Council planning record

APPLICATION TO DISCHARGE DETAILS ASSOCIATED WITH CONDITIONS OF PLANNING PERMISSION 16/0062: CONDITION 3 (LEVELS) CONDITION 4 (HARD AND SOFT LANDSCAPING) CONDITION 5 (FRA AND MITIGATION MEASURES) CONDITION 6 (SURFACE WATER DRAINAGE STRATEGY) CONDITION 7 (MANAGEMENT AND MAINTENANCE OF SUDS) CONDITION 9 (SURFACE WATER POLLUTION PREVENTION) CONDITION 10 (IN CURTILAGE WATER ATTENUATION DETAILS) CONDITION 11 (TRAFFIC MANAGEMENT PLAN) CONDITION 12 (EMERGENCY ACCESS MANAGMENET PLAN) CONDITION 13 (PHASING PROGRAMME) CONDITION 14 (TRAVEL PLAN) CONDITION 15 (SECTION 278 WORKS) CONDITION 16 (ROAD MAINTENANCE STATEMENT) CONDITION 17 (CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - DUST AND NOISE) CONDITION 18 (NOISE ASSESSMENT) CONDITION 20 (STREET LIGHTING SCHEME) CONDITION 23 (CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN) CONDITION 25 (TRESPASS FENCE TO RAILWAY) CONDITION 26 (ACOUSTIC FENCE TO RAILWAY) CONDITION 29 (RAILWAY DRAINAGE) CONDITION 30 (VEHICLE SAFETY ALONGSIDE RAILWAY) CONDITION 31 (ECOLOGICAL MITIGATION AND MANAGEMENT PLAN (EMEP)) CONDITION 34 (BOUNDARY TREATMENTS) CONDITION 36 (METHOD STATEMENT COMMON LIZARDS)

PONTINS HOLIDAY CAMP, CLIFTON DRIVE NORTH, LYTHAM ST ANNES, FY8 2SX

IssuedReference: 17/0288Fylde Borough Council

Last published check: 13 Oct 2026, 05:38. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Issued
Application type
Discharge of Conditions
Received
7 Apr 2017
Validated
11 Apr 2017
Determination deadline
Not published
Local authority
Fylde Borough Council

Application overview

APPLICATION TO DISCHARGE DETAILS ASSOCIATED WITH CONDITIONS OF PLANNING PERMISSION 16/0062: CONDITION 3 (LEVELS) CONDITION 4 (HARD AND SOFT LANDSCAPING) CONDITION 5 (FRA AND MITIGATION MEASURES) CONDITION 6 (SURFACE WATER DRAINAGE STRATEGY) CONDITION 7 (MANAGEMENT AND MAINTENANCE OF SUDS) CONDITION 9 (SURFACE WATER POLLUTION PREVENTION) CONDITION 10 (IN CURTILAGE WATER ATTENUATION DETAILS) CONDITION 11 (TRAFFIC MANAGEMENT PLAN) CONDITION 12 (EMERGENCY ACCESS MANAGMENET PLAN) CONDITION 13 (PHASING PROGRAMME) CONDITION 14 (TRAVEL PLAN) CONDITION 15 (SECTION 278 WORKS) CONDITION 16 (ROAD MAINTENANCE STATEMENT) CONDITION 17 (CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - DUST AND NOISE) CONDITION 18 (NOISE ASSESSMENT) CONDITION 20 (STREET LIGHTING SCHEME) CONDITION 23 (CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN) CONDITION 25 (TRESPASS FENCE TO RAILWAY) CONDITION 26 (ACOUSTIC FENCE TO RAILWAY) CONDITION 29 (RAILWAY DRAINAGE) CONDITION 30 (VEHICLE SAFETY ALONGSIDE RAILWAY) CONDITION 31 (ECOLOGICAL MITIGATION AND MANAGEMENT PLAN (EMEP)) CONDITION 34 (BOUNDARY TREATMENTS) CONDITION 36 (METHOD STATEMENT COMMON LIZARDS)

Proposal details

Reference
17/0288
Ward
St Leonards
Parish
St Leonards
Agent
Mrs Graham, Persimmon Homes

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

PONTINS HOLIDAY CAMP, CLIFTON DRIVE NORTH, LYTHAM ST ANNES, FY8 2SX

This record has no verified map location.

Documents 157 of 157

DocumentPublishedAction
DEEMED DISCHARGE 2Correspondence12 Jul 2021View
DEEMED DISCHARGE LETTERCorrespondence20 Jun 2021View
PLOT DRAINAGE SHEET 4Additional Information16 Dec 2020View
NETWORK RAILConsultee Comment30 Mar 2020View
ACOUSTIC FENCE TO RAILAWAYAdditional Information20 Mar 2020View
PLOT DRAINAGE SHEET 2Additional Information16 Dec 2019View
PLOT DRAINAGE SHEET 6Additional Information16 Dec 2019View
PLOT DRAINAGE SHEET 8Additional Information16 Dec 2019View
DRAINAGE SOAKAWAY 191212Additional Information16 Dec 2019View
TRANSMITTAL_13214Additional Information16 Dec 2019View
WALL WITH PEBBLE DETAILSRevised Drawing10 May 2019View
TRAVEL PLANRevised Drawing10 May 2019View
BOUNDARY TREATMENT PLANRevised Drawing10 May 2019View
BAPARevised Drawing10 May 2019View
LIGHTING PLANRevised Drawing10 May 2019View
CADENT GASConsultee Comment25 Apr 2019View
NETWORK RAILConsultee Comment26 Mar 2019View
UNITED UTILITESConsultee Comment7 Mar 2019View
NOISE ASSESSMENTSupplementary Documents/Background Papers5 Mar 2019View
ENVIRONMENTAL MANAGEMENT PLANSupplementary Documents/Background Papers5 Mar 2019View
TRAVEL PLANSupplementary Documents/Background Papers5 Mar 2019View
FRA AND MITIGATION - CONDITION 5Supplementary Documents/Background Papers5 Mar 2019View
APPENDIX A - CONDITION 5Supplementary Documents/Background Papers5 Mar 2019View
APPENDIX B - CONDITION 5Supplementary Documents/Background Papers5 Mar 2019View
APPENDIX C - CONDITION 5Supplementary Documents/Background Papers5 Mar 2019View
APPENDIX D - CONDITION 5Supplementary Documents/Background Papers5 Mar 2019View
APPENDIX E - CONDITION 5Supplementary Documents/Background Papers5 Mar 2019View
DRAINAGE LAYOUT SHEET ESupplementary Documents/Background Papers5 Mar 2019View
ENVIRONMENT AGENCYConsultee Comment15 Aug 2017View
EXISTING AND PROPOSED IMPERMEABLE AREASInitial Drawing15 Aug 2017View
SOAKAWAY PROPOSALS CATCHEMENT ANALYSIS NETWORK 1Initial Drawing15 Aug 2017View
SOAKAWAY PROPOSALS CATCHEMENT ANALYSIS NETWORK 2Initial Drawing15 Aug 2017View
SOAKAWAY PROPOSALS CATCHEMENT ANALYSIS NETWORK 3Initial Drawing15 Aug 2017View
SOAKAWAY NETWORK 4 CATCHMENTInitial Drawing15 Aug 2017View
PHASE 1 DRAINAGE LAYOUTInitial Drawing15 Aug 2017View
SOAKAWAY NETWORK 1 CALSSupplementary Documents/Background Papers15 Aug 2017View
SOAKAWAY NETWORK 2 CALSSupplementary Documents/Background Papers15 Aug 2017View
COVERING LETTERSupplementary Documents/Background Papers15 Aug 2017View
SOAKAWAY NETWORK 3 CALSSupplementary Documents/Background Papers15 Aug 2017View
SOAKAWAY NETWORK 4 CALSSupplementary Documents/Background Papers15 Aug 2017View
UNITED UTILITIESConsultee Comment7 Jun 2017View
DRAINAGE LAYOUT CInitial Drawing25 May 2017View
CEMP FINALRevised Drawing25 May 2017View
UNITED UTILITIESConsultee Comment18 May 2017View
ENV HEALTHConsultee Comment18 May 2017View
NATURAL ENGLANDConsultee Comment12 May 2017View
THE ENVIRONMENT AGENCYConsultee Comment28 Apr 2017View
1 - STANDARD ACKNOWLEDGEMENT LETTERCorrespondence25 Apr 2017View
HYDROBRAKE MANHOLE SECTIONS AND DETAILSInitial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 1Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 3Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 4Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 7Initial Drawing13 Apr 2017View
CATCHMENT ANALYSIS SHEET 1Initial Drawing13 Apr 2017View
CATCHMENT ANALYSIS SHEET 2Initial Drawing13 Apr 2017View
DRAINAGE LAYOUT SHEET 1Initial Drawing13 Apr 2017View
MANHOLE SCHEDULES STORM WATERInitial Drawing13 Apr 2017View
MANHOLE SCHEDULES FOUL WATERInitial Drawing13 Apr 2017View
HYDROBRAKE MANHOLE SECTIONS AND DETAILS SHEET 2Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 2Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 5Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 6Initial Drawing13 Apr 2017View
DRAINAGE LAYOUT SHEET 2Initial Drawing13 Apr 2017View
KERB AND SURFACING LAYOUT SHEET 1Initial Drawing13 Apr 2017View
TRAFFIC MANAGEMENT PLANInitial Drawing13 Apr 2017View
BOLLARDInitial Drawing13 Apr 2017View
TRAFFIC MANAGEMENT PLANInitial Drawing13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 1Initial Drawing13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 1Initial Drawing13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 1Initial Drawing13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing13 Apr 2017View
SECTION 38 PROPOSED STREET LIGHTING DESIGNInitial Drawing13 Apr 2017View
PHASE 1 OUTDOOR LIGHTING REPORTInitial Drawing13 Apr 2017View
TRAFFIC MANAGEMENT PLANInitial Drawing13 Apr 2017View
1.8M HIGH TIMBER ACCOUSTIC FENCEInitial Drawing13 Apr 2017View
BOUNDARY TREATMENT PLAN (NORTHERN)Initial Drawing13 Apr 2017View
GLAZING AND VENTILATION STRATEGYInitial Drawing13 Apr 2017View
1.8M HIGH TIMBER ACCOUSTIC FENCEInitial Drawing13 Apr 2017View
BOUNDARY TREATMENT PLAN (NORTHERN)Initial Drawing13 Apr 2017View
HYDROBRAKE MANHOLE SECTIONS AND DETAILS SHEET 1Initial Drawing13 Apr 2017View
FOUL NETWORK 4 PUMPING STATEMENT COMPOUND DETAILSInitial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 1Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 7Initial Drawing13 Apr 2017View
CATCHMENT ANALYSIS SHEET 1Initial Drawing13 Apr 2017View
CATCHMENT ANALYSIS SHEET 2Initial Drawing13 Apr 2017View
MANHOLE SCHEDULES STORM WATERInitial Drawing13 Apr 2017View
MANHOLE SCHEDULES FOUL WATERInitial Drawing13 Apr 2017View
HYDROBRAKE MANHOLE SECTIONS AND DETAILS SHEET 2Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 2Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 5Initial Drawing13 Apr 2017View
LONGITUDINAL SECTIONS SHEET 6Initial Drawing13 Apr 2017View
DRAINAGE LAYOUT SHEET 2Initial Drawing13 Apr 2017View
KERB AND SURFACING LAYOUT SHEET 1Initial Drawing13 Apr 2017View
1.8M HIGH TIMBER ACOUSTIC FENCEInitial Drawing13 Apr 2017View
DWARF WALL AND PIER DETAILInitial Drawing13 Apr 2017View
ECOLOGY LAYOUT (NORTHERN PHASES)Initial Drawing13 Apr 2017View
4 RAIL, POST AND RAIL FENCEInitial Drawing13 Apr 2017View
BOUNDARY TREATMENT PLAN (NORTHERN)Initial Drawing13 Apr 2017View
1100MM HIGH BOW TOP FENCEInitial Drawing13 Apr 2017View
1.8 HIGH TIMBER SCREEN FENCEInitial Drawing13 Apr 2017View
PLOT DIVISIONAL FENCEInitial Drawing13 Apr 2017View
600MM HIGH TIMBER KNEE RAIL FENCEInitial Drawing13 Apr 2017View
DOCUMENT REGISTER/TRANSMITTALSupplementary Documents/Background Papers13 Apr 2017View
POLLUTION CONTRUCTION METHOD STATEMENTSupplementary Documents/Background Papers13 Apr 2017View
TRAFFIC AND TRANSPORT MANAGEMENT PLANSupplementary Documents/Background Papers13 Apr 2017View
WHEEL WASHING FACILITIESSupplementary Documents/Background Papers13 Apr 2017View
EMERGENCY ACCESS STATEMENTSupplementary Documents/Background Papers13 Apr 2017View
PONTINS PHASING STATEMENTSupplementary Documents/Background Papers13 Apr 2017View
ROAD SETTING OUT INFORMATIONSupplementary Documents/Background Papers13 Apr 2017View
SECTION 278 AND SECTION 38 HIGHWAY ACTSupplementary Documents/Background Papers13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 1Supplementary Documents/Background Papers13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 2Supplementary Documents/Background Papers13 Apr 2017View
ROAD CONSTRUCTION DETAILSSupplementary Documents/Background Papers13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 1Supplementary Documents/Background Papers13 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 1Supplementary Documents/Background Papers13 Apr 2017View
ROAD SETTING OUT INFORMATIONSupplementary Documents/Background Papers13 Apr 2017View
ROAD MAINTENANCE STATEMENTSupplementary Documents/Background Papers13 Apr 2017View
DUCT AND NOISE STATEMENTSupplementary Documents/Background Papers13 Apr 2017View
TRAFFIC AND TRANSPORT MANAGEMENT PLANSupplementary Documents/Background Papers13 Apr 2017View
CARLETON MEADOWSSupplementary Documents/Background Papers13 Apr 2017View
WHEEL WASHING STATEMENTSupplementary Documents/Background Papers13 Apr 2017View
NOISE ASSESSMENTSupplementary Documents/Background Papers13 Apr 2017View
DOCUMENT REGISTER/TRANSMITTALSupplementary Documents/Background Papers13 Apr 2017View
VEHCLE SAFETY PROTECTION MEASURESSupplementary Documents/Background Papers13 Apr 2017View
COVERING LETTERSupplementary Documents/Background Papers13 Apr 2017View
PHASE 1 DRAINAGE LAYOUTSupplementary Documents/Background Papers12 Apr 2017View
APPLICATIONFORMNOPERSONALDATApplication Form11 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 1Initial Drawing11 Apr 2017View
ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing11 Apr 2017View
EXTERNAL WORKS SHEET 1 OF 7Initial Drawing11 Apr 2017View
EXTERNAL WORKS SHEET 2 OF 7Initial Drawing11 Apr 2017View
EXTERNAL WORKS SHEET 3 OF 7Initial Drawing11 Apr 2017View
EXTERNAL WORKS SHEET 4 OF 7Initial Drawing11 Apr 2017View
EXTERNAL WORKS SHEET 4 OF 7Initial Drawing11 Apr 2017View
EXTERNAL WORKS SHEET 4 OF 7Initial Drawing11 Apr 2017View
1.8M HIGH TIMBER ACCOUSTIC FENCEInitial Drawing11 Apr 2017View
DWARF WALL AND PIER DETAILInitial Drawing11 Apr 2017View
ECOLOGY LAYOUT (NORTHERN PHASE)Initial Drawing11 Apr 2017View
4 RAIL, POST AND RAIL FENCEInitial Drawing11 Apr 2017View
BOUNDARY TREATMENT PLAN (NORTHERN)Initial Drawing11 Apr 2017View
SURFACE TREATMENT PLAN (NORTHERN)Initial Drawing11 Apr 2017View
1100MM HIGH BOW TOP FENCEInitial Drawing11 Apr 2017View
1.8M HIGH TIMBER SCREEN FENCEInitial Drawing11 Apr 2017View
PLOT DIVISIONAL FENCEInitial Drawing11 Apr 2017View
600MM HIGH TIMBER KNEE RAIL FENCEInitial Drawing11 Apr 2017View
ROAD SETTING OUT INFORMATIONSupplementary Documents/Background Papers11 Apr 2017View
DRAINAGE LAYOUT SHEET 2Supplementary Documents/Background Papers11 Apr 2017View
KERB AND SURFACING LAYOUT SHEET 1Supplementary Documents/Background Papers11 Apr 2017View
LANDSCAPE PROPOSALS SHEET 1 OF 4Supplementary Documents/Background Papers11 Apr 2017View
LANDSCAPE PROPOSALS SHEET 2 OF 4Supplementary Documents/Background Papers11 Apr 2017View
LANDSCAPE PROPOSALS SHEET 3 OF 4Supplementary Documents/Background Papers11 Apr 2017View
LANDSCAPE PROPOSALS SHEET 4 OF 4Supplementary Documents/Background Papers11 Apr 2017View
PLANT TRANSLOCATION METHOD STATEMENTSupplementary Documents/Background Papers11 Apr 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Issued
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.