Council planning record

ALTERATION OF THE DWELLING: 1) DEMOLITION OF SINGLE STOREY PORCH TO REAR, 2) FORMATION OF DOOR WITHIN EXISTING WINDOW OPENING TO SIDE ELEVATION, 3) PATIO DOOR INSERTION TO REAR ELEVATION, 3) RENDER TRIM AND PAINTED BRICK WORK SURROUNDING REAR GROUND FLOOR PATIO DOORS AND WINDOW, 4) BRICKING UP OF A 1ST FLOOR WINDOW TO REAR ELEVATION, 5) RAISED DECKED AREA TO REAR GARDEN, 6) REPLACEMENT OF EXISTING WINDOWS TO REAR WITH SLIDING SASH.

11 ELMS AVENUE LYTHAM ST ANNES LANCASHIRE FY8 5PW

GrantedReference: 23/0112Fylde Borough Council

Last published check: 30 Sept 2026, 07:46. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Site Notice Date

    Published milestoneCouncil source
  4. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Advert Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Application summary

Status
Granted
Application type
Householder Planning Application
Received
10 Feb 2023
Validated
15 Feb 2023
Determination deadline
Not published
Local authority
Fylde Borough Council

Application overview

ALTERATION OF THE DWELLING: 1) DEMOLITION OF SINGLE STOREY PORCH TO REAR, 2) FORMATION OF DOOR WITHIN EXISTING WINDOW OPENING TO SIDE ELEVATION, 3) PATIO DOOR INSERTION TO REAR ELEVATION, 3) RENDER TRIM AND PAINTED BRICK WORK SURROUNDING REAR GROUND FLOOR PATIO DOORS AND WINDOW, 4) BRICKING UP OF A 1ST FLOOR WINDOW TO REAR ELEVATION, 5) RAISED DECKED AREA TO REAR GARDEN, 6) REPLACEMENT OF EXISTING WINDOWS TO REAR WITH SLIDING SASH.

Proposal details

Reference
23/0112
Ward
Ansdell
Agent
MR DAN THOMPSON, d p t

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

11 ELMS AVENUE LYTHAM ST ANNES LANCASHIRE FY8 5PW

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
Decision NoticeDecision14 Apr 2023View
Final ReportFinal Report14 Apr 2023View
Proposed Floor PlansAmended Plan22 Feb 2023View
Proposed elevationsAmended Plan21 Feb 2023View
Proposed Floor PlansSuperseded21 Feb 2023View
Heritage Statement revisedBackground Documents21 Feb 2023View
Design And AccessBackground Documents14 Feb 2023View
Existing Floor PlansInitial Drawing13 Feb 2023View
Existing ElevationsInitial Drawing13 Feb 2023View
Proposed Floor PlansSuperseded13 Feb 2023View
Proposed ElevationsSuperseded13 Feb 2023View
Application form redactedApplication Form10 Feb 2023View
Location PlanLocation Plan10 Feb 2023View
Existing & Proposed Floor PlansSite Plan10 Feb 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.