Council planning record

Compliance with Condition 8 of Planning Permission 19/03503/ARC -BEFORE ANY WORKS START ON SITE, the developer shall implement the tree protection measures outlined within the Arboricultural Method Statement by Acorna Ecology Ltd., dated June 2020, necessary to safeguard the trees on the site during development operations. The Planning Authority shall be formally notified in writing of the completion of such measures and no work on site shall commence until the Planning Authority has confirmed in writing that the measures as implemented are acceptable. The protective measures shall be retained in a sound and upright condition throughout the demolition/development operations and no building materials, soil or machinery shall be stored in or adjacent to the protected area, including the operation of machinery. As part of the measures, the developer shall appoint an arborist and details of the arboricultural supervision of the site shall be submitted with the above details, for prior written approval

Land To South Of Sappi Road Glenrothes Fife

DecidedReference: 19/03503/CND008Fife

Application location

Land To South Of Sappi Road Glenrothes Fife

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Condition Compliance
Received
27 May 2022
Validated
1 Jul 2026
Determination deadline
Not published
Local authority
Fife

Application overview

Compliance with Condition 8 of Planning Permission 19/03503/ARC -BEFORE ANY WORKS START ON SITE, the developer shall implement the tree protection measures outlined within the Arboricultural Method Statement by Acorna Ecology Ltd., dated June 2020, necessary to safeguard the trees on the site during development operations. The Planning Authority shall be formally notified in writing of the completion of such measures and no work on site shall commence until the Planning Authority has confirmed in writing that the measures as implemented are acceptable. The protective measures shall be retained in a sound and upright condition throughout the demolition/development operations and no building materials, soil or machinery shall be stored in or adjacent to the protected area, including the operation of machinery. As part of the measures, the developer shall appoint an arborist and details of the arboricultural supervision of the site shall be submitted with the above details, for prior written approval

Proposal details

Reference
19/03503/CND008
Alternative references
Email Submission
Ward
Glenrothes North, Leslie And Markinch
Agent
Persimmon Homes

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
Approved Condition ComplianceApproved Condition Compliance · PDF15 Jul 2026View
PSADApplication Form · PDF22 Jun 2026View
02 - TREE PROTECTION PLANDrawing · PDF22 Jun 2026View
Invalid LetterInvalid Letter · PDF9 Jun 2022View
Application FormApplication Form · PDF27 May 2022View
01 - LANDSCAPE LAYOUTCondition Compliance · PDF27 May 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Application Permitted - no conditions

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.