Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
THE CHADWICK HOTEL 109-115 SOUTH PROMENADE LYTHAM ST ANNES LANCASHIRE FY8 1NP
THE CHADWICK HOTEL 109-115 SOUTH PROMENADE LYTHAM ST ANNES LANCASHIRE FY8 1NP
This record has no verified map location.
APPLICATION TO VARY CONDITIONS 2 (APPROVED PLANS), 3 (MATERIALS), 6 (FINISHED LEVELS), 10 (WHEELCHAIR ADAPTABLE DWELLINGS), 11 (SOFT LANDSCAPING SCHEME), 16 (DESIGN AND CONSTRUCTION OF VEHICLE ACCESS), 17 (HARD LANDSCAPING), 19 (CYCLE PARKING) AND 20 (BIN STORE) OF PLANNING PERMISSION 21/0712 RELATING TO "ERECTION OF SPLIT LEVEL 3-5 STOREY BLOCK OF 29 APARTMENTS WITH ASSOCIATED CAR PARKING, LANDSCAPING AND COMMUNAL FACILITIES INCLUDING FORMATION OF NEW ACCESSES OFF LIGHTBURNE AVENUE" FOR MODIFICATIONS INVOLVING: 1) RECONFIGURATION OF CAR PARKING AREAS AND ASSOCIATED ALTERATIONS TO HARD AND SOFT LANDSCAPING; 2) ALTERATIONS TO SIZE, DESIGN AND LAYOUT OF BIN AND CYCLE STORE TO REAR OF BUILDING; 3) MODIFICATIONS TO REAR COURTYARD FACING ELEVATIONS AND INTRODUCTION OF VERTICAL MANSARD ROOF TO REAR ELEVATIONS; 4) MODIFICATIONS TO ROOF OF BUILDING INCLUDING CHANGE TO ROOF PROFILE, INCREASE IN EAVES AND RIDGE HEIGHTS, ALTERATIONS TO NUMBER AND POSITIONING OF ROOF LIGHTS AND INSTALLATION OF SOLAR PANELS; 5) MODIFICATIONS TO WINDOW ARRANGEMENTS ON ALL ELEVATIONS; 6) ALTERATIONS TO FLOOR SPACE INCLUDING REMOVAL OF BASEMENT LEVEL AND CREATION OF ADDITIONAL ACCOMMODATION IN ROOF SPACE; 7) MODIFICATIONS TO SIZE AND MIX (INCLUDING BEDROOM NUMBERS) OF DWELLINGS; 8) PROVISION OF DETAILS OF MATERIALS AND FINISHED LEVELS; AND 9) ALTERING THE TRIGGER FOR SUBMISSION OF A SCHEME FOR THE DESIGN AND CONSTRUCTION OF THE DEVELOPMENT’S VEHICULAR ACCESSES FROM LIGHTBURNE AVENUE FROM “NO ABOVE GROUND WORKS OF DEVELOPMENT” TO PRE-OCCUPATION
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Decision NoticeDecision | 16 Apr 2026 | View |
| Completed S106 RedactedSection 106 Legal Agreement | 16 Apr 2026 | View |
| Final ReportFinal Report | 16 Jan 2026 | View |
| St Annes Town CouncilConsultee Comment | 15 Jan 2026 | View |
| LCC HighwaysConsultee Comment | 7 Jan 2026 | View |
| Proposed Layout Plans Sheet 1 - Basement & Ground Floor PlansAmended Plan | 19 Dec 2025 | View |
| Proposed Layout Plans Sheet 2 - First & Second Floor PlansAmended Plan | 19 Dec 2025 | View |
| Proposed Layout Plans Sheet 3 - Third & Fourth Floor PlansAmended Plan | 19 Dec 2025 | View |
| Proposed Contextual Street ElevationsAmended Plan | 19 Dec 2025 | View |
| Proposed Accessibility StrategyAmended Plan | 19 Dec 2025 | View |
| Proposed Landscape SchemeAmended Plan | 19 Dec 2025 | View |
| Contextual Elevations With Former Hotel OverlayAmended Plan | 19 Dec 2025 | View |
| Proposed Elevations with Overlay Sheet 1 of 3Amended Plan | 19 Dec 2025 | View |
| Proposed Elevations with Overlay Sheet 2 of 3Amended Plan | 19 Dec 2025 | View |
| Proposed Elevations with Overlay Sheet 3 of 3Amended Plan | 19 Dec 2025 | View |
| Proposed Site PlanAmended Plan | 11 Dec 2025 | View |
| Proposed Elevations Sheet 1 of 3Amended Plan | 11 Dec 2025 | View |
| LLFAConsultee Comment | 20 Nov 2025 | View |
| St Annes Town CouncilConsultee Comment | 19 Nov 2025 | View |
| Blackpool AirportConsultee Comment | 17 Nov 2025 | View |
| LCC HighwaysConsultee Comment | 14 Nov 2025 | View |
| School Planning TeamConsultee Comment | 12 Nov 2025 | View |
| NATSConsultee Comment | 3 Nov 2025 | View |
| Financial Viability Review for s73 application_redactedBackground Documents | 27 Oct 2025 | View |
| application form redactedApplication Form No Personal Data | 23 Oct 2025 | View |
| Proposed Layout Plans Sheet 4 - Fourth Floor Mezzanine PlanInitial Drawing | 22 Oct 2025 | View |
| Proposed Layout Plans Sheet 1 - Basement & Ground Floor PlansSuperseded | 22 Oct 2025 | View |
| Proposed Layout Plans Sheet 3 - Third & Fourth Floor PlansSuperseded | 22 Oct 2025 | View |
| Proposed Layout Plans Sheet 2 - First & Second Floor PlansSuperseded | 22 Oct 2025 | View |
| Supporting StatementBackground Documents | 22 Oct 2025 | View |
| Proposed Roof PlanInitial Drawing | 24 Sept 2025 | View |
| Proposed Elevations Sheet 2 Of 3Initial Drawing | 24 Sept 2025 | View |
| Proposed Elevations Sheet 3 Of 3Initial Drawing | 24 Sept 2025 | View |
| Bin Store And Bike Store ElevationsInitial Drawing | 24 Sept 2025 | View |
| Proposed Site PlanSuperseded | 24 Sept 2025 | View |
| Proposed Elevations Sheet 1 Of 3Superseded | 24 Sept 2025 | View |
| Proposed Contextual Street ElevationsSuperseded | 24 Sept 2025 | View |
| Proposed Landscape SchemeSuperseded | 24 Sept 2025 | View |
| Proposed Accessibility StrategySuperseded | 24 Sept 2025 | View |
| Access General Arrangement PlanSuperseded | 24 Sept 2025 | View |
| Access Materials and Kerbing PlanSuperseded | 24 Sept 2025 | View |
| Swept Path AnalysisSuperseded | 24 Sept 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.