The development hereby approved shall be commenced before the expiration of five years from the date of this permission. REASON: To comply with the requirements of Sections 91 to 93 of the Town and Country Planning Act, 1990.
The development shall be carried out in accordance with the following approved plans and documents: Application form Received 10/04/2026 Location Plan Received 10/04/2026 Existing Layout Plan Received 10/04/2026 Proposed Layout Plan Received 10/04/2026 Planning Supporting Statement Received 10/04/2026 Proposed Block Plan Received 10/04/2026 Proposed Cross Section Received 10/04/2026 Proposed Eastern Elevation Received 10/04/2026 Proposed Northern Elevation Received 10/04/2026 Proposed Southern Elevation Received 10/04/2026 Proposed Western Elevation Received 10/04/2026 SCAIL Report Received 24.04.2026 REASON: To ensure that the development is carried out in accordance with the approved details.
The applicant is advised that due to the proximity of the proposed works in relation to the adjoining adopted highway, Technical Approval must be obtained from the Highway Authority prior to commencement of any site works. This proposed structure will require a separate Approval in Principle (AIP) submission under the Highways Act to ensure that the structural design is acceptable to the Highway Authority. Once the full design has been completed and checked, a signed “Design Certificate" for the structure will be issued. Only then may the works proceed.
No development shall commence until details of a method statement and risk assessment for the protection of the structural condition of the water main adjoining the site has been submitted to and approved in writing by the Local Planning Authority. The approved protection measures shall be implemented in full before any other development hereby permitted has commenced, and shall be retained at all times for the duration of the approved operations including the restoration works. REASON: To ensure that the proposed development does not affect the integrity of the public water supply system in the interests of public health and safety.
No surface water and/or land drainage shall be allowed to connect directly or indirectly with the public sewerage network. REASON: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
The applicant is also advised that some public sewers and lateral drains may not be recorded on our maps of public sewers because they were originally privately owned and were transferred into public ownership by nature of the Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011. The presence of such assets may affect the proposal. In order to assist us in dealing with the proposal the applicant may contact Dwr Cymru Welsh Water. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times.
The applicant is reminded that the development which is the subject of this planning permission will also require Sustainable Drainage Systems (SuDS) for surface water in accordance with the requirements of Schedule 3 to the Flood and Water Management Act 2010. From 7th January 2019, SuDS on new developments must be designed and built in accordance with the Statutory SuDS Standards published by the Welsh Ministers and SuDS Schemes must be approved by the local authority acting in its SAB role, before construction work begins. Furthermore, SuDS features serving more than one property will be subject to adoption by the SAB. Further details can be found via the following website link: https://gweddill.gov.wales/docs/desh/publications/181015-suds-statutory-standards-en.pdf and https://www.flintshire.gov.uk/en/Resident/Planning/Sustainable-Drainage-Systems.aspx The Local Planning Authority would remind you that any changes made to the scheme as a consequence of obtaining SAB approval may require the submission of a further amended planning application.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.