Council planning record

Proposed change of use to create a separate dwelling above an existing retail premises.

70, High Street, Connahs Quay, Deeside, CH5 4DD

A decision notice has been issued in respect of this application.Reference: FUL/000495/26Flintshire County Council

Last published check: 3 Oct 2026, 18:09. Check the council record for more recent changes.

Application location

70, High Street, Connahs Quay, Deeside, CH5 4DD

This record has no verified map location.

Application summary

Status
A decision notice has been issued in respect of this application.
Application type
Full - Building Works
Received
5 Jun 2026
Validated
Not published
Determination deadline
31 Jul 2026
Local authority
Flintshire County Council

Application overview

Proposed change of use to create a separate dwelling above an existing retail premises.

Proposal details

Reference
FUL/000495/26
Alternative references
PP-14979030
Ward
Flintshire Ward Connah's Quay Wepre
Parish
Flintshire Community Connah's Quay Town Council
Agent
Geraint Edwards
UPRN
10013704587

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
Application Form - RedactedApplication FormNot publishedView
Existing Site Plan - Dwg A002 Rev APlan15 Jun 2026View
Existing Floor Plans - Dwg A003 Rev APlan15 Jun 2026View
Proposed Site Plan - Dwg A101 Rev BPlan15 Jun 2026View
Proposed Floor Plans - Dwg A102 Rev BPlan15 Jun 2026View
Location PlanLocation Plan15 Jun 2026View
Existing Elevations - Dwg A004Elevation15 Jun 2026View
SUPERSEDED 21.07.26 - Proposed Elevations - Dwg A300 Rev BSuperseded15 Jun 2026View
Flood Consequence Assessment- RedactedReport15 Jun 2026View
AMENDED 21.07.26 - Proposed Elevations - Dwg A300- Rev CAmended22 Jul 2026View
ADD INFO 21.07.26 - Green Infrastructure Statement - RedactedAdditional Information22 Jul 2026View
Decision NoticeDecision31 Jul 2026View
Officer's ReportDecision31 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

A01 Approved
Decision Notice Officer's Report
Planning conditions
  1. The development hereby approved shall be commenced before the expiration of five years from the date of this permission. REASON: To comply with the requirements of Sections 91 to 93 of the Town and Country Planning Act, 1990.
  2. The development shall be carried out in accordance with the following approved plans and documents: Application Form Received 05/06/2026 Location Plan Received 05/06/2026 Existing Elevations - Dwg A004 Received 05/06/2026 Existing Floor Plans - Dwg A003 Rev A Received 05/06/2026 Existing Site Plan - Dwg A002 Rev A Received 05/06/2026 AMENDED Proposed Elevations - Dwg A300 Rev B Received 21/07/2026 Proposed Floor Plans - Dwg A102 Rev B Received 05/06/2026 Proposed Site Plan - Dwg A101 Rev B Received 05/06/2026 Flood Consequence Assessment Received 05/06/2026 GIS - Received 21/07/2026 REASON: To ensure that the development is carried out in accordance with the approved details.
  3. No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system. REASON: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
  4. The planning permission hereby granted does not extend any rights to carry out any works to the public sewerage or water supply systems without first having obtained the necessary permissions required by the Water industries Act 1991. Any alterations to existing premises resulting in the creation of additional premises or merging of existing premises must also be constructed so that each is separately connected to the Company’s water main and can be separately metered. Please contact our new connections team on 0800 917 2652 for further information on water and sewerage connections. The applicant may need to apply to Dwr Cymru / Welsh Water for any connection to the public sewer under S106 of the Water industry Act 1991. If the connection to the public sewer network is either via a lateral drain (i.e., a drain which extends beyond the connecting property boundary) or via a new sewer (i.e., serves more than one property), it is now a mandatory requirement to first enter into a Section 104 Adoption Agreement (Water Industry Act 1991). The design of the sewers and lateral drains must also conform to the Welsh Ministers Standards for Gravity Foul Sewers and Lateral Drains and conform with the publication "Sewers for Adoption"- 7th Edition. Further information can be obtained via the Developer Services pages of www.dwrcymru.com The applicant is also advised that some public sewers and lateral drains may not be recorded on our maps of public sewers because they were originally privately owned and were transferred into public ownership by nature of the Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011. The presence of such assets may affect the proposal. In order to assist us in dealing with the proposal the applicant may contact Dwr Cymru Welsh Water to establish the location and status of the apparatus. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times. In accordance with Planning Policy Wales (Edition 12) and Technical Advice Note 12 (Design), the applicant is advised to take a sustainable approach in considering water supply in new development proposals, including utilising approaches that improve water efficiency and reduce water consumption. We would recommend that the applicant liaises with the relevant Local Authority Building Control department to discuss their water efficiency requirements.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.