Council planning record

FULL PLANNING APPLICATION FOR PROVISION OF SUPPORTING HIGHWAY INFRASTRUCTURE AND LANDSCAPING ASSOCIATED WITH MODIFICATIONS TO THE INTERIM QUEENSWAY JUNCTION (CONJOINED WITH DEVELOPMENT PROPOSED BY APPLICATION 26/0126)

LAND SOUTH OF QUEENSWAY LYTHAM ST ANNES LANCASHIRE FY8 3FY

PendingReference: 26/0136Fylde Borough Council

Last published check: 13 Oct 2026, 14:14. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Pending
Application type
Full Planning Permission
Received
3 Mar 2026
Validated
11 Mar 2026
Determination deadline
Not published
Local authority
Fylde Borough Council

Application overview

FULL PLANNING APPLICATION FOR PROVISION OF SUPPORTING HIGHWAY INFRASTRUCTURE AND LANDSCAPING ASSOCIATED WITH MODIFICATIONS TO THE INTERIM QUEENSWAY JUNCTION (CONJOINED WITH DEVELOPMENT PROPOSED BY APPLICATION 26/0126)

Proposal details

Reference
26/0136
Ward
Kilnhouse New
Parish
St Anne's on the Sea
Agent
MR ALEXIS DE POL, De Pol Associates

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND SOUTH OF QUEENSWAY LYTHAM ST ANNES LANCASHIRE FY8 3FY

This record has no verified map location.

Documents 27 of 27

DocumentPublishedAction
LCC HighwaysConsultee Comment11 Sept 2026View
LLFAConsultee Comment2 Apr 2026View
Natural EnglandConsultee Comment26 Mar 2026View
st annes parish councilConsultee Comment25 Mar 2026View
GMEUConsultee Comment16 Mar 2026View
Biodiversity Net Gain MetricBiodiversity Net Gain Metric12 Mar 2026View
Exceedance Storm Flood RoutesInitial Drawing3 Mar 2026View
Typical Drainage DetailsInitial Drawing3 Mar 2026View
Contributing Area PlanInitial Drawing3 Mar 2026View
Control Manhole DetailsInitial Drawing3 Mar 2026View
Drainage Long SectionsInitial Drawing3 Mar 2026View
Drainage LayoutInitial Drawing3 Mar 2026View
Application form redactedApplication Form3 Mar 2026View
Ecology Technical Note (including HRA & BNG)Background Documents3 Mar 2026View
Operation And Maintenance Plan for Surface Water Drainage SystemBackground Documents3 Mar 2026View
Suds Maintenance Inspection ChecklistBackground Documents3 Mar 2026View
Flood Risk & Drainage Assessment Rev A 1 Of 2Background Documents3 Mar 2026View
Flood Risk & Drainage Assessment Rev A 2 Of 2Background Documents3 Mar 2026View
Planning StatementBackground Documents3 Mar 2026View
Transport Technical NoteBackground Documents3 Mar 2026View
S38 General ArrangementInitial Drawing3 Mar 2026View
S278 General ArrangementInitial Drawing3 Mar 2026View
Landscape Proposals & definition of application boundariesInitial Drawing3 Mar 2026View
S278 Drainage LayoutInitial Drawing3 Mar 2026View
S278 Toucan Crossing General ArrangementInitial Drawing3 Mar 2026View
S278 Toucan Crossing Signing And LiningInitial Drawing3 Mar 2026View
Location PlanLocation Plan3 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.