Council planning record

Erection of 486 residential units and associated works within Pods 5, 6, 7, 8 and 9 of Phase 4 of the Halbeath Strategic Development Area (Application Ref: 17/01677/EIA). Approval of Matters Specified in Conditions 3 (Parts a, d, e, g, h, j, l - Development Components); 4 and 5 (Application Requirements); 10 (Development Brief); 12 (Energy Statement); 13 (Landscape and Habitat Management Plan); 14 (Public Art Strategy); and 51 (Temporary Haul Road).

Land At Halbeath North Of Fife Circle Rail Line Pleasance Road Halbeath Fife

DecidedReference: 25/01403/ARCFife

Last published check: 8 Oct 2026, 18:23. Check the council record for more recent changes.

Application location

Land At Halbeath North Of Fife Circle Rail Line Pleasance Road Halbeath Fife

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Approval Required by Condition(s)
Received
15 May 2025
Validated
5 Jun 2025
Determination deadline
Not published
Local authority
Fife

Application overview

Erection of 486 residential units and associated works within Pods 5, 6, 7, 8 and 9 of Phase 4 of the Halbeath Strategic Development Area (Application Ref: 17/01677/EIA). Approval of Matters Specified in Conditions 3 (Parts a, d, e, g, h, j, l - Development Components); 4 and 5 (Application Requirements); 10 (Development Brief); 12 (Energy Statement); 13 (Landscape and Habitat Management Plan); 14 (Public Art Strategy); and 51 (Temporary Haul Road).

Proposal details

Reference
25/01403/ARC
Alternative references
100709481-001
Ward
Dunfermline North
Agent
Geddes Consulting

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 503 of 503

DocumentPublishedAction
APPROVEDDecision · PDF6 Feb 2026View
Report of HandlingReport of Handling · PDF5 Feb 2026View
183C - PROPOSED LANDSCAPE GENERAL ARRANGEMENT PLANSApproved · PDF19 Dec 2025View
287C - DEVELOPMENT BRIEF 1 OF 2Approved · PDF19 Dec 2025View
287C - DEVELOPMENT BRIEF 2 OF 2Approved · PDF19 Dec 2025View
141C - POD 6: BOUNDARY ENCLOSURES LAYOUTApproved · PDF19 Dec 2025View
142C - POD 6: DEVELOPMENT LAYOUT POD 6Approved · PDF19 Dec 2025View
149B - POD 6: PROPOSED DRAINAGE LAYOUTApproved · PDF19 Dec 2025View
143C - POD 6: EV PROVISION LAYOUT POD 6 DRAWINGApproved · PDF19 Dec 2025View
144C - POD 6: EXTERNAL FINISHES LAYOUTApproved · PDF19 Dec 2025View
145B - POD 6: LEVELS LAYOUT 1 OF 2Approved · PDF19 Dec 2025View
146B - POD 6: LEVELS LAYOUT 2 OF 2Approved · PDF19 Dec 2025View
148B - POD 6: SPA REFUSE DRAWINGApproved · PDF19 Dec 2025View
150D - POD 7: BOUNDARY ENCLOSURES LAYOUTApproved · PDF19 Dec 2025View
151D - POD 7: DEVELOPMENT LAYOUTApproved · PDF19 Dec 2025View
158B - POD 7: PROPOSED DRAINAGE LAYOUTApproved · PDF19 Dec 2025View
152D - POD 7: EV PROVISION LAYOUTApproved · PDF19 Dec 2025View
153D - POD 7: EXTERNAL FINISHES LAYOUTApproved · PDF19 Dec 2025View
155B - POD 7: LEVELS LAYOUT 2 OF 2Approved · PDF19 Dec 2025View
154B - POD 7: LEVELS LAYOUT 1 OF 2Approved · PDF19 Dec 2025View
157B - POD 7: SPA REFUSE PLANApproved · PDF19 Dec 2025View
324A - PODS 5 AND 6: STORM SEWER DESIGN 1 IN 200 YEAR FLOOD EVENT CALCULATIONSApproved · PDF19 Dec 2025View
323A - PODS 5 AND 6: STORM SEWER DESIGN CALCULATIONSApproved · PDF19 Dec 2025View
176D - PODS 5-9: MASTERPLAN LAYOUTApproved · PDF19 Dec 2025View
326A - PODS 7 - 9: STORM SEWER DESIGN 1 IN 200 YEAR FLOOD EVENT CALCULATIONSApproved · PDF19 Dec 2025View
325A - PODS 7 - 9: STORM SEWER DESIGN CALCULATIONSApproved · PDF19 Dec 2025View
PSADApplication Form · PDF19 Dec 2025View
336 - STATEMENT: RESPONSE TO COUNCIL COMMENTS RECEIVED 11TH DECEMBER 2025Approved · PDF19 Dec 2025View
176C - SUPERSEDED PODS 5-9: MASTERPLAN LAYOUTAmended Drawing · PDF21 Nov 2025View
131C - POD 5: DEVELOPMENT LAYOUTApproved · PDF21 Nov 2025View
142B - SUPERSEDED POD 6: DEVELOPMENT LAYOUT POD 6Amended Drawing · PDF21 Nov 2025View
151C - SUPERSEDED POD 7: DEVELOPMENT LAYOUTAmended Drawing · PDF21 Nov 2025View
160B - POD 8: DEVELOPMENT LAYOUT PLANApproved · PDF21 Nov 2025View
168B - POD 9: DEVELOPMENT LAYOUT PLANApproved · PDF21 Nov 2025View
130C - POD 5: BOUNDARY ENCLOSURES LAYOUTApproved · PDF21 Nov 2025View
141B - SUPERSEDED POD 6: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF21 Nov 2025View
150C - SUPERSEDED POD 7: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF21 Nov 2025View
167B - POD 9: BOUNDARY ENCLOSURES LAYOUTApproved · PDF21 Nov 2025View
144B - SUPERSEDED POD 6: EXTERNAL FINISHES LAYOUTAmended Drawing · PDF21 Nov 2025View
153C - SUPERSEDED POD 7: EXTERNAL FINISHES LAYOUTAmended Drawing · PDF21 Nov 2025View
162B - POD 8: EXTERNAL FINISHES LAYOUTApproved · PDF21 Nov 2025View
170B - POD 9: EXTERNAL FINISHES LAYOUTApproved · PDF21 Nov 2025View
132C - POD 5: EV PROVISION LAYOUTApproved · PDF21 Nov 2025View
143B - SUPERSEDED POD 6: EV PROVISION LAYOUT POD 6 DRAWINGAmended Drawing · PDF21 Nov 2025View
152C - SUPERSEDED POD 7: EV PROVISION LAYOUTAmended Drawing · PDF21 Nov 2025View
161B - POD 8: EV PROVISION LAYOUTApproved · PDF21 Nov 2025View
169B - POD 9: EV PROVISION LAYOUTApproved · PDF21 Nov 2025View
183B - SUPERSEDED PROPOSED LANDSCAPE GENERAL ARRANGEMENT PLANSAmended Drawing · PDF21 Nov 2025View
335 - ACOUSTIC FENCE SECTIONS - PH 4Approved · PDF21 Nov 2025View
282A- NOISE ASSESSMENT POD 7Approved · PDF21 Nov 2025View
307A - FENCE TYPE M DETAILSApproved · PDF21 Nov 2025View
331 - FENCE TYPE TYPE Q - 1800MM FEATURE TRELLIS FENCEApproved · PDF21 Nov 2025View
332 - FENCE TYPE W - 2000MM FEATHER EDGE ACOUSTIC FENCEApproved · PDF21 Nov 2025View
333 - FENCE TYPE X - 2200MM FEATHER EDGE ACOUSTIC FENCEApproved · PDF21 Nov 2025View
334 - FENCE TYPE Y - 1800MM FEATHER EDGE ACOUSTIC FENCEApproved · PDF21 Nov 2025View
287B - SUPERSEDED DEVELOPMENT BRIEF 1 OF 2Other · PDF21 Nov 2025View
287B - SUPERSEDED DEVELOPMENT BRIEF 2 OF 2Other · PDF21 Nov 2025View
328 - STATEMENT PHASE 4Approved · PDF21 Nov 2025View
PSADApplication Form · PDF21 Nov 2025View
330 - STATEMENT - RESPONSE TO COUNCIL COMMENTS RECEIVED 18TH NOVEMBER 2025Approved · PDF21 Nov 2025View
SHEEPHOUSEWELLS AFFORDABLE HOUSING ACCOMMODATION SCHEDULEOther · PDF21 Nov 2025View
327 - MODELLING NOTEApproved · PDF7 Nov 2025View
PSADApplication Form · PDF7 Nov 2025View
PSADApplication Form · PDF4 Nov 2025View
183A - SUPERSEDED PROPOSED LANDSCAPE GENERAL ARRANGEMENT PLANSAmended Drawing · PDF4 Nov 2025View
321 - PROPOSED CULVERT DETAILSApproved · PDF3 Nov 2025View
188A - INFRASTRUCTURE: PROPOSED DRAINAGE ADOPTION SHEET 1 OF 3Approved · PDF3 Nov 2025View
189A - INFRASTRUCTURE: PROPOSED DRAINAGE ADOPTION SHEET 2 OF 3Approved · PDF3 Nov 2025View
190A - INFRASTRUCTURE: PROPOSED DRAINAGE ADOPTION SHEET 3 OF 3Approved · PDF3 Nov 2025View
192A - INFRASTRUCTURE: PROPOSED DRAINAGE LAYOUT SHEET 2 OF 3Approved · PDF3 Nov 2025View
193A - INFRASTRUCTURE: PROPOSED DRAINAGE LAYOUT SHEET 3 OF 3Approved · PDF3 Nov 2025View
194A - INFRASTRUCTURE: LEVELS LAYOUT SHEET 1 OF 2Approved · PDF3 Nov 2025View
195A - INFRASTRUCTURE: LEVELS LAYOUT SHEET 2 OF 2Approved · PDF3 Nov 2025View
322 - INFRASTRUCTURE: ROAD LAYOUT PLANApproved · PDF3 Nov 2025View
187A - INFRASTRUCTURE: SPA REFUSE VEHICLE PLANApproved · PDF3 Nov 2025View
140A - POD 5: PROPOSED DRAINAGE LAYOUTApproved · PDF3 Nov 2025View
135A - POD 5: LEVELS LAYOUT 1 OF 3Approved · PDF3 Nov 2025View
136A - POD 5: LEVELS LAYOUT 2 OF 3Approved · PDF3 Nov 2025View
137A - POD 5: LEVELS LAYOUT 3 OF 3Approved · PDF3 Nov 2025View
149A - SUPERSEDED POD 6: PROPOSED DRAINAGE LAYOUTAmended Drawing · PDF3 Nov 2025View
145A - SUPERSEDED POD 6: LEVELS LAYOUT 1 OF 2Amended Drawing · PDF3 Nov 2025View
146A - SUPERSEDED POD 6: LEVELS LAYOUT 2 OF 2Amended Drawing · PDF3 Nov 2025View
148A - SUPERSEDED POD 6: SPA REFUSE DRAWINGAmended Drawing · PDF3 Nov 2025View
158A - SUPERSEDED POD 7: PROPOSED DRAINAGE LAYOUTAmended Drawing · PDF3 Nov 2025View
154A - SUPERSEDED POD 7: LEVELS LAYOUT 1 OF 2Amended Drawing · PDF3 Nov 2025View
155B - POD 7: LEVELS LAYOUT 2 OF 2Approved · PDF3 Nov 2025View
157A - SUPERSEDED POD 7: SPA REFUSE PLANAmended Drawing · PDF3 Nov 2025View
166A - POD 8: PROPOSED DRAINAGE LAYOUTApproved · PDF3 Nov 2025View
163A - POD 8: LEVELS LAYOUTApproved · PDF3 Nov 2025View
165A - POD 8: SPA REFUSE PLANApproved · PDF3 Nov 2025View
175A - POD 9: PROPOSED DRAINAGE LAYOUTApproved · PDF3 Nov 2025View
171A - POD 9: LEVELS LAYOUT 1 OF 2Amended Drawing · PDF3 Nov 2025View
172A - POD 9: LEVELS LAYOUT 2 OF 2Approved · PDF3 Nov 2025View
174A - POD 9: SPA REFUSE PLANApproved · PDF3 Nov 2025View
324 - SUPERSEDED PODS 5 AND 6: STORM SEWER DESIGN 1 IN 200 YEAR FLOOD EVENT CALCOther · PDF3 Nov 2025View
323 - SUPERSEDED PODS 5 AND 6: STORM SEWER DESIGN CALCULATIONSOther · PDF3 Nov 2025View
326 - SUPERSEDED PODS 7 - 9: STORM SEWER DESIGN 1 IN 200 YEAR FLOOD EVENT CALCULOther · PDF3 Nov 2025View
325 - SUPERSEDED PODS 7 - 9: STORM SEWER DESIGN CALCULATIONSOther · PDF3 Nov 2025View
199A - POST DEVELOPMENT OVERLAND FLOW PLANAmended Drawing · PDF3 Nov 2025View
PSADApplication Form · PDF3 Nov 2025View
186A - INFASTRUCTURE: PROPOSED BUS STOP DETAILSApproved · PDF3 Nov 2025View
304A - DRAINAGE ASSESSMENT 2 OF 6Approved · PDF3 Nov 2025View
304A - DRAINAGE ASSESSMENT 1 OF 6Approved · PDF3 Nov 2025View
304A - DRAINAGE ASSESSMENT 3 OF 6Approved · PDF3 Nov 2025View
304A - DRAINAGE ASSESSMENT 4 OF 6Approved · PDF3 Nov 2025View
304A - DRAINAGE ASSESSMENT 5 OF 6Approved · PDF3 Nov 2025View
304A - DRAINAGE ASSESSMENT 6 OF 6Approved · PDF3 Nov 2025View
198A - PRE DEVELOPMENT OVERLAND FLOW PLANApproved · PDF3 Nov 2025View
305A - DRAINAGE ASSESSMENTApproved · PDF3 Nov 2025View
290A - FLOOD RISK ASSESSMENT APP 1Approved · PDF3 Nov 2025View
306A - APPENDIX 2 SUDS DESIGN INDEPENDENT CHECK CERTIFICATEApproved · PDF3 Nov 2025View
PSADApplication Form · PDF3 Nov 2025View
320 - MORLAND TK: ELEVATIONSApproved · PDF28 Oct 2025View
319 - MORLAND TK: FLOOR PLANSApproved · PDF28 Oct 2025View
130B - SUPERSEDED POD 5: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF28 Oct 2025View
131B - SUPERSEDED POD 5: DEVELOPMENT LAYOUTAmended Drawing · PDF28 Oct 2025View
132B - SUPERSEDED POD 5: EV PROVISION LAYOUTAmended Drawing · PDF28 Oct 2025View
133B - POD 5: EXTERNAL FINISHES LAYOUTApproved · PDF28 Oct 2025View
141A - SUPERSEDED POD 6: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF28 Oct 2025View
142A - SUPERSEDED POD 6: DEVELOPMENT LAYOUT POD 6Drawing · PDF28 Oct 2025View
143A - SUPERSEDED POD 6: EV PROVISION LAYOUT POD 6 DRAWINGAmended Drawing · PDF28 Oct 2025View
144A - SUPERSEDED POD 6: EXTERNAL FINISHES LAYOUTAmended Drawing · PDF28 Oct 2025View
150B - SUPERSEDED POD 7: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF28 Oct 2025View
151B - SUPERSEDED POD 7: DEVELOPMENT LAYOUTAmended Drawing · PDF28 Oct 2025View
152B - SUPERSEDED POD 7: EV PROVISION LAYOUTAmended Drawing · PDF28 Oct 2025View
153B - SUPERSEDED POD 7: EXTERNAL FINISHES LAYOUTAmended Drawing · PDF28 Oct 2025View
159A - POD 8: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF28 Oct 2025View
160A - SUPERSEDED POD 8: DEVELOPMENT LAYOUT PLANAmended Drawing · PDF28 Oct 2025View
161A - SUPERSEDED POD 8: EV PROVISION LAYOUTAmended Drawing · PDF28 Oct 2025View
162A - SUPERSEDED POD 8: EXTERNAL FINISHES LAYOUTAmended Drawing · PDF28 Oct 2025View
167A - SUPERSEDED POD 9: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF28 Oct 2025View
168A - SUPERSEDED POD 9: DEVELOPMENT LAYOUT PLANDrawing · PDF28 Oct 2025View
169A - SUPERSEDED POD 9: EV PROVISION LAYOUTAmended Drawing · PDF28 Oct 2025View
170A - SUPERSEDED POD 9: EXTERNAL FINISHES LAYOUTAmended Drawing · PDF28 Oct 2025View
176B - SUPERSEDED PODS 5-9: MASTERPLAN LAYOUTAmended Drawing · PDF28 Oct 2025View
PSADApplication Form · PDF28 Oct 2025View
PSADApplication Form · PDF1 Oct 2025View
287A - SUPERSEDED DEVELOPMENT BRIEF 2 OF 2Other · PDF1 Oct 2025View
287A - SUPERSEDED DEVELOPMENT BRIEF 1 OF 2Other · PDF1 Oct 2025View
316 - SUDS: APPENDIX 7Approved · PDF24 Sept 2025View
317 - SUDS: APPENDIX 8Approved · PDF24 Sept 2025View
PSADApplication Form · PDF24 Sept 2025View
318 - SEPA RESPONSE LETTER 2Approved · PDF24 Sept 2025View
289A - FLOOD RISK ASSESSMENTApproved · PDF24 Sept 2025View
314 - DRAIN 02 REALIGNMENTApproved · PDF18 Aug 2025View
313 - EXISTING DRAIN 02 LONGSECTIONApproved · PDF18 Aug 2025View
312 - OLD RAILWAY CUTTING INFILL PLANApproved · PDF18 Aug 2025View
PSADApplication Form · PDF18 Aug 2025View
315 - SEPA RESPONSE LETTERApproved · PDF18 Aug 2025View
130A - SUPERSEDED POD 5: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF14 Aug 2025View
131A - SUPERSEDED POD 5: DEVELOPMENT LAYOUTAmended Drawing · PDF14 Aug 2025View
132A - SUPERSEDED POD 5: EV PROVISION LAYOUTAmended Drawing · PDF14 Aug 2025View
133A - SUPERSEDED POD 5: EXTERNAL FINISHES LAYOUTAmended Drawing · PDF14 Aug 2025View
150A - SUPERSEDED POD 7: BOUNDARY ENCLOSURES LAYOUTAmended Drawing · PDF14 Aug 2025View
151A - SUPERSEDED POD 7: DEVELOPMENT LAYOUTAmended Drawing · PDF14 Aug 2025View
152A - SUPERSEDED POD 7: EV PROVISION LAYOUTAmended Drawing · PDF14 Aug 2025View
153A - SUPERSEDED POD 7: EXTERNAL FINISHES LAYOUTAmended Drawing · PDF14 Aug 2025View
176A - SUPERSEDED PODS 5-9: MASTERPLAN LAYOUTAmended Drawing · PDF14 Aug 2025View
177A - PODS 5-9 : OPEN SPACE LAYOUTApproved · PDF14 Aug 2025View
PSADApplication Form · PDF14 Aug 2025View
PSADApplication Form · PDF24 Jun 2025View
310 - SITE INVESTIGATIONS 1 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 10 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 11 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 12 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 13 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 14 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 15 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 16 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 2 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 3 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 4 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 5 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 6 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 7 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 8 OF 16Approved · PDF9 Jun 2025View
310 - SITE INVESTIGATIONS 9 OF 16Approved · PDF9 Jun 2025View
Case Detail and NN ListCase Detail and NN List · PDF6 Jun 2025View
306 - SUPERSEDED APPENDIX 2 SUDS DESIGN INDEPENDENT CHECK CERTIFICATEOther · PDF5 Jun 2025View
305 - SUPERSEDED DRAINAGE ASSESSMENTReport · PDF5 Jun 2025View
307 - SUPERSEDED FENCE TYPE M DETAILSDrawing · PDF5 Jun 2025View
308 - FENCE TYPE N DETAILSApproved · PDF5 Jun 2025View
309 - FENCE TYPE N1 DETAILSApproved · PDF5 Jun 2025View
PSADApplication Form · PDF5 Jun 2025View
LAND OWNERSHIP CERTIFICATEApplication Form · PDF5 Jun 2025View
279 - WOODLAND MANAGEMENT PLAN 4 OF 4Approved · PDF15 May 2025View
277 - DOUBLE GARAGE FLOOR PLAN AND ELEVATIONSApproved · PDF15 May 2025View
276 - SINGLE GARAGE FLOOR PLAN AND ELEVATIONSApproved · PDF15 May 2025View
280 - AFFORDABLE HOUSING STATEMENTOther · PDF15 May 2025View
281 - AIR QUALITY ASSESSMENTApproved · PDF15 May 2025View
282 - NOISE ASSESSMENTReport · PDF15 May 2025View
283 - PUBLIC ART STRATEGYApproved · PDF15 May 2025View
288 - LANDSCAPE HABITAT MANAGEMENT PLAN 1 OF 2Approved · PDF15 May 2025View
285 - SUSTAINABILITY STATEMENTApproved · PDF15 May 2025View
286 - SCHEDULE OF RESPONSES TO PPP PLANNING CONDITIONSApproved · PDF15 May 2025View
287 - SUPERSEDED DEVELOPMENT BRIEF 1 OF 2Other · PDF15 May 2025View
287 - SUPERSEDED DEVELOPMENT BRIEF 2 OF 2Other · PDF15 May 2025View
284 - ENERGY STATEMENTApproved · PDF15 May 2025View
289 - SUPERSEDED FLOOD RISK ASSESSMENTOther · PDF15 May 2025View
291 - FLOOD RISK ASSESSMENT APP 3Approved · PDF15 May 2025View
292 - FLOOD RISK ASSESSMENT APP 4Approved · PDF15 May 2025View
290 - SUPERSEDED FLOOD RISK ASSESSMENT APP 1Other · PDF15 May 2025View
299 - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANApproved · PDF15 May 2025View
300 - CONSTRUCTION TRAFFIC MANAGEMENT PLANApproved · PDF15 May 2025View
296 - SOIL BUND LOCATION PLANApproved · PDF15 May 2025View
301 - ARBORICULTURE IMPACT ASSESSMENT 1 OF 3Approved · PDF15 May 2025View
297 - TRANSPORT ASSESSMENT 1 OF 2Approved · PDF15 May 2025View
297 - TRANSPORT ASSESSMENT 2 OF 2Approved · PDF15 May 2025View
298 - NPF 4 COMPLIANCE MATRIXApproved · PDF15 May 2025View
295 - SUDS POND MAINTENANCE REGIMEApproved · PDF15 May 2025View
294 - FLOOD RISK ASSESSMENT APP 8Approved · PDF15 May 2025View
293 - FLOOD RISK ASSESSMENT APP 5Approved · PDF15 May 2025View
302 - INTERIM SITE INVESTIGATION REPORTApproved · PDF15 May 2025View
303 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM 1 OF 2Approved · PDF15 May 2025View
303 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM 2 OF 2Approved · PDF15 May 2025View
PSADApplication Form · PDF15 May 2025View
301 - ARBORICULTURE IMPACT ASSESSMENT 2 OF 3Approved · PDF15 May 2025View
288 - LANDSCAPE HABITAT MANAGEMENT PLAN 2 OF 2Approved · PDF15 May 2025View
301 - ARBORICULTURE IMPACT ASSESSMENT 3 OF 3Approved · PDF15 May 2025View
304 - SUPERSEDED DRAINAGE ASSESSMENT 1 OF 6Other · PDF15 May 2025View
304 - SUPERSEDED DRAINAGE ASSESSMENT 2 OF 6Other · PDF15 May 2025View
304 - SUPERSEDED DRAINAGE ASSESSMENT 3 OF 6Other · PDF15 May 2025View
304 - SUPERSEDED DRAINAGE ASSESSMENT 4 OF 6Other · PDF15 May 2025View
304 - SUPERSEDED DRAINAGE ASSESSMENT 5 OF 6Other · PDF15 May 2025View
304 - SUPERSEDED DRAINAGE ASSESSMENT 6 OF 6Other · PDF15 May 2025View
003 - ALDER: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
004 - ALDER: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
005 - ALDER: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 3Approved · PDF15 May 2025View
002 - ALDER: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
007 - ALDER: HANDED PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
008 - ALDER: HANDED PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
009 - ALDER :HANDED PROPOSED FRONT, REAR, AND SIDE ELEAVTIONS 3Approved · PDF15 May 2025View
006 - ALDER: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
012 - ALDER: MID PROPOSED FRONT, AND REAR ELEVATIONS 1Approved · PDF15 May 2025View
010 - ALDER: MID PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
013 - ALDER: MID PROPOSED FRONT, AND REAR ELEVATION 2Approved · PDF15 May 2025View
011 - ALDER: MID PROPOSED GROUND AND FIRST FLOOR LAYOUT PLANSApproved · PDF15 May 2025View
015 - AMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
014 - AMBLEFORD: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
018 - AMBLEFORD: HANDED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
019 - AMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
020 - AMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
021 - AMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 3Approved · PDF15 May 2025View
016 - AMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
017 - AMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 3Approved · PDF15 May 2025View
200 - APPENDIX 1: ARBORICULTURAL IMPACT ASSESSMENTApproved · PDF15 May 2025View
026 - AVON: HANDED PROPOSED FLOOR PLANApproved · PDF15 May 2025View
022 - AVON: PROPOSED FLOOR PLANApproved · PDF15 May 2025View
027 - AVON: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
028 - AVON: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
036 - AVONSFORD: HANDED MID PROPOSED FRONT, AND REAR ELEVATIONS 2Approved · PDF15 May 2025View
037 - AVONSFORD: HANDED MID PROPOSED FRONT, AND REAR ELEVATIONSApproved · PDF15 May 2025View
032 - AVONSFORD: MID PROPOSED FRONT, AND REAR ELEVATIONS 2Approved · PDF15 May 2025View
035 - AVONSFORD: HANDED MID PROPOSED FRONT, AND REAR ELEVATIONSApproved · PDF15 May 2025View
031 - AVONSFORD: MID FRONT, AND REAR ELEVATIONSApproved · PDF15 May 2025View
033 - AVONSFORD MID PROPOSED FRONT, AND REAR ELEVATIONSApproved · PDF15 May 2025View
030 - AVONSFORD: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
034 - AVONSFORD: HANDED MID PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
041 - AYLEFORD: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
040 - AYLEFORD: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
043 - AYLEFORD: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
038 - AYLEFORD: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
042 - AYLEFORD: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
039 - AYLEFORD: PROPOSED ELEVATIONSApproved · PDF15 May 2025View
130 - SUPERSEDED POD 5: BOUNDARY ENCLOSURES LAYOUTDrawing · PDF15 May 2025View
141 - SUPERSEDED POD 6: BOUNDARY ENCLOSURES LAYOUTDrawing · PDF15 May 2025View
150 - SUPERSEDED POD 7: BOUNDARY ENCLOSURES LAYOUTDrawing · PDF15 May 2025View
159 - SUPERSEDED POD 8: BOUNDARY ENCLOSURES LAYOUTDrawing · PDF15 May 2025View
167 - SUPERSEDED POD 9: BOUNDARY ENCLOSURES LAYOUTDrawing · PDF15 May 2025View
052 - BRAMBLEFORD: HANDED PROPOSED FRONT,AND REAR ELEVATIONSApproved · PDF15 May 2025View
053 - BRAMBLEFORD: HANDED PROPOSED FRONT, REAR, AND SIDE ELEVATIONSApproved · PDF15 May 2025View
054 - BRAMBLEFORD: HANDED PROPOSED FRONT, REAR, AND SIDE ELEVATIONSApproved · PDF15 May 2025View
045 - BRAMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
044 - BRAMBLEFORD: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
051 - BRAMBLEFORD: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
055 - BRAMBLEFORD: HANDED MID PROPOSED FRONT, AND REAR ELEVATIONS 1Approved · PDF15 May 2025View
056 - BRAMBLEFORD: HANDED MID PROPOSED FRONT, AND REAR ELEVATIONS 2Approved · PDF15 May 2025View
057 - BRAMBLEFORD: HANDED MID PROPOSED FRONT, AND REAR ELEVATIONS 3Approved · PDF15 May 2025View
048 - BRAMBLEFORD: PROPOSED FRONT, AND REAR ELEVATIONS 1Approved · PDF15 May 2025View
049 - BRAMBLEFORD: PROPOSED FRONT, AND REAR ELEVATIONS 2Approved · PDF15 May 2025View
050 - BRAMBLEFORD: PROPOSED FRONT, AND REAR ELEVATIONS 3Approved · PDF15 May 2025View
046 - BRAMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
047 - BRAMBLEFORD: PROPOSED FRONT, REAR, AND SIDE ELEVATIONS 3Approved · PDF15 May 2025View
059 - BUCHANAN: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
058 - BUCHANAN: PROPOSED GROUND, AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
061 - BUCHANAN: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
062 - BUCHANAN: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
060 - BUCHANAN: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
063 - BUCHANAN: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
065 - CAMERON: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
064 - CAMERON: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
066 - CAMERON: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
069 - CAMERON: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
068 - CAMERON: HANDED PROPOSED ELEAVTIONS 1Approved · PDF15 May 2025View
067 - CAMERON: HANDED PROPOSED GROUND AND FIRST FLOOR PLANApproved · PDF15 May 2025View
131 - SUPERSEDED POD 5: DEVELOPMENT LAYOUTDrawing · PDF15 May 2025View
142 - SUPERSEDED POD 6: DEVELOPMENT LAYOUT POD 6Drawing · PDF15 May 2025View
151 - SUPERSEDED POD 7: DEVELOPMENT LAYOUTDrawing · PDF15 May 2025View
160 - SUPERSEDED POD 8: DEVELOPMENT LAYOUT PLANDrawing · PDF15 May 2025View
168 - SUPERSEDED POD 9: DEVELOPMENT LAYOUT PLANDrawing · PDF15 May 2025View
088 - DUNLOP: HANDED PROPOSED FLOOR PLANSApproved · PDF15 May 2025View
087 - DUNLOP: PROPOSED ELEVATIONSApproved · PDF15 May 2025View
086 - DUNLOP: PROPOSED FLOOR PLANSApproved · PDF15 May 2025View
089 - DUNLOP: HANDED PROPOSED ELEVATIONSApproved · PDF15 May 2025View
132 - SUPERSEDED POD 5: EV PROVISION LAYOUTDrawing · PDF15 May 2025View
143 - SUPERSEDED POD 6: EV PROVISION LAYOUT POD 6 DRAWINGDrawing · PDF15 May 2025View
152 - SUPERSEDED POD 7: EV PROVISION LAYOUTDrawing · PDF15 May 2025View
161 - SUPERSEDED POD 8: EV PROVISION LAYOUTDrawing · PDF15 May 2025View
169 - SUPERSEDED POD 9: EV PROVISION LAYOUTDrawing · PDF15 May 2025View
133 - SUPERSEDED POD 5: EXTERNAL FINISHES LAYOUTDrawing · PDF15 May 2025View
144 - POD 6: EXTERNAL FINISHES LAYOUTDrawing · PDF15 May 2025View
153 - SUPERSEDED POD 7: EXTERNAL FINISHES LAYOUTDrawing · PDF15 May 2025View
162 - SUPERSEDED POD 8: EXTERNAL FINISHES LAYOUTDrawing · PDF15 May 2025View
170 - SUPERSEDED POD 9: EXTERNAL FINISHES LAYOUTDrawing · PDF15 May 2025View
178 - PROPOSED FENCE TYPE DETAILSApproved · PDF15 May 2025View
179 - PROPOSED FENCE TYPE B DETAILSApproved · PDF15 May 2025View
180 - PROPOSED FENCE TYPE P DETAILSApproved · PDF15 May 2025View
071 - FORBES: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
072 - FORBES: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
070 - FORBES: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
074 - FORBES: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
075 - FORBES: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
073 - FORBES: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
077 - GORDON: PROPOSED ELEVATIONSApproved · PDF15 May 2025View
076 - GORDON: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
079 - GORDON: HANDED PROPOSED ELEVATIONSApproved · PDF15 May 2025View
078 - GORDON: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
184 - PROPOSED HAUL ROAD LAYOUTApproved · PDF15 May 2025View
197 - INFRASTRUCTURE: PROPOSED FOUL STRATEGY PLANApproved · PDF15 May 2025View
188 - SUPERSEDED INFRASTRUCTURE: PROPOSED DRAINAGE ADOPTION SHEET 1 OF 3Drawing · PDF15 May 2025View
189 - SUPERSEDED INFRASTRUCTURE: PROPOSED DRAINAGE ADOPTION SHEET 2 OF 3Drawing · PDF15 May 2025View
190 - SUPERSEDED INFRASTRUCTURE: PROPOSED DRAINAGE ADOPTION SHEET 3 OF 3Drawing · PDF15 May 2025View
191 - SUPERSEDED INFRASTRUCTURE: PROPOSED DRAINAGE LAYOUT SHEET 1 OF 3Drawing · PDF15 May 2025View
192 - SUPERSEDED INFRASTRUCTURE: PROPOSED DRAINAGE LAYOUT SHEET 2 OF 3Drawing · PDF15 May 2025View
193 - SUPERSEDED INFRASTRUCTURE: PROPOSED DRAINAGE LAYOUT SHEET 3 OF 3Drawing · PDF15 May 2025View
194 - SUPERSEDED INFRASTRUCTURE: LEVELS LAYOUT SHEET 1 OF 2Drawing · PDF15 May 2025View
195 - SUPERSEDED INFRASTRUCTURE: LEVELS LAYOUT SHEET 2 OF 2Drawing · PDF15 May 2025View
187 - SUPERSEDED INFRASTRUCTURE: SPA REFUSE VEHICLE PLANOther · PDF15 May 2025View
185 - INFRASTRUCTURE: PROPOSED ROAD SECTIONSApproved · PDF15 May 2025View
196 - INFRASTRUCTURE: PROPOSED SURFACE WATER STRATEGYApproved · PDF15 May 2025View
081 - KENNEDY: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
082 - KENNEDY: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
080 - KENNEDY: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
084 - KENNEDY: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
085 - KENNEDY: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
083 - KENNEDY: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
091 - KILBRECK: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
097 - KILBRECK: HANDED PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
092 - KILBRECK: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
093 - KILBRECK: PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
090 - KILBRECK: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
096 - KILBRECK: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
095 - KILBRECK: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
094 - KILBRECK: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
183 - SUPERSEDED PROPOSED LANDSCAPE GENERAL ARRANGEMENT PLANSDrawing · PDF15 May 2025View
001 - LOCATION PLANApproved · PDF15 May 2025View
099 - LOMOND: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
100 - LOMOND: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
101 - LOMOND: PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
103 - LOMOND: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
104 - LOMOND: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
105 - LOMOND: HANDED PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
098 - LOMOND: PROPOSED FLOOR PLANApproved · PDF15 May 2025View
102 - LOMOND: HANDED PROPOSED FLOOR PLANApproved · PDF15 May 2025View
Application FormApplication Form · PDF15 May 2025View
140 - SUPERSEDED POD 5: PROPOSED DRAINAGE LAYOUTDrawing · PDF15 May 2025View
135 - SUPERSEDED POD 5: LEVELS LAYOUT 1 OF 3Drawing · PDF15 May 2025View
136 - SUPERSEDED POD 5: LEVELS LAYOUT 2 OF 3Drawing · PDF15 May 2025View
137 - SUPERSEDED POD 5: LEVELS LAYOUT 3 OF 3Drawing · PDF15 May 2025View
138 - POD 5: PROPOSED ROAD SECTIONS 1 OF 2Approved · PDF15 May 2025View
139 - POD 5: PROPOSED ROAD SECTIONS 2 OF 2Approved · PDF15 May 2025View
134 - SUPERSEDED POD 5: SPA REFUSE DRAWINGDrawing · PDF15 May 2025View
149 - SUPERSEDED POD 6: PROPOSED DRAINAGE LAYOUTDrawing · PDF15 May 2025View
145 - SUPERSEDED POD 6: LEVELS LAYOUT 1 OF 2Drawing · PDF15 May 2025View
146 - SUPERSEDED POD 6: LEVELS LAYOUT 2 OF 2Drawing · PDF15 May 2025View
154 - SUPERSEDED POD 7: LEVELS LAYOUT 1 OF 2Drawing · PDF15 May 2025View
147 - POD 6: ROAD SECTIONS DRAWINGDrawing · PDF15 May 2025View
158 - SUPERSEDED POD 7: PROPOSED DRAINAGE LAYOUTDrawing · PDF15 May 2025View
148 - SUPERSEDED POD 6: SPA REFUSE DRAWINGDrawing · PDF15 May 2025View
155 - SUPERSEDED POD 7: LEVELS LAYOUT 2 OF 2Drawing · PDF15 May 2025View
156 - POD 7: PROPOSED ROAD SECTIONSApproved · PDF15 May 2025View
157 - SUPERSEDED POD 7: SPA REFUSE PLANDrawing · PDF15 May 2025View
166 - SUPERSEDED POD 8: PROPOSED DRAINAGE LAYOUTDrawing · PDF15 May 2025View
163 - SUPERSEDED POD 8: LEVELS LAYOUTDrawing · PDF15 May 2025View
164 - POD 8: PROPOSED ROAD SECTIONSDrawing · PDF15 May 2025View
165 - SUPERSEDED POD 8: SPA REFUSE PLANDrawing · PDF15 May 2025View
175 - SUPERSEDED POD 9: PROPOSED DRAINAGE LAYOUTDrawing · PDF15 May 2025View
171 - SUPERSEDED POD 9: LEVELS LAYOUT 1 OF 2Drawing · PDF15 May 2025View
172 - SUPERSEDED POD 9: LEVELS LAYOUT 2 OF 2Drawing · PDF15 May 2025View
173 - POD 9: PROPOSED ROAD SECTIONSApproved · PDF15 May 2025View
174 - SUPERSEDED POD 9: SPA REFUSE PLANDrawing · PDF15 May 2025View
176 - SUPERSEDED PODS 5-9: MASTERPLAN LAYOUTDrawing · PDF15 May 2025View
177 - PODS 5-9 : OPEN SPACE LAYOUTDrawing · PDF15 May 2025View
199 - SUPERSEDED POST DEVELOPMENT OVERLAND FLOW PLANDrawing · PDF15 May 2025View
198 - SUPERSEDED PRE DEVELOPMENT OVERLAND FLOW PLANDrawing · PDF15 May 2025View
186 - SUPERSEDED INFASTRUCTURE: PROPOSED BUS STOP DETAILSDrawing · PDF15 May 2025View
113 - RAYNFORD: HANDED PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
107 - RAYNFORD: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
106 - RAYNFORD: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
110 - RAYNFORD: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
111 - RAYNFORD: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
112 - RAYNFORD: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
108 - RAYNFORD: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
109 - RAYNFORD: PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
119 - SHILFORD: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
120 - SHILFORD: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
115 - SHILFORD: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
114 - SHILFORD: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
118 - SHILFORD: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
121 - SHILFORD: HANDED PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
116 - SHILFORD: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
117 - SHILFORD: PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
126 - TETFORD: HANDED PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
129 - TETFORD: HANDED PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
125 - TETFORD: PROPOSED ELEVATIONS 3Approved · PDF15 May 2025View
122 - TETFORD: PROPOSED GROUND AND FIRST FLOOR PLANSApproved · PDF15 May 2025View
127 - TETFORD: HANDED PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
128 - TETFORD: HANDED PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
123 - TETFORD: PROPOSED ELEVATIONS 1Approved · PDF15 May 2025View
124 - TETFORD: PROPOSED ELEVATIONS 2Approved · PDF15 May 2025View
181 - PROPOSED WALL TYPE D DETAILSApproved · PDF15 May 2025View
182 - PROPOSED WALL TYPE Q DETAILSApproved · PDF15 May 2025View
201 - AYNESDALE: PROPOSED GROUND AND FIRST FLOOR PLANS 1Approved · PDF15 May 2025View
202 - AYNESDALE: PROPOSED GROUND AND FIRST FLOOR PLANS 2Approved · PDF15 May 2025View
203 - AYNESDALE: PROPOSED MASONRY FRONT AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
204 - AYNESDALE: PROPOSED RENDER FRONT AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
205 - AYNESDALE: PROPOSED RENDER FRONT AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
206 - AYNESDALE: PROPOSED STONE FRONT AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
207 - AYNESDALE: PROPOSED STONE FRONT AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
208 - CHALHAM: PROPOSED GROUND AND FIRST FLOOR PLAN 1Approved · PDF15 May 2025View
209 - CHALHAM: PROPOSED GROUND AND FIRST FLOOR PLAN 2Approved · PDF15 May 2025View
210 - CHALHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
211 - CHALHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
212 - CHALHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
213 - CHALHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
214 - CHALHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
215 - CHALHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
216 - CORKHAM: PROPOSED GROUND AND FIRST FLOOR PLANS 1Approved · PDF15 May 2025View
217 - CORKHAM: PROPOSED GROUND AND FIRST FLOOR PLANS 2Approved · PDF15 May 2025View
218 - CORKHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
219 - CORKHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
220 - CORKHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
221 - CORKHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
222 - CORKHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
223 - CORKHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
224 - ELTERHAM: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 1Approved · PDF15 May 2025View
225 - ELTERHAM: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 2Approved · PDF15 May 2025View
226 - ELTERHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
227 - ELTERHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
228 - ELTERHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
229 - ELTERHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
230 - ELTERHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
231 - ELTERHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
232 - COTTAGE FLAT: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 1Approved · PDF15 May 2025View
233 - COTTAGE FLAT: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 2Approved · PDF15 May 2025View
234 - COTTAGE FLAT: PROPOSED FRONT, REAR AND SIDE ELEVATIONSApproved · PDF15 May 2025View
235 - HUBHAM: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 1Approved · PDF15 May 2025View
236 - HUBHAM: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 2Approved · PDF15 May 2025View
237 - HUBHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
238 - HUBHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
239 - HUBHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
240 - HUBHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
241 - HUBHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
242 - HUBHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
243 - KITHAM: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 1Drawing · PDF15 May 2025View
244 - KITHAM: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 2Approved · PDF15 May 2025View
245 - KITHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
246 - KITHAM: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
247 - KITHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
248 - KITHAM: PROPOSED RENDER FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
249 - KITHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
250 - KITHAM: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
251 - PLUMDALE: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 1Approved · PDF15 May 2025View
252 - PLUMDALE: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 2Approved · PDF15 May 2025View
253 - PLUMDALE: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
254 - PLUMDALE: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
255 - PLUMDALE: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
256 - PLUMDALE: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
257 - TRELTON END: PROPOSED GROUND, FIRST AND SECOND FLOOR PLANS 1Approved · PDF15 May 2025View
259 - TRELTON END: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
260 - TRELTON END: PROPOSED MASONRY FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
261 - TRELTON END: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
262 - TRELTON END: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
258 - TRELTON END: PROPOSED GROUND, FIRST AND SECOND FLOOR PLANS 2Approved · PDF15 May 2025View
263 - TRELTON MID: PROPOSED GROUND, FIRST AND SECOND FLOOR PLANSApproved · PDF15 May 2025View
264 - TRELTON MID: PROPOSED MASONRY FRONT AND REAR ELEVATIONS 1Approved · PDF15 May 2025View
265 - TRELTON MID: PROPOSED MASONRY FRONT AND REAR ELEVATIONS 2Approved · PDF15 May 2025View
266 - TRELTON MID: PROPOSED STONE FRONT AND REAR ELEVATIONS 1Approved · PDF15 May 2025View
267 - TRELTON MID: PROPOSED STONE FRONT AND REAR ELEVATIONS 2Approved · PDF15 May 2025View
268 - VANE: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 1Approved · PDF15 May 2025View
269 - VANE: PROPOSED GROUND FLOOR AND FIRST FLOOR PLANS 2Approved · PDF15 May 2025View
270 - VANE: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
271 - VANE: PROPOSED STONE FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
272 - VANE: PROPOSED BRICK FRONT, REAR AND SIDE ELEVATIONS 1Approved · PDF15 May 2025View
273 - VANE: PROPOSED BRICK FRONT, REAR AND SIDE ELEVATIONS 2Approved · PDF15 May 2025View
274 - VANE: PROPOSED BRICK FRONT, REAR AND SIDE ELEVATIONS 3Approved · PDF15 May 2025View
275 - VANE: PROPOSED BRICK FRONT, REAR AND SIDE ELEVATIONS 4Approved · PDF15 May 2025View
278 - DESIGN AND ACCESS STATEMENT 1 OF 3Approved · PDF15 May 2025View
278 - DESIGN AND ACCESS STATEMENT 2 OF 3Approved · PDF15 May 2025View
278 - DESIGN AND ACCESS STATEMENT 3 OF 3Approved · PDF15 May 2025View
279 - WOODLAND MANAGEMENT PLAN 1 OF 4Approved · PDF15 May 2025View
279 - WOODLAND MANAGEMENT PLAN 2 OF 4Approved · PDF15 May 2025View
279 - WOODLAND MANAGEMENT PLAN 3 OF 4Approved · PDF15 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Application Permitted with Conditions
APPROVED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.