Council planning record

Change of use for the sale of hot/cold oven baked goods (A3) including the installation of extraction flue and new business signage.

73, Chester Road West, Shotton, Deeside, CH5 1BZ

A decision notice has been issued in respect of this application.Reference: FUL/000147/26Flintshire County Council

Last published check: 1 Oct 2026, 17:02. Check the council record for more recent changes.

Application location

73, Chester Road West, Shotton, Deeside, CH5 1BZ

This record has no verified map location.

Application summary

Status
A decision notice has been issued in respect of this application.
Application type
Full - Building Works
Received
17 Feb 2026
Validated
Not published
Determination deadline
23 Apr 2026
Local authority
Flintshire County Council

Application overview

Change of use for the sale of hot/cold oven baked goods (A3) including the installation of extraction flue and new business signage.

Proposal details

Reference
FUL/000147/26
Alternative references
PP-14705452
Ward
Flintshire Ward Shotton West
Parish
Flintshire Community Shotton Town Council
Agent
Sags Ulhaq
UPRN
100100930427

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
Odour AssessmentReportNot publishedView
Sign Details - Dwg 2046.005VisualisationNot publishedView
Existing & Proposed Side Elevations - Dwg 2046.004ElevationNot publishedView
Existing & Proposed Side Elevations - Dwg 2046.003ElevationNot publishedView
Existing & Proposed Front & Rear Elevations - Dwg 2046.002ElevationNot publishedView
Existing & Proposed Ground Floor Plans - Dwg 2046.001PlanNot publishedView
Location & Block Plans - Dwg 06Location PlanNot publishedView
Extraction System Statement - RedactedStatement17 Feb 2026View
Planning StatementStatement27 Feb 2026View
Application Form - RedactedApplication Form3 Mar 2026View
Notice Article 10 - RedactedPaperwork3 Mar 2026View
ADD INFO 06.03.26 - Green Infrastructure StatementAdditional Information6 Mar 2026View
Officer's ReportDecision24 Apr 2026View
Decision NoticeDecision24 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

A01 Approved
Officer's Report Decision Notice
Planning conditions
  1. The development hereby approved shall be commenced before the expiration of five years from the date of this permission. REASON: To comply with the requirements of Sections 91 to 93 of the Town and Country Planning Act, 1990.
  2. The development shall be carried out in accordance with the following approved plans and documents: Application Form - Received 26.02.2026 Existing & Proposed Ground Floor Plans - Dwg 2046.001 - Received 26.02.2026 Existing & Proposed Front & Rear Elevations - Dwg 2046.002 - Received 26.02.2026 Existing & Proposed Side Elevations - Dwg 2046.003 - Received 26.02.2026 Existing & Proposed Side Elevations - Dwg 2046.004 - Received 26.02.2026 Sign Details - Dwg 2046.005 - Received 26.02.2026 Location & Block Plans - Dwg 06 - Received 26.02.2026 Extraction System Statement - Received 26.02.2026 Odour Assessment - Received 26.02.2026 Planning Statement - Received 26.02.2026 Green Infrastructure Statement - Received 06.03.2026 REASON: To ensure that the development is carried out in accordance with the approved details.
  3. No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system. REASON: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
  4. Advisory Notes The applicant may need to apply to Dwr Cymru / Welsh Water for any connection to the public sewer under S106 of the Water industry Act 1991. If the connection to the public sewer network is either via a lateral drain (i.e. a drain which extends beyond the connecting property boundary) or via a new sewer (i.e. serves more than one property), it is a mandatory requirement to first enter into a Section 104 Adoption Agreement (Water Industry Act 1991). The design of the sewers and lateral drains must also conform to the Welsh Ministers Standards for Gravity Foul Sewers and Lateral Drains, and conform with the publication "Sewers for Adoption"- 7th Edition. Further information can be obtained via the Developer Services pages of www.dwrcymru.com. The applicant is advised that some public sewers and lateral drains may not be recorded on our maps; some sewers were originally privately owned and were transferred into public ownership by nature of the Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011. The presence of such assets may affect the proposal. In order to assist us in dealing with the proposal the applicant may contact Dwr Cymru Welsh Water. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times. In accordance with Planning Policy Wales (Edition 12) and Technical Advice Note 12 (Design), the applicant is advised to take a sustainable approach in considering water supply in new development proposals, including utilising approaches that improve water efficiency and reduce water consumption. We would recommend that the applicant liaises with the relevant Local Authority Building Control department to discuss their water efficiency requirements. The applicant is advised to engage in consultation with Flintshire County Council , as the determining SuDS Approval Body (SAB), in relation to their proposals for SuDS features. Please note, Dwr Cymru Welsh Water is a statutory consultee to the SAB application process and will provide comments to any SuDS proposals by response to SAB consultation. Trade Effluent Consent: If the development will give rise to a new discharge (or alter an existing discharge) of trade effluent, directly or indirectly to the public sewerage system, then a Discharge Consent under Section 118 of the Water Industry Act 1991 is required from Dwr Cymru / Welsh Water. Please note that the issuing of a Discharge Consent is independent of the planning process and a consent may be refused although planning permission is granted.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.