Resubmission of application FUL/000111/26 withdrawn. Change of Use of agricultural building to dwelling. Single storey rear extension to replace existing outbuilding. Single storey rear extension to replace existing lean-to. Two storey rear extension.
Tan Y Foel, Rhes-y-cae, Holywell, CH8 8JQ
A decision notice has been issued in respect of this application.Reference: FUL/000531/26Flintshire County Council
Last published check: 1 Oct 2026, 15:31. Check the council record for more recent changes.
Application location
Tan Y Foel, Rhes-y-cae, Holywell, CH8 8JQ
This record has no verified map location.
Application summary
Status
A decision notice has been issued in respect of this application.
Application type
Full - Building Works
Received
18 Jun 2026
Validated
Not published
Determination deadline
14 Aug 2026
Local authority
Flintshire County Council
Application overview
Resubmission of application FUL/000111/26 withdrawn. Change of Use of agricultural building to dwelling. Single storey rear extension to replace existing outbuilding. Single storey rear extension to replace existing lean-to. Two storey rear extension.
Proposal details
Reference
FUL/000531/26
Alternative references
PP-15020536
Ward
Flintshire Ward Brynford and Halkyn
Parish
Flintshire Community Halkyn Community Council
Agent
Julie Gerrard
UPRN
10013693347
Sign in to view all collected council fields and recorded changes.
The development hereby approved shall be commenced before the expiration of five years from the date of this permission. REASON: To comply with the requirements of Sections 91 to 93 of the Town and Country Planning Act, 1990.
The development shall be carried out in accordance with the following approved plans and documents: Application Form - Received 19/06/2026 Bat Activity Survey - Received 19/06/2026 Design & Access Statement - Received 19/06/2026 Existing Elevations - Dwg 2512.02 - Received 19/06/2026 Existing Floor Plans - Dwg 2512.01 - Received 19/06/2026 Existing Site Plan - Dwg 2512.06 - Received 19/06/2026 Green Infrastructure Statement - Received 19/06/2026 Location Plan - Received 19/06/2026 Proposed Elevations - Dwg 2513.05 Rev A - Received 19/06/2026 Proposed Floor Plans - Dwg 2513.04 Rev A - Received 19/06/2026 Proposed Site Plan - Dwg 2512.03 Rev A - Received 19/06/2026 Protected Species Survey - Received 19/06/2026 Structural Condition Inspection Report - Received 19/06/2026 REASON: To ensure that the development is carried out in accordance with the approved details.
Prior to the commencement of works a programme of building recording and analysis, equivalent to an Historic England Level 2 building survey, shall be secured and implemented. This shall be in accordance with a written scheme of investigation which has been submitted by a qualified and competent expert, experienced in understanding historic buildings, and approved in writing by the local planning authority. The programme of building analysis and recording will be completed in line with the written scheme of investigation discharged as part of the condition. The recording report shall be completed by a competent expert, experienced in understanding historic buildings, and must meet the standards laid down by the Chartered Institute for Archaeologists in their Standard and Guidance for the archaeological investigation and recording of standing buildings or structures. A copy of the resulting report should be submitted to the Local Planning Authority and the Planning Archaeologist, Heneb: Clwyd Powys Archaeology (The Offices, Coed y Dinas, Welshpool, SY21 8RP). After approval by the Local Planning Authority project data must be submitted and approved for inclusion in the Heneb: Clwyd Powys Archaeology Historic Environment Record. The full digital archive must also be submitted and approved for inclusion within the National Monuments Record, RCAHMW. REASON: To allow an adequate analytical record of the buildings' to be made, before they are altered, to ensure that the buildings’ origins, use, and development are understood and the main features, character and state of preservation are recorded.
No development shall take place until a site investigation of the nature and extent of contamination has been carried out in accordance with a methodology which has previously been submitted to and approved in writing by the Local Planning Authority beforehand. If any contamination is found during the site investigation, a report specifying the measures to be taken to remediate the site to render it suitable for the development hereby permitted, including measures to verify the approved works, shall be submitted to and approved in writing by the Local Planning Authority. The site shall be remediated in accordance with the approved measures prior to occupation of any dwelling. If during the course of development, any contamination is found which has not been identified in the site investigation, additional measures for the remediation of this source of contamination and subsequent verification details shall be submitted to and approved in writing by the Local Planning Authority. The remediation of the site shall incorporate the approved additional measures. REASON: In order to ensure that the development is safeguarded against the risks from possible contamination.
The material and finishes of the external surfaces of the walls and roof of the buildings hereby permitted shall be of the same type, texture and colour as those on the external walls and roof of the existing building(s) unless as may be as otherwise agreed in writing by the Local Planning Authority prior to the use of such materials. REASON: In order that the development matches as clearly as possible the external finishes of the existing building(s) and to ensure compliance with Policy PC2 and PC3 in the Flintshire Local Development Plan.
No development, including site clearance, shall commence until a Biosecurity Risk Assessment, and Method Statement that considers invasive non-native species and specific diseases (e.g. Chytrid) has been submitted to and approved in writing by the Local Planning Authority. The risk assessment shall include measures to prevent the introduction of and where present control, removal or for the long-term management of invasive species both during construction and operation. The risk assessment shall consider landscaping and other related plans. The Biosecurity Risk Assessment shall be carried out in accordance with the approved details. REASON: To ensure that an approved Biosecurity Risk Assessment is implemented to secure measures to prevent or control the spread and effective management of any invasive non-native species and listed diseases at the site.
No storage of building materials / use of vehicles must take place within land designated as a SAC. REASON: To ensure that the SAC is protected in accordance with Policy EN6 of the Flintshire Local Development Plan.
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system. REASON: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
Warning: An European protected species (EPS) Licence is required for this development. This planning permission does not provide consent to undertake works that require an EPS licence. It is an offence to deliberately capture, kill or disturb EPS or to recklessly damage or destroy their breeding sites or resting places. If found guilty of any offences, you could be sent to prison for up to 6 months and/or receive an unlimited fine. To undertake the works within the law, you can obtain further information on the need for a licence from Natural Resources Wales on 0300 065 3000 or at https://naturalresources.wales/conservation-biodiversity-and-wildlife/european protected-species/?lang+en
The development hereby approved shall be carried out in strict accordance with the recommendations outlined within the Protected Species Survey. REASON: In order to safeguard protected species in accordance with policy EN6 of the Flintshire Local Development Plan.
Advisory Notes The applicant may need to apply to Dwr Cymru / Welsh Water for any connection to the public sewer under S106 of the Water industry Act 1991. If the connection to the public sewer network is either via a lateral drain (i.e. a drain which extends beyond the connecting property boundary) or via a new sewer (i.e. serves more than one property), it is a mandatory requirement to first enter into a Section 104 Adoption Agreement (Water Industry Act 1991). The design of the sewers and lateral drains must also conform to the Welsh Ministers Standards for Gravity Foul Sewers and Lateral Drains, and conform with the publication "Sewers for Adoption"- 7th Edition. Further information can be obtained via the Developer Services pages of www.dwrcymru.com. The applicant is advised that some public sewers and lateral drains may not be recorded on our maps; some sewers were originally privately owned and were transferred into public ownership by nature of the Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011. The presence of such assets may affect the proposal. In order to assist us in dealing with the proposal the applicant may contact Dwr Cymru Welsh Water. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times. In accordance with Planning Policy Wales (Edition 12) and Technical Advice Note 12 (Design), the applicant is advised to take a sustainable approach in considering water supply in new development proposals, including utilising approaches that improve water efficiency and reduce water consumption. We would recommend that the applicant liaises with the relevant Local Authority Building Control department to discuss their water efficiency requirements. The applicant is advised to engage in consultation with Flintshire County Council, as the determining SuDS Approval Body (SAB), in relation to their proposals for SuDS features. Please note, Dwr Cymru Welsh Water is a statutory consultee to the SAB application process and will provide comments to any SuDS proposals by response to SAB consultation.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.