Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
PONTINS HOLIDAY CAMP, CLIFTON DRIVE NORTH, LYTHAM ST ANNES, FY8 2SX
Last published check: 13 Oct 2026, 05:38. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceAPPLICATION TO DISCHARGE DETAILS ASSOCIATED WITH CONDITIONS OF PLANNING PERMISSION 16/0062: CONDITION 3 (LEVELS) CONDITION 4 (HARD AND SOFT LANDSCAPING) CONDITION 5 (FRA AND MITIGATION MEASURES) CONDITION 6 (SURFACE WATER DRAINAGE STRATEGY) CONDITION 7 (MANAGEMENT AND MAINTENANCE OF SUDS) CONDITION 9 (SURFACE WATER POLLUTION PREVENTION) CONDITION 10 (IN CURTILAGE WATER ATTENUATION DETAILS) CONDITION 11 (TRAFFIC MANAGEMENT PLAN) CONDITION 12 (EMERGENCY ACCESS MANAGMENET PLAN) CONDITION 13 (PHASING PROGRAMME) CONDITION 14 (TRAVEL PLAN) CONDITION 15 (SECTION 278 WORKS) CONDITION 16 (ROAD MAINTENANCE STATEMENT) CONDITION 17 (CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - DUST AND NOISE) CONDITION 18 (NOISE ASSESSMENT) CONDITION 20 (STREET LIGHTING SCHEME) CONDITION 23 (CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN) CONDITION 25 (TRESPASS FENCE TO RAILWAY) CONDITION 26 (ACOUSTIC FENCE TO RAILWAY) CONDITION 29 (RAILWAY DRAINAGE) CONDITION 30 (VEHICLE SAFETY ALONGSIDE RAILWAY) CONDITION 31 (ECOLOGICAL MITIGATION AND MANAGEMENT PLAN (EMEP)) CONDITION 34 (BOUNDARY TREATMENTS) CONDITION 36 (METHOD STATEMENT COMMON LIZARDS)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsPONTINS HOLIDAY CAMP, CLIFTON DRIVE NORTH, LYTHAM ST ANNES, FY8 2SX
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| DEEMED DISCHARGE 2Correspondence | 12 Jul 2021 | View |
| DEEMED DISCHARGE LETTERCorrespondence | 20 Jun 2021 | View |
| PLOT DRAINAGE SHEET 4Additional Information | 16 Dec 2020 | View |
| NETWORK RAILConsultee Comment | 30 Mar 2020 | View |
| ACOUSTIC FENCE TO RAILAWAYAdditional Information | 20 Mar 2020 | View |
| PLOT DRAINAGE SHEET 2Additional Information | 16 Dec 2019 | View |
| PLOT DRAINAGE SHEET 6Additional Information | 16 Dec 2019 | View |
| PLOT DRAINAGE SHEET 8Additional Information | 16 Dec 2019 | View |
| DRAINAGE SOAKAWAY 191212Additional Information | 16 Dec 2019 | View |
| TRANSMITTAL_13214Additional Information | 16 Dec 2019 | View |
| WALL WITH PEBBLE DETAILSRevised Drawing | 10 May 2019 | View |
| TRAVEL PLANRevised Drawing | 10 May 2019 | View |
| BOUNDARY TREATMENT PLANRevised Drawing | 10 May 2019 | View |
| BAPARevised Drawing | 10 May 2019 | View |
| LIGHTING PLANRevised Drawing | 10 May 2019 | View |
| CADENT GASConsultee Comment | 25 Apr 2019 | View |
| NETWORK RAILConsultee Comment | 26 Mar 2019 | View |
| UNITED UTILITESConsultee Comment | 7 Mar 2019 | View |
| NOISE ASSESSMENTSupplementary Documents/Background Papers | 5 Mar 2019 | View |
| ENVIRONMENTAL MANAGEMENT PLANSupplementary Documents/Background Papers | 5 Mar 2019 | View |
| TRAVEL PLANSupplementary Documents/Background Papers | 5 Mar 2019 | View |
| FRA AND MITIGATION - CONDITION 5Supplementary Documents/Background Papers | 5 Mar 2019 | View |
| APPENDIX A - CONDITION 5Supplementary Documents/Background Papers | 5 Mar 2019 | View |
| APPENDIX B - CONDITION 5Supplementary Documents/Background Papers | 5 Mar 2019 | View |
| APPENDIX C - CONDITION 5Supplementary Documents/Background Papers | 5 Mar 2019 | View |
| APPENDIX D - CONDITION 5Supplementary Documents/Background Papers | 5 Mar 2019 | View |
| APPENDIX E - CONDITION 5Supplementary Documents/Background Papers | 5 Mar 2019 | View |
| DRAINAGE LAYOUT SHEET ESupplementary Documents/Background Papers | 5 Mar 2019 | View |
| ENVIRONMENT AGENCYConsultee Comment | 15 Aug 2017 | View |
| EXISTING AND PROPOSED IMPERMEABLE AREASInitial Drawing | 15 Aug 2017 | View |
| SOAKAWAY PROPOSALS CATCHEMENT ANALYSIS NETWORK 1Initial Drawing | 15 Aug 2017 | View |
| SOAKAWAY PROPOSALS CATCHEMENT ANALYSIS NETWORK 2Initial Drawing | 15 Aug 2017 | View |
| SOAKAWAY PROPOSALS CATCHEMENT ANALYSIS NETWORK 3Initial Drawing | 15 Aug 2017 | View |
| SOAKAWAY NETWORK 4 CATCHMENTInitial Drawing | 15 Aug 2017 | View |
| PHASE 1 DRAINAGE LAYOUTInitial Drawing | 15 Aug 2017 | View |
| SOAKAWAY NETWORK 1 CALSSupplementary Documents/Background Papers | 15 Aug 2017 | View |
| SOAKAWAY NETWORK 2 CALSSupplementary Documents/Background Papers | 15 Aug 2017 | View |
| COVERING LETTERSupplementary Documents/Background Papers | 15 Aug 2017 | View |
| SOAKAWAY NETWORK 3 CALSSupplementary Documents/Background Papers | 15 Aug 2017 | View |
| SOAKAWAY NETWORK 4 CALSSupplementary Documents/Background Papers | 15 Aug 2017 | View |
| UNITED UTILITIESConsultee Comment | 7 Jun 2017 | View |
| DRAINAGE LAYOUT CInitial Drawing | 25 May 2017 | View |
| CEMP FINALRevised Drawing | 25 May 2017 | View |
| UNITED UTILITIESConsultee Comment | 18 May 2017 | View |
| ENV HEALTHConsultee Comment | 18 May 2017 | View |
| NATURAL ENGLANDConsultee Comment | 12 May 2017 | View |
| THE ENVIRONMENT AGENCYConsultee Comment | 28 Apr 2017 | View |
| 1 - STANDARD ACKNOWLEDGEMENT LETTERCorrespondence | 25 Apr 2017 | View |
| HYDROBRAKE MANHOLE SECTIONS AND DETAILSInitial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 1Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 3Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 4Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 7Initial Drawing | 13 Apr 2017 | View |
| CATCHMENT ANALYSIS SHEET 1Initial Drawing | 13 Apr 2017 | View |
| CATCHMENT ANALYSIS SHEET 2Initial Drawing | 13 Apr 2017 | View |
| DRAINAGE LAYOUT SHEET 1Initial Drawing | 13 Apr 2017 | View |
| MANHOLE SCHEDULES STORM WATERInitial Drawing | 13 Apr 2017 | View |
| MANHOLE SCHEDULES FOUL WATERInitial Drawing | 13 Apr 2017 | View |
| HYDROBRAKE MANHOLE SECTIONS AND DETAILS SHEET 2Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 2Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 5Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 6Initial Drawing | 13 Apr 2017 | View |
| DRAINAGE LAYOUT SHEET 2Initial Drawing | 13 Apr 2017 | View |
| KERB AND SURFACING LAYOUT SHEET 1Initial Drawing | 13 Apr 2017 | View |
| TRAFFIC MANAGEMENT PLANInitial Drawing | 13 Apr 2017 | View |
| BOLLARDInitial Drawing | 13 Apr 2017 | View |
| TRAFFIC MANAGEMENT PLANInitial Drawing | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 1Initial Drawing | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 1Initial Drawing | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 1Initial Drawing | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing | 13 Apr 2017 | View |
| SECTION 38 PROPOSED STREET LIGHTING DESIGNInitial Drawing | 13 Apr 2017 | View |
| PHASE 1 OUTDOOR LIGHTING REPORTInitial Drawing | 13 Apr 2017 | View |
| TRAFFIC MANAGEMENT PLANInitial Drawing | 13 Apr 2017 | View |
| 1.8M HIGH TIMBER ACCOUSTIC FENCEInitial Drawing | 13 Apr 2017 | View |
| BOUNDARY TREATMENT PLAN (NORTHERN)Initial Drawing | 13 Apr 2017 | View |
| GLAZING AND VENTILATION STRATEGYInitial Drawing | 13 Apr 2017 | View |
| 1.8M HIGH TIMBER ACCOUSTIC FENCEInitial Drawing | 13 Apr 2017 | View |
| BOUNDARY TREATMENT PLAN (NORTHERN)Initial Drawing | 13 Apr 2017 | View |
| HYDROBRAKE MANHOLE SECTIONS AND DETAILS SHEET 1Initial Drawing | 13 Apr 2017 | View |
| FOUL NETWORK 4 PUMPING STATEMENT COMPOUND DETAILSInitial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 1Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 7Initial Drawing | 13 Apr 2017 | View |
| CATCHMENT ANALYSIS SHEET 1Initial Drawing | 13 Apr 2017 | View |
| CATCHMENT ANALYSIS SHEET 2Initial Drawing | 13 Apr 2017 | View |
| MANHOLE SCHEDULES STORM WATERInitial Drawing | 13 Apr 2017 | View |
| MANHOLE SCHEDULES FOUL WATERInitial Drawing | 13 Apr 2017 | View |
| HYDROBRAKE MANHOLE SECTIONS AND DETAILS SHEET 2Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 2Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 5Initial Drawing | 13 Apr 2017 | View |
| LONGITUDINAL SECTIONS SHEET 6Initial Drawing | 13 Apr 2017 | View |
| DRAINAGE LAYOUT SHEET 2Initial Drawing | 13 Apr 2017 | View |
| KERB AND SURFACING LAYOUT SHEET 1Initial Drawing | 13 Apr 2017 | View |
| 1.8M HIGH TIMBER ACOUSTIC FENCEInitial Drawing | 13 Apr 2017 | View |
| DWARF WALL AND PIER DETAILInitial Drawing | 13 Apr 2017 | View |
| ECOLOGY LAYOUT (NORTHERN PHASES)Initial Drawing | 13 Apr 2017 | View |
| 4 RAIL, POST AND RAIL FENCEInitial Drawing | 13 Apr 2017 | View |
| BOUNDARY TREATMENT PLAN (NORTHERN)Initial Drawing | 13 Apr 2017 | View |
| 1100MM HIGH BOW TOP FENCEInitial Drawing | 13 Apr 2017 | View |
| 1.8 HIGH TIMBER SCREEN FENCEInitial Drawing | 13 Apr 2017 | View |
| PLOT DIVISIONAL FENCEInitial Drawing | 13 Apr 2017 | View |
| 600MM HIGH TIMBER KNEE RAIL FENCEInitial Drawing | 13 Apr 2017 | View |
| DOCUMENT REGISTER/TRANSMITTALSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| POLLUTION CONTRUCTION METHOD STATEMENTSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| TRAFFIC AND TRANSPORT MANAGEMENT PLANSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| WHEEL WASHING FACILITIESSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| EMERGENCY ACCESS STATEMENTSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| PONTINS PHASING STATEMENTSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATIONSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| SECTION 278 AND SECTION 38 HIGHWAY ACTSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 1Supplementary Documents/Background Papers | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 2Supplementary Documents/Background Papers | 13 Apr 2017 | View |
| ROAD CONSTRUCTION DETAILSSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 1Supplementary Documents/Background Papers | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 1Supplementary Documents/Background Papers | 13 Apr 2017 | View |
| ROAD SETTING OUT INFORMATIONSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| ROAD MAINTENANCE STATEMENTSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| DUCT AND NOISE STATEMENTSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| TRAFFIC AND TRANSPORT MANAGEMENT PLANSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| CARLETON MEADOWSSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| WHEEL WASHING STATEMENTSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| NOISE ASSESSMENTSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| DOCUMENT REGISTER/TRANSMITTALSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| VEHCLE SAFETY PROTECTION MEASURESSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| COVERING LETTERSupplementary Documents/Background Papers | 13 Apr 2017 | View |
| PHASE 1 DRAINAGE LAYOUTSupplementary Documents/Background Papers | 12 Apr 2017 | View |
| APPLICATIONFORMNOPERSONALDATApplication Form | 11 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 1Initial Drawing | 11 Apr 2017 | View |
| ROAD SETTING OUT INFORMATION SHEET 2Initial Drawing | 11 Apr 2017 | View |
| EXTERNAL WORKS SHEET 1 OF 7Initial Drawing | 11 Apr 2017 | View |
| EXTERNAL WORKS SHEET 2 OF 7Initial Drawing | 11 Apr 2017 | View |
| EXTERNAL WORKS SHEET 3 OF 7Initial Drawing | 11 Apr 2017 | View |
| EXTERNAL WORKS SHEET 4 OF 7Initial Drawing | 11 Apr 2017 | View |
| EXTERNAL WORKS SHEET 4 OF 7Initial Drawing | 11 Apr 2017 | View |
| EXTERNAL WORKS SHEET 4 OF 7Initial Drawing | 11 Apr 2017 | View |
| 1.8M HIGH TIMBER ACCOUSTIC FENCEInitial Drawing | 11 Apr 2017 | View |
| DWARF WALL AND PIER DETAILInitial Drawing | 11 Apr 2017 | View |
| ECOLOGY LAYOUT (NORTHERN PHASE)Initial Drawing | 11 Apr 2017 | View |
| 4 RAIL, POST AND RAIL FENCEInitial Drawing | 11 Apr 2017 | View |
| BOUNDARY TREATMENT PLAN (NORTHERN)Initial Drawing | 11 Apr 2017 | View |
| SURFACE TREATMENT PLAN (NORTHERN)Initial Drawing | 11 Apr 2017 | View |
| 1100MM HIGH BOW TOP FENCEInitial Drawing | 11 Apr 2017 | View |
| 1.8M HIGH TIMBER SCREEN FENCEInitial Drawing | 11 Apr 2017 | View |
| PLOT DIVISIONAL FENCEInitial Drawing | 11 Apr 2017 | View |
| 600MM HIGH TIMBER KNEE RAIL FENCEInitial Drawing | 11 Apr 2017 | View |
| ROAD SETTING OUT INFORMATIONSupplementary Documents/Background Papers | 11 Apr 2017 | View |
| DRAINAGE LAYOUT SHEET 2Supplementary Documents/Background Papers | 11 Apr 2017 | View |
| KERB AND SURFACING LAYOUT SHEET 1Supplementary Documents/Background Papers | 11 Apr 2017 | View |
| LANDSCAPE PROPOSALS SHEET 1 OF 4Supplementary Documents/Background Papers | 11 Apr 2017 | View |
| LANDSCAPE PROPOSALS SHEET 2 OF 4Supplementary Documents/Background Papers | 11 Apr 2017 | View |
| LANDSCAPE PROPOSALS SHEET 3 OF 4Supplementary Documents/Background Papers | 11 Apr 2017 | View |
| LANDSCAPE PROPOSALS SHEET 4 OF 4Supplementary Documents/Background Papers | 11 Apr 2017 | View |
| PLANT TRANSLOCATION METHOD STATEMENTSupplementary Documents/Background Papers | 11 Apr 2017 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.