Council planning record

Installation and operation of a renewable energy generating station comprising ground-mounted photovoltaic solar arrays together with inverter units, substation, site access, internal access tracks, security measures, access gates, other ancillary infrastructure and landscaping and biodiversity enhancements.

Land To The South Of Murrells End Hartpury Gloucestershire

RefusedReference: P0271/22/FULForest of Dean District Council

Last published check: 2 Oct 2026, 10:48. Check the council record for more recent changes.

Application location

Land To The South Of Murrells End Hartpury Gloucestershire

This record has no verified map location.

View council map

Application summary

Status
Refused
Application type
Full Application
Received
25 Feb 2022
Validated
1 Jun 2022
Determination deadline
21 Sept 2022
Local authority
Forest of Dean District Council

Application overview

Installation and operation of a renewable energy generating station comprising ground-mounted photovoltaic solar arrays together with inverter units, substation, site access, internal access tracks, security measures, access gates, other ancillary infrastructure and landscaping and biodiversity enhancements.

Proposal details

Reference
P0271/22/FUL
Alternative references
DF16070
Ward
Hartpury & Redmarley
Parish
Hartpury
Agent
RPS Group

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 211 of 211

DocumentPublishedAction
APPEAL DISMISSEDAppeal Decision · PDF15 Jul 2024View
NATURAL ENGLAND - ANNEX AConsultee Comment · PDF8 May 2024View
RUDFORD AND HIGHLEADON PARISH COUNCILConsultee Comment · PDF20 Dec 2023View
WOLFSONPublic Comment · PDF20 Dec 2023View
ORRITT -27.11.2023Public Comment · PDF20 Dec 2023View
STATEMENT OF CASECouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 12Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 11Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 10Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 9 LAYOUT PLANCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 9 LOCATION PLANCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 8Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 7 LANDSCAPE STATEMENTCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 7 LANDSCAPE STATEMENT APPENDIX CT-1Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 7 LANDSCAPE STATEMENT APPENDIX CT-2Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 5 SCREENING OPINIONCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 4 PRE-APP REPORTCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 4 OFFICER RESPONSECouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 4 FURTHER OFFICER RESPONSECouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 3 SITE MAPCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 2Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 1 CORRESPONDENCECouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 1 CORRESPONDENCECouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 1 CORRESPONDENCECouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 1 CORRESPONDENCECouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 1 AREAS OF NO DIG PLANCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 15Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 14Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 13Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 9 DECISION NOTICECouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 7 LANDSCAPE STATEMENT APPENDIX CT-3Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 7 LANDSCAPE STATEMENT APPENDIX CT-4Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 6Council`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 5 SCREENING DETERMINATIONCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 4 CONSULTEE COMMENTSCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 4 CONSULTEE PHOTOGRAPHSCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 3 SITE MAPCouncil`s Case · PDF19 Dec 2023View
STATEMENT OF CASE - APPENDIX 3 AERIAL MAPCouncil`s Case · PDF19 Dec 2023View
AREAS OF 'NO-DIG' INSTALLATIONDrawing · PDF18 Dec 2023View
ECOLOGICAL ADDENDUM 2023 ? FINAL REPORTAppellants Case · PDF21 Nov 2023View
HEARING QUESTIONNAIREQuestionnaire · PDF10 Nov 2023View
STATEMENT OF CASE - APPENDIX 5 APPEAL DECISIONAppellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 5 APPEAL DECISIONAppellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 10Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASEAppellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 2Appellants Case3 Nov 2023View
STATEMENT OF CASE - APPENDIX 3Appellants Case3 Nov 2023View
STATEMENT OF CASE - APPENDIX 6Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 7Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 8Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 9Appellants Case3 Nov 2023View
STATEMENT OF CASE - APPENDIX 12Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 4Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 5 APPEAL DECISIONAppellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 5 DECISION NOTICEAppellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 5 CORRESPONDENCEAppellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 1Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 11Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 13Appellants Case · PDF3 Nov 2023View
STATEMENT OF CASE - APPENDIX 4 PHOTOGRAPHAppellants Case3 Nov 2023View
STATEMENT OF CASE - APPENDIX 4 PHOTOGRAPHAppellants Case3 Nov 2023View
GEOPHYSICAL SURVEY REPORTAppellants Case · PDF2 Nov 2023View
SITE LAYOUT PLANAppellants Case · PDF2 Nov 2023View
SUBSTATION PLANSAppellants Case · PDF2 Nov 2023View
DEVELOPMENT MANAGEMENT COMMITTEE 14.03.2023Committee schedule extract14 Aug 2023View
LETTER- TO SECRETARY OF STATE RE: DECISIONCorrespondence16 Mar 2023View
DecisionDecision · PDF15 Mar 2023View
Late Material for Planning CommitteeLate Material for Planning Committee15 Mar 2023View
EIA REGULATION STATEMENTCorrespondence · PDF15 Mar 2023View
SITE INSPECTION PANEL NOTESCorrespondence8 Mar 2023View
HISTORIC ENGLANDConsultee Comment · PDF24 Feb 2023View
GCC HIGHWAYSConsultee Comment · PDF21 Feb 2023View
HARTPURY PARISH COUNCILConsultee Comment · PDF20 Feb 2023View
SUSTAINABILITY - ECOLOGYConsultee Comment15 Feb 2023View
ENVIRONMENT AGENCYConsultee Comment13 Feb 2023View
ENVIRONMENT AGENCY REQUESTS AN EXTENSION OF TIME TO RESPONDCorrespondence · PDF9 Feb 2023View
HISTORIC ENGLANDConsultee Comment · PDF26 Jan 2023View
RUDFORD AND HIGHLEADON PARISH COUNCILConsultee Comment · PDF25 Jan 2023View
RUDFORD AND HIGHLEADON PARISH COUNCILConsultee Comment24 Jan 2023View
HISTORIC ENGLANDConsultee Comment23 Jan 2023View
RUDFORD AND HIGHLEADON PARISH COUNCILConsultee Comment · PDF18 Jan 2023View
PARISH COUNCIL CONFIRMATION OF EXTENSION OF TIME TO RESPONDCorrespondence · PDF17 Jan 2023View
REVISED DRAWING- SITE LAYOUTDrawing · PDF12 Jan 2023View
ADDITIONAL LETTER- RESPONSE TO COUNCILS ECOLOGISTCorrespondence · PDF12 Jan 2023View
ADDITIONAL ECOLOGICAL ADDENDUMReport · PDF12 Jan 2023View
ADDITIONAL NOISE LEVELS DAYReport · PDF12 Jan 2023View
ADDITIONAL ECOLOGICAL APPRAISALReport · PDF12 Jan 2023View
ADDITIONAL NOISE LEVELS NIGHTReport · PDF12 Jan 2023View
ADDITIONAL HERITAGE RESPONSEReport · PDF12 Jan 2023View
OFFICER/AGENT EMAILCorrespondence · PDF12 Jan 2023View
AGENT LETTER- RE: CONSULTATION RESPONSES (RESPONSE)Correspondence · PDF12 Jan 2023View
ADDITIONAL ARCHAEOLOGY WRITTEN SCHEME OF INVESTIGATIONReport · PDF12 Jan 2023View
ADDITIONAL NOISE LEVELS 5 ? 7AMReport · PDF12 Jan 2023View
AGREEMENT TO EXTENSION OF TIMECorrespondence · PDF16 Dec 2022View
CPREConsultee Comment · PDF15 Sept 2022View
NATURAL ENGLANDConsultee Comment · PDF12 Sept 2022View
APPLICATION SUMMARYCorrespondence · PDF1 Sept 2022View
AGREEMENT TO EXTENSION OF TIMECorrespondence · PDF31 Aug 2022View
CORRESPONDENCE RE: E-MAIL TO AGENTCorrespondence · PDF22 Aug 2022View
SUSTAINABILITY APPRORIATE ASSESSMENTConsultee Comment22 Aug 2022View
SUSTAINABILITY LIKELY SIGNIFICANT EFFECTSConsultee Comment22 Aug 2022View
SUSTAINABILITY ECOLOGYConsultee Comment22 Aug 2022View
OFFICER REQUEST FOR EXTENSION OF TIMECorrespondence · PDF17 Aug 2022View
LANDSCAPE OFFICERConsultee Comment · PDF15 Aug 2022View
HISTORIC ENGLANDConsultee Comment · PDF11 Aug 2022View
ENVIRONMENT AGENCYConsultee Comment10 Aug 2022View
NATURAL ENGLANDConsultee Comment · PDF5 Aug 2022View
HARTPURY PARISH COUNCILConsultee Comment · PDF29 Jul 2022View
PARISH COUNCILConsultee Comment26 Jul 2022View
CONSERVATION ADVISORConsultee Comment · PDF25 Jul 2022View
COUNTY ARCHAEOLOGISTConsultee Comment · PDF13 Jul 2022View
SUSTAINABILITY GCNConsultee Comment13 Jul 2022View
Public CommentPublic Comment · PDF13 Jul 2022View
GCC MINERALS AND WASTEConsultee Comment · PDF7 Jul 2022View
LOCAL PLANSConsultee Comment28 Jun 2022View
GCC PUBLIC RIGHTS OF WAY (PROW)Consultee Comment · PDF28 Jun 2022View
LAND DRAINAGE OFFICERConsultee Comment · PDF24 Jun 2022View
CORRESPONDENCE OFFICER/AGENTCorrespondence · PDF22 Jun 2022View
Public CommentPublic Comment · PDF21 Jun 2022View
GCC LEAD LOCAL FLOOOD AUTHORITYConsultee Comment · PDF21 Jun 2022View
SUSTAINABILITY TREESConsultee Comment21 Jun 2022View
PARISH COUNCIL EXTENSION OF TIME AGREEMENT TO RESPONDCorrespondence · PDF21 Jun 2022View
AGREEMENT TO PARISH COUNCIL EXTENSION OF TIMECorrespondence · PDF20 Jun 2022View
Site NoticeSite Notice · PDF20 Jun 2022View
Site NoticeSite Notice · PDF20 Jun 2022View
Site NoticeSite Notice · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS - MURRELLS END CHAPTER 5 LANDSCAPEReport · PDF20 Jun 2022View
FIGURE 1.1 MURRELLS END SITE LOCATION PLANDrawing · PDF20 Jun 2022View
FIGURE 5.1_DESIGNATIONSDrawing · PDF20 Jun 2022View
FIGURE 5.4A_ZTV & VIEWPOINTSDrawing20 Jun 2022View
FIGURE 5.4B_LCA+ZTVDrawing · PDF20 Jun 2022View
FIGURE 5.27 TO 5.32 PHOTOMONTAGES_4268-0007-01 RDrawing · PDF20 Jun 2022View
FIGURE 5.33_LANDSCAPE PROPOSALSDrawing · PDF20 Jun 2022View
FIGURE 7.2 NON.DESIGNATED ASSETSDrawing · PDF20 Jun 2022View
FIGURE 7.6 LIDAR SLRMDrawing · PDF20 Jun 2022View
FIGURE 7.10 HLCDrawing · PDF20 Jun 2022View
FIGURE 7.9 GEOPHYSDrawing · PDF20 Jun 2022View
APPENDIX 1.2 STATEMENT OF EXPERTISEReport · PDF20 Jun 2022View
APPENDIX 2.1 MURRELLS END - CONSTRUCTION TRAFFIC MANAGEMENT PLANReport · PDF20 Jun 2022View
APPENDIX 4.1 CUMULATIVE ASSESSMENT 2022Report · PDF20 Jun 2022View
APPENDIX 5.2 MURRELLS END - GLINT AND GLAREReport · PDF20 Jun 2022View
APPENDIX 7.2 HISTORIC ENV GAZETTEERReport · PDF20 Jun 2022View
APPENDIX 8.3 NOISE REPORTReport · PDF20 Jun 2022View
APPENDIX 8.4 AGRICULTURAL LAND CLASSFICATIONReport · PDF20 Jun 2022View
VOL 3 CONTENTSReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS - MURRELLS END CHAPTER 1 INTRODUCTIONReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS - MURRELLS END CHAPTER 2 PROJECT DESCRIPTIONReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS -MURRELLS END CHAPTER 3 NEEDS AND ALTERNATIVESReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS -MURRELLS END CHAPTER 4 EIA METHODOLOGYReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS -MURRELLS END CHAPTER 6 BIODIVERSITYReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS - MURRELLS END CHAPTER 7 HISTORIC ENVReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS - MURRELLS END CHAPTER 8 OTHER ENV EFFECTSReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT CHAPTERS -VOL 1 CONTENTS AND GLOSSARYReport · PDF20 Jun 2022View
APPENDIX 6.3 MURRELLS END BNG ASSESSMENT_DRAFT_220524Report · PDF20 Jun 2022View
APPENDIX 8.2 FLOOD RISK ASSESSMENTReport · PDF20 Jun 2022View
FIGURE 5.2_LCADrawing · PDF20 Jun 2022View
FIGURE 5.3_TOPOGRAPHYDrawing · PDF20 Jun 2022View
FIGURE 5.5 TO 5.26 PANORAMAS_4268-0001-07 RDrawing · PDF20 Jun 2022View
APPENDIX 1.1 REQUIREMENTS OF EIA LEGISLATIONReport · PDF20 Jun 2022View
APPENDIX 5.1 LANDSCAPE PLANNING POLICYReport · PDF20 Jun 2022View
APPENDIX 6.1 ECOLOGICAL ASSESSMENTReport · PDF20 Jun 2022View
ENVIRONMENTAL STATEMENT - NON TECHNICAL SUMMARYReport · PDF20 Jun 2022View
FIGURE 2.1 JPW1643-002REVC_D220218_(MURRELLS FARM SOLAR PLANNING RED LINE).Drawing · PDF20 Jun 2022View
FIGURE 2.2 JPW1643-001REVJ_D220222_(MURRELLS FARM SOLAR LAYOUT DESIGN)Drawing · PDF20 Jun 2022View
FIGURE 7.1 DESIGNATED ASSETSDrawing · PDF20 Jun 2022View
FIGURE 7.3 1811 OSDDrawing · PDF20 Jun 2022View
FIGURE 7.4 1883 OSDrawing · PDF20 Jun 2022View
FIGURE 7.5 1903 OSDrawing · PDF20 Jun 2022View
FIGURE 7.7 GEOPHYSDrawing · PDF20 Jun 2022View
FIGURE 7.8 GEOPHYSDrawing · PDF20 Jun 2022View
VOL 2 CONTENTS ENVIRONMENTAL STATEMENTReport · PDF20 Jun 2022View
APPENDIX 2.2 COCPReport · PDF20 Jun 2022View
APPENDIX 6.2 ECOLOGICAL ADDENDUMReport · PDF20 Jun 2022View
APPENDIX 7.1 HISTORIC ENV PLANNING POLICYReport · PDF20 Jun 2022View
APPENDIX 8.1 TRANSPORT STATEMENTReport · PDF20 Jun 2022View
WALES AND WEST UTILITIES RESPONSE WITH MAPCorrespondence · PDF16 Jun 2022View
WESTERN POWER DISTRIBUTION RESPONSECorrespondence · PDF16 Jun 2022View
NATIONAL GRID RESPONSECorrespondence · PDF16 Jun 2022View
WALES AND WEST UTILITIES RESPONSECorrespondence · PDF16 Jun 2022View
WESTERN POWER DISTRIBUTION WITH MAPCorrespondence · PDF16 Jun 2022View
WESTERN POWER DISTRIBUTION CHARGING STRUCTURECorrespondence · PDF16 Jun 2022View
ENATIONAL GRID LINE SEARCH ENQUIRY RESPONSECorrespondence · PDF16 Jun 2022View
GIGACLEAR RESPONSECorrespondence · PDF16 Jun 2022View
EMAIL WESTERN POWER DISTRIBUTIONCorrespondence · PDF16 Jun 2022View
ENVIRONMENT AGENCY CHECKLISTEnvironment Agency Checklist · PDF13 Jun 2022View
Neighbour Notification ListNeighbour Notification List · PDF13 Jun 2022View
DC8DC8 · PDF13 Jun 2022View
D&AReport · PDF12 Apr 2022View
TRANSPORT STATEMENTReport · PDF12 Apr 2022View
CONSRUCTION TRAFFIC MANAGEMENT PLANReport · PDF6 Apr 2022View
GEOPHYSICAL SURVEYReport · PDF6 Apr 2022View
GLINT AND GLARE STUDYReport · PDF6 Apr 2022View
FLOOD RISK ASSESSMENTReport · PDF6 Apr 2022View
NOISE REPORTReport · PDF6 Apr 2022View
TRANSPORT STATEMENTReport · PDF6 Apr 2022View
ARBORICULTURAL IMPACT ASSESSMENTReport · PDF6 Apr 2022View
AGRICULTURAL LAND CLASSIFICATIONReport · PDF6 Apr 2022View
Application FormApplication Form · PDF25 Feb 2022View
THE LOCATION PLANDrawing · PDF25 Feb 2022View
SITE PLAN - CONCEPT SOLAR DESIGNDrawing · PDF25 Feb 2022View
REPORT - 6 PAGES - WESTERN POWERDrawing · PDF25 Feb 2022View
TYPICAL PANEL - PLANNING DETAILSDrawing · PDF25 Feb 2022View
FENCE AND GATE DETAILSDrawing · PDF25 Feb 2022View
ACCESS ROADDrawing · PDF25 Feb 2022View
TYPICAL INVERTERDrawing · PDF25 Feb 2022View
TEMPORARY CONSTRUCTION COMPOUNDDrawing · PDF25 Feb 2022View
CCTV DETAILSDrawing · PDF25 Feb 2022View
CABLE TRENCH DETAILDrawing · PDF25 Feb 2022View
8 DRAWINGS - TOPOGRAPHICIAL SURVEYDrawing · PDF25 Feb 2022View
COVERING LETTERAgent letter · PDF25 Feb 2022View
DESIGN AND ACCESS STATEMENTReport · PDF25 Feb 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Refused

Appeal status: Appeal decided · Appeal Dismissed

APPEAL DISMISSED STATEMENT OF CASE - APPENDIX 9 DECISION NOTICE STATEMENT OF CASE - APPENDIX 5 APPEAL DECISION STATEMENT OF CASE - APPENDIX 5 APPEAL DECISION STATEMENT OF CASE - APPENDIX 5 APPEAL DECISION STATEMENT OF CASE - APPENDIX 5 DECISION NOTICE LETTER- TO SECRETARY OF STATE RE: DECISION Decision

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.