Conversion of existing office space into two no. flats (splitting one flat from previously approved application FUL/000066/26). Existing - timber windows and doors, red brickwork, slate roof. Proposed - double-glazed timber windows to match existing. Site area - 616 m2
23-25, Church Street, Flint, CH6 5AE
A decision notice has been issued in respect of this application.Reference: FUL/000427/26Flintshire County Council
Last published check: 2 Oct 2026, 05:29. Check the council record for more recent changes.
Application location
23-25, Church Street, Flint, CH6 5AE
This record has no verified map location.
Application summary
Status
A decision notice has been issued in respect of this application.
Application type
Full - Building Works
Received
14 May 2026
Validated
Not published
Determination deadline
2 Sept 2026
Local authority
Flintshire County Council
Application overview
Conversion of existing office space into two no. flats (splitting one flat from previously approved application FUL/000066/26). Existing - timber windows and doors, red brickwork, slate roof. Proposed - double-glazed timber windows to match existing. Site area - 616 m2
Proposal details
Reference
FUL/000427/26
Alternative references
PP-14935182
Ward
Flintshire Ward Flint Castle
Parish
Flintshire Community Flint Town Council
Agent
Adam Mokhtar
UPRN
100100932060
Sign in to view all collected council fields and recorded changes.
The development hereby approved shall be commenced before the expiration of five years from the date of this permission. REASON: To comply with the requirements of Sections 91 to 93 of the Town and Country Planning Act, 1990.
The development shall be carried out in accordance with the following approved plans and documents: Application Form received 08/07/2026 Location Plan received 08/07/2026 Proposed Site Plan DWG No. Dwg 1599-02-02-01 received 08/07/2026 Proposed Floor Plan DWG No. Dwg 1599-02-03-02 received 08/07/2026 Proposed Elevations DWG No. Dwg 1599-02-04-02 received 08/07/2026 Heritage Impact Statement received 08/07/2026 Green Infrastructure Statement received 08/07/2026 REASON: To ensure that the development is carried out in accordance with the approved details.
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system. REASON: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment and to comply with the requirements of Policies PC2 and EN15 of the Flintshire Local Development Plan
The applicant is advised that some public sewers and lateral drains may not be recorded on our maps; some sewers were originally privately owned and were transferred into public ownership by nature of the Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011. The presence of such assets may affect the proposal. In order to assist us in dealing with the proposal the applicant may contact Dwr Cymru Welsh Water. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times. The applicant may also need to apply to Dwr Cymru / Welsh Water for any connection to the public sewer under S106 of the Water industry Act 1991. If the connection to the public sewer network is either via a lateral drain (i.e. a drain which extends beyond the connecting property boundary) or via a new sewer (i.e. serves more than one property), it is now a mandatory requirement to first enter into a Section 104 Adoption Agreement (Water Industry Act 1991). The design of the sewers and lateral drains must also conform to the Welsh Ministers Standards for Gravity Foul Sewers and Lateral Drains, and conform with the publication "Sewers for Adoption"- 7th Edition. Further information can be obtained via the Developer Services pages of www.dwrcymru.com. As of 7th January 2019, this proposed development may be subject to Schedule 3 of the Flood and Water Management Act 2010. In the event this proposed development amounts to a total impermeable area of 100sqm or more, approval of Sustainable Drainage Systems (SuDS) features will be required in accordance with the 'Statutory standards for sustainable drainage systems – designing, constructing, operating and maintaining surface water drainage systems'. It would therefore be recommended that the developer engage in consultation with Flintshire County Council, as the determining SuDS Approval Body (SAB), in relation to their proposals for SuDS features. Please note, Dwr Cymru Welsh Water is a statutory consultee to the SAB application process and will provide comments to any SuDS proposals by response to SAB consultation. In accordance with Planning Policy Wales (Edition 12) and Technical Advice Note 12 (Design), the applicant is advised to take a sustainable approach in considering water supply in new development proposals, including utilising approaches that improve water efficiency and reduce water consumption. We would recommend that the applicant liaises with the relevant Local Authority Building Control department to discuss their water efficiency requirements.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.