The development hereby approved shall be commenced before the expiration of five years from the date of this permission. REASON: To comply with the requirements of Sections 91 to 93 of the Town and Country Planning Act, 1990.
The development shall be carried out in accordance with the following approved plans and documents: AMENDED Application Form date received 15/10/25 AMENDED Location Plan TDS-25-196-00 date received 15/10/25 AMENDED Proposed Site Plan TDS-24-19 date received 15/10/25 AMENDED Proposed Floor Plan & Elevations TDS-25- 196-04 Rev I date received 5/12/25 REASON: To ensure that the development is carried out in accordance with the approved details.
The HMO hereby permitted shall be occupied by no more than 4 persons REASON: In order to control the scale of occupation in compliance with Local Development Plan Policies PC2 and HN7.
The building shall not be brought into use until the bin storage, cycle storge and drying area shown on Drwg TDS25-196-04 Rev I have been provided to the written satisfaction of the Local Planning Authority. The approved bin storage, cycle storage and drying area shall be retained thereafter. REASON: In the interests of visual/residential amenity and in compliance with Policies PC2 and HN7 of the Flintshire Local Development Plan.
No development shall commence until a scheme of biodiversity net benefit to incorporate bird nesting boxes has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented in accordance with a timetable to be approved in accordance with the approved details or any agreed variation therefrom and shall be retained thereafter. REASON: In the interests of visual amenity and maintaining and enhancing biodiversity in accordance with Local Development Plan Policies STR13, PC2 and Planning Policy Wales (PPW) Edition 12
No development shall commence until details of the full ownership, risk assessment and method statement for the protection of the structural condition of the sewer crossing the site has been submitted to and approved in writing by the Local Planning Authority. The approved protection measures shall be implemented in full before any other development hereby permitted has commenced, and shall be retained at all times for the duration of the approved operations including the restoration works. REASON: In order to protect the physical integrity of the sewer in compliance with Policy PC2 of the Flintshire Local Development Plan.
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system. REASON: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment in compliance with Policy PC2 of the Flintshire Local Development Plan.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.