Council planning record

APPLICATION TO DISCHARGE CONDITIONS 3 (CONSTRUCTION METHOD STATEMENT), 6 (FOUL & SURFACE WATER DRAINAGE SCHEME), 7 (FINISHED LEVELS), 8 (MATERIALS) AND 11 (BIODIVERSITY ENHANCEMENT MEASURES) OF PLANNING PERMISSION 26/0146

LAND SOUTHWEST OF WEETON ROAD (OPPOSITE THE MILLERS ARMS) WEETON ROAD SINGLETON LANCASHIRE FY6 8LL

PendingReference: 26/0281Fylde Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Pending
Application type
Discharge of Conditions
Received
29 Apr 2026
Validated
1 Jul 2026
Determination deadline
Not published
Local authority
Fylde Borough Council

Application overview

APPLICATION TO DISCHARGE CONDITIONS 3 (CONSTRUCTION METHOD STATEMENT), 6 (FOUL & SURFACE WATER DRAINAGE SCHEME), 7 (FINISHED LEVELS), 8 (MATERIALS) AND 11 (BIODIVERSITY ENHANCEMENT MEASURES) OF PLANNING PERMISSION 26/0146

Proposal details

Reference
26/0281
Ward
Rural North Fylde
Parish
Singleton
Agent
MR NEIL MCMANUS, Northern Trust Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND SOUTHWEST OF WEETON ROAD (OPPOSITE THE MILLERS ARMS) WEETON ROAD SINGLETON LANCASHIRE FY6 8LL

This record has no verified map location.

Documents 27 of 27

DocumentPublishedAction
United UtilitiesConsultee Comment11 Sept 2026View
Condition 8 - Revised House MaterialsAmended Plan2 Sept 2026View
Revised Drainage LayoutAmended Plan18 Aug 2026View
United UtilitiesConsultee Comment10 Aug 2026View
GMEUConsultee Comment10 Aug 2026View
Revised Drainage LayoutSuperseded6 Aug 2026View
Archaeology ResponseConsultee Comment6 Aug 2026View
Technical ServicesConsultee Comment21 Jul 2026View
EP MomorandumCorrespondence20 Jul 2026View
LCC HighwaysConsultee Comment17 Jul 2026View
Condition 8 - External materials for dwellingsSuperseded1 Jul 2026View
Condition 6 & 7 - Drainage Layout with LevelsSuperseded26 Jun 2026View
Condition 6 - Drainage Strategy ReportBackground Documents26 Jun 2026View
Condition 6 - Hydraulic Analysis & Drainage CalculationsBackground Documents26 Jun 2026View
Condition 6 - Drainage Management PlanBackground Documents26 Jun 2026View
Condition 6 - Hydrobrake Design DrawingBackground Documents26 Jun 2026View
Condition 6 - Hydrobrake Hydraulic CharacteristicsBackground Documents26 Jun 2026View
Condition 6 - Explanation of drainage strategyBackground Documents26 Jun 2026View
Application form_redactedApplication Form No Personal Data25 Jun 2026View
Condition 3 - Construction Management StatementBackground Documents25 Jun 2026View
Condition 3 - Swept Path Layout For Tipper Truck ExcavatorBackground Documents25 Jun 2026View
Condition 8 - External finishes for hard landscaped areasBackground Documents25 Jun 2026View
Condition 11 - Biodiversity Enhancement MeasuresBackground Documents25 Jun 2026View
Condition 4 - Archaeological Desk Based AssessmentBackground Documents29 Apr 2026View
Condition 6 - Drainage DetailsBackground Documents29 Apr 2026View
Condition 3 - CEMP PlanInitial Drawing29 Apr 2026View
Condition 8 - Hard landscaping materialsInitial Drawing29 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.