record

Variation of conditions 1 (approved plans); 43 (hotel materials); 44 (artwork opportunities); 48 (external lighting); 52 (wind mitigation); 56 (off site biodiversity); 65 (noise mitigation); and 67 (waiting restrictions) of planning permission DC/20/00323/FUL for erection of indoor events arena (use class D2), conference and exhibition centre including meeting rooms and associated facilities (use classes D1 and D2), dual branded hotel with roof top bar (use class C1), provision of retail and leisure floorspace (use classes A1, A3 and A4) and outside performance square with landscaping, public realm and infrastructure works as well as associated engineering operations, security measures and signalised crossing (additional information and amended plans received 15/09/20 and amended 12/10/20).

Site Bounded By Mill Road, Hawks Road And South Shore Road Gateshead

DecidedReference: DC/21/01436/FULGateshead Metropolitan Borough Council

Last published check: 3 Oct 2026, 13:34. Check the council record for more recent changes.

Application location

Site Bounded By Mill Road, Hawks Road And South Shore Road Gateshead

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Application
Received
13 Dec 2021
Validated
15 Dec 2021
Determination deadline
23 Feb 2022
Local authority
Gateshead Metropolitan Borough Council

Application overview

Variation of conditions 1 (approved plans); 43 (hotel materials); 44 (artwork opportunities); 48 (external lighting); 52 (wind mitigation); 56 (off site biodiversity); 65 (noise mitigation); and 67 (waiting restrictions) of planning permission DC/20/00323/FUL for erection of indoor events arena (use class D2), conference and exhibition centre including meeting rooms and associated facilities (use classes D1 and D2), dual branded hotel with roof top bar (use class C1), provision of retail and leisure floorspace (use classes A1, A3 and A4) and outside performance square with landscaping, public realm and infrastructure works as well as associated engineering operations, security measures and signalised crossing (additional information and amended plans received 15/09/20 and amended 12/10/20).

Proposal details

Reference
DC/21/01436/FUL
Ward
Bridges
Agent
Mr Alex Kennedy

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 232 of 232

DocumentPublishedAction
UPDATE REPORT NO 5Officers Report18 Mar 2022View
REPORT NO 5Officers Report18 Mar 2022View
Approval Certificate FULApproval Certificate FUL18 Mar 2022View
Environmental Statement - appendicesEnvironmental Statement - appendices4 Jan 2022View
Environmental Statement - appendicesEnvironmental Statement - appendices4 Jan 2022View
Environmental Statement - appendicesEnvironmental Statement - appendices4 Jan 2022View
Environmental Statement - appendicesEnvironmental Statement - appendices4 Jan 2022View
Environmental Statement - appendicesEnvironmental Statement - appendices4 Jan 2022View
Environmental Statement - appendicesEnvironmental Statement - appendices4 Jan 2022View
Environmental Statement - appendicesEnvironmental Statement - appendices22 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices22 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices22 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices21 Dec 2021View
SES Volume 1 2021Environmental Statement21 Dec 2021View
DA10_Part_24Design and Access Statement21 Dec 2021View
DA10_Part_23Design and Access Statement21 Dec 2021View
DA10_Part_22Design and Access Statement21 Dec 2021View
DA10_Part_21Design and Access Statement21 Dec 2021View
DA10_Part_20Design and Access Statement21 Dec 2021View
DA10_Part_19Design and Access Statement21 Dec 2021View
DA10_Part_18Design and Access Statement21 Dec 2021View
DA10_Part_17Design and Access Statement21 Dec 2021View
DA10_Part_16Design and Access Statement21 Dec 2021View
DA10_Part_15Design and Access Statement21 Dec 2021View
DA10_Part_14Design and Access Statement21 Dec 2021View
DA10_Part_13Design and Access Statement21 Dec 2021View
DA10_Part_12Design and Access Statement21 Dec 2021View
DA10_Part_11Design and Access Statement21 Dec 2021View
DA10_Part_10Design and Access Statement21 Dec 2021View
DA10_Part_9Design and Access Statement21 Dec 2021View
DA10_Part_8Design and Access Statement21 Dec 2021View
DA10_Part_7Design and Access Statement21 Dec 2021View
DA10_Part_6Design and Access Statement21 Dec 2021View
DA10_Part_5Design and Access Statement21 Dec 2021View
DA10_Part_4Design and Access Statement21 Dec 2021View
DA10_Part_3Design and Access Statement21 Dec 2021View
DA10_Part_2Design and Access Statement21 Dec 2021View
DA10_Part_1Design and Access Statement21 Dec 2021View
DA7_Part_24Design and Access Statement21 Dec 2021View
DA7_Part_23Design and Access Statement21 Dec 2021View
DA7_Part_22Design and Access Statement21 Dec 2021View
DA7_Part_21Design and Access Statement21 Dec 2021View
DA7_Part_20Design and Access Statement21 Dec 2021View
DA7_Part_19Design and Access Statement21 Dec 2021View
DA7_Part_18Design and Access Statement21 Dec 2021View
DA7_Part_17Design and Access Statement21 Dec 2021View
DA7_Part_16Design and Access Statement21 Dec 2021View
DA7_Part_15Design and Access Statement21 Dec 2021View
DA7_Part_14Design and Access Statement21 Dec 2021View
DA7_Part_13Design and Access Statement21 Dec 2021View
DA7_Part_12Design and Access Statement21 Dec 2021View
DA7_Part_11Design and Access Statement21 Dec 2021View
DA7_Part_10Design and Access Statement21 Dec 2021View
DA7_Part_9Design and Access Statement21 Dec 2021View
DA7_Part_8Design and Access Statement21 Dec 2021View
DA7_Part_7Design and Access Statement21 Dec 2021View
DA7_Part_6Design and Access Statement21 Dec 2021View
DA7_Part_5Design and Access Statement21 Dec 2021View
DA7_Part_4Design and Access Statement21 Dec 2021View
DA7_Part_3Design and Access Statement21 Dec 2021View
DA7_Part_2Design and Access Statement21 Dec 2021View
DA7_Part_1Design and Access Statement21 Dec 2021View
Design And Access StatementDesign And Access Statement21 Dec 2021View
Design And Access StatementDesign And Access Statement21 Dec 2021View
Design And Access StatementDesign And Access Statement21 Dec 2021View
Design And Access StatementDesign And Access Statement21 Dec 2021View
Design And Access StatementDesign And Access Statement21 Dec 2021View
Design And Access StatementDesign And Access Statement21 Dec 2021View
Design And Access StatementDesign And Access Statement21 Dec 2021View
Design And Access StatementDesign And Access Statement21 Dec 2021View
GQ ES (April 2020) - Vol 1 - ContentsEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter T - Summary of Mitigation and MonitoringEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter S - Cumulative AssessmentEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter R - Waste and RecyclingEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter Q - Health and WellbeingEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter P - Climate Change and ResilienceEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter O - Daylight and SunlightEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter N - Wind EnvironmentEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter M - Ecology and Nature ConservationEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter L - Ground Conditions and ContaminationEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter K - Water ResourcesEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter J - ArchaeologyEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter I - Built HeritageEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter H - Socio-EconomicsEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter G - Noise and VibrationEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter F - Air QualityEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter E - TransportEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter D - TVIAEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter C - SIte and Development DescriptionEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter B - Scope, Methodology and ConsultationEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 1 - Chapter A - Introduction and BackgroundEnvironmental Statement17 Dec 2021View
GQ ES (April 2020) - Vol 3 - Non-Technical SummaryNon Technical Summary17 Dec 2021View
Environmental Statement - appendicesEnvironmental Statement - appendices17 Dec 2021View
GQ ES Addendum (Sept 2020) - Vol 1 - Main AssessmentsEnvironmental Statement17 Dec 2021View
GQ ES Addendum (Sept 2020) - Vol 3 - Non-Technical SummaryNon Technical Summary17 Dec 2021View
23466 GQ Supplementary ES Volume 1 - Technical AssessmentsEnvironmental Statement17 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9200_MASTERPLAN GA PACKAGE COVERFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ57-DR-A-9216_GA PLAN - LVL. ZZ57 - HOTEL CORE ROOFRoof Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ55-DR-A-9215_GA PLAN - LVL. ZZ55 - ARENA ROOFRoof Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ50-DR-A-9214_GA PLAN - LVL. ZZ50 - HOTEL ROOFRoof Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ47-DR-A-9213_GA PLAN - LVL. ZZ47 - HOTELFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ46-DR-A-9212_GA PLAN - LVL. ZZ46 - ARENA PLANTFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ43-DR-A-9211_GA PLAN - LVL. ZZ43 - HOTELFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ40-DR-A-9210_GA PLAN - LVL. ZZ40 - HOTELFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ37-DR-A-9209_GA PLAN - LVL. ZZ37 - HOTELFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ35-DR-A-9208_GA PLAN - LVL. ZZ35 - ARENA MAIN CONCOURSEFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ30-DR-A-9207_GA PLAN - LVL. ZZ30 - HOTELFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ26-DR-A-9206_GA PLAN - LVL. ZZ26 - ARENA ENTRANCE & VIPFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ22-DR-A-9205_GA PLAN - LVL. ZZ22 - ARENA EVENT FLOORFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ18-DR-A-9204_GA PLAN - LVL. ZZ18 - CO-EX CONCOURSE HOTEL ENTRANCEFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ15-DR-A-9203_GA PLAN - LVL. ZZ15 - CO-EX SERVICE CORRIDORFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ13-DR-A-9202_GA PLAN - LVL. ZZ13 - CONFERENCE ROOMSFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZ08-DR-A-9201_GA PLAN - LVL. ZZ08 - CO-EX ENTRANCEFloor Plans15 Dec 2021View
GQ-HOK-AR-ZZZZ-DR-A-9300_ARENA GA PACKAGE COVERFloor Plans15 Dec 2021View
GQ-HOK-AR-ARUR-DR-A-9308_GA PLAN - LVL. ARUR - BOWL ROOFRoof Plans15 Dec 2021View
GQ-HOK-AR-ARRF-DR-A-9307_GA PLAN - LVL. ARRF - ROOF PLANTRoof Plans15 Dec 2021View
GQ-HOK-AR-CX03-DR-A-9301_GA PLAN - LVL. CX03 - BACK OF HOUSE & ADMIN B. ENTRANCEFloor Plans15 Dec 2021View
GQ-HOK-AR-AR07-DR-A-9306_GA PLAN - LVL. AR04 - MEP PLANTFloor Plans15 Dec 2021View
GQ-HOK-AR-AR06-DR-A-9305_GA PLAN - LVL. AR03 - MAIN CONCOURSEFloor Plans15 Dec 2021View
GQ-HOK-AR-AR02-DR-A-9304_GA PLAN - LVL. AR02 - SERVICES MEZZANINEFloor Plans15 Dec 2021View
GQ-HOK-AR-AR01-DR-A-9303_GA PLAN - LVL. AR01 - ENTRANCE & VIPFloor Plans15 Dec 2021View
GQ-HOK-AR-AR00-DR-A-9302_GA PLAN - LVL. AR00 - EVENT FLOORFloor Plans15 Dec 2021View
GQ-HOK-CX-ZZZZ-DR-A-9400_CO-EX - EXHIBITION HALLS GA PACKAGE COVERFloor Plans15 Dec 2021View
GQ-HOK-CX-CXRF-DR-A-9407_GA PLAN - LVL. CXRF - CO-EX HALLS ROOFRoof Plans15 Dec 2021View
GQ-HOK-CX-CX05-DR-A-9406_GA PLAN - LVL. CX05 - PLENARY AND PLANT DECKFloor Plans15 Dec 2021View
GQ-HOK-CX-CX04-DR-A-9405_GA PLAN - LVL. CX04 - GALLERIA AND PLANT DECKFloor Plans15 Dec 2021View
GQ-HOK-CX-CX03-DR-A-9404_GA PLAN - LVL. CX03 - EXHIBITION HALLS CONCOURSEFloor Plans15 Dec 2021View
GQ-HOK-CX-CX02-DR-A-9403_GA PLAN - LVL. CX02 - SERVICE CORRIDORFloor Plans15 Dec 2021View
GQ-HOK-CX-CX01-DR-A-9402_GA PLAN - LVL. CX01 - CONVENTION CENTER MEDIUM ROOMSFloor Plans15 Dec 2021View
GQ-HOK-CX-CX00-DR-A-9401_GA PLAN - LVL. CX00 - ENTRANCE, BOX OFFICE AND RETAILFloor Plans15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9505_ELEVATION - ARENA 02Elevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9504_ELEVATION - ARENA 01Elevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9503_ELEVATION - CO-EX BOH AND ADMIN BUILDINGElevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9502_ELEVATION - EXIBITION HALLS AND CONVENTION CENTERElevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9501_CONTEXTUAL ELEVATIONSElevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9500_ELEVATIONS PACKAGE COVERElevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9505Elevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9504Elevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9503Elevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9502Elevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9604_SECTION 03 - ARENASections15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9603_SECTION 02 - MULTIPURPOSE HALLSSections15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9602_SECTION 01 - CONFERENCE HALLS AND GALLERIASections15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9601_CONTEXTUAL SECTIONSSections15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9600_SECTIONS PACKAGE COVERSections15 Dec 2021View
Cam5_04_200922_CopyrightHOKSupporting documents15 Dec 2021View
Cam4_NIGHT_05_200922_CopyrightHOKSupporting documents15 Dec 2021View
Cam4_DAY_10_200922_CopyrightHOKSupporting documents15 Dec 2021View
Cam3_09B_200922_CopyrightHOKSupporting documents15 Dec 2021View
Cam2_05_200922_CopyrightHOKSupporting documents15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9905_EXTERNAL CGI 5Supporting documents15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9904_EXTERNAL CGI 4Supporting documents15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9903_EXTERNAL CGI 3Supporting documents15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9902_EXTERNAL CGI 2Supporting documents15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9901_EXTERNAL CGI 1Supporting documents15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9900_CGIs COVERSupporting documents15 Dec 2021View
23466.05 Newcastle Gateshead Quays Statement of Community Involvement 08.12.21Supporting documents15 Dec 2021View
23466.05 Newcastle Gateshead Quays Planning Statement 07.12.21Planning Statement15 Dec 2021View
23466.05 Newcastle Gateshead Quays Hotel Compliance Statement 06.12.21Supporting documents15 Dec 2021View
SES Volume 3 2021Non Technical Summary15 Dec 2021View
SES Volume 2 2021Environmental Statement - appendices15 Dec 2021View
Gateshead Quayside (HMS Calliope) Report v1.1Supporting documents15 Dec 2021View
200817 Coal Drops Visual Structural Survey Rev 01_RedactedSupporting documents15 Dec 2021View
GQ-AHR-HT-HT12-DR-A-07212Floor Plans15 Dec 2021View
GQ-AHR-HT-HT10-DR-A-07210Floor Plans15 Dec 2021View
GQ-AHR-HT-HT11-DR-A-07211Floor Plans15 Dec 2021View
GQ-AHR-HT-HT09-DR-A-07209Floor Plans15 Dec 2021View
GQ-AHR-HT-HT07-DR-A-07207Floor Plans15 Dec 2021View
GQ-AHR-HT-HT08-DR-A-07208Floor Plans15 Dec 2021View
GQ-AHR-HT-HT06-DR-A-07206Floor Plans15 Dec 2021View
GQ-AHR-HT-HT05-DR-A-07205Floor Plans15 Dec 2021View
GQ-AHR-HT-HT04-DR-A-07204Floor Plans15 Dec 2021View
GQ-AHR-HT-HT03-DR-A-07203Floor Plans15 Dec 2021View
GQ-AHR-HT-HT02-DR-A-07202Floor Plans15 Dec 2021View
GQ-AHR-HT-HT01-DR-A-07201Floor Plans15 Dec 2021View
GQ-AHR-HT-HT00-DR-A-07200Floor Plans15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07353Sections15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07352Sections15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07351Sections15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07403Elevations15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07402Elevations15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07401Elevations15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07400Elevations15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07413Elevations15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07412Elevations15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07411Elevations15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07410Elevations15 Dec 2021View
GQ-AHR-HT-ZZZZ-DR-A-07450Plans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1201-Hardworks - Site WidePlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1101-External Works General ArrangementPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1002-Site Wide Security StrategyPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1001-Site BoundariesPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1302-Planting TypologiesLandscape Details15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1301-Softworks - Site WideLandscape Details15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2505-Wind Mitigation Elements Sheet 2 of 2Plans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2504-Wind Mitigation Elements Sheet 1 of 2Plans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2503-HVM Bund Indicative DetailPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2501-Podium Walk & Service Yard Detail AreaPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2401-Hotel Public Realm Detail AreaPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2301-Baltic Square & South Shore Road Detail AreaPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2201-Coal Drops Detail AreaPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2101-Performance Square Detail AreaPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1503-Wind Mitigation StrategyPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1501-Site Wide Furniture StrategyPlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-1401-Levels - Site WidePlans15 Dec 2021View
GQ-PIE-PB-ZZZZ-DR-L-2506-Indicative Brown Roof LayoutRoof Plans15 Dec 2021View
GQ-PIE-PB-ZZZZ-RP-L-97-S3-02-1408 Public Realm Design and Access StatementSupporting documents15 Dec 2021View
GQ-PIE-PB-ZZZZ-RP-L-97-S3-02-1407-Artwork OpportunitiesSupporting documents15 Dec 2021View
NGQ - Drainage Methodology DocumentDrainage Information15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9103_EXISTING SITE ELEVATIONSElevations15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9104_PROPOSED SITE PLANSite Layout Plan15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9102_EXISTING SITE PLANSite Layout Plan15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9100_SITE PLANS PACKAGE COVERSite Layout Plan15 Dec 2021View
GQ-HOK-ZZ-ZZZZ-DR-A-9101_SITE LOCATION PLANSite Location Plan15 Dec 2021View
ApplicationFormRedactedApplication Form15 Dec 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  2. Application Received Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Actual Committee Date

    Published milestoneCouncil source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.