Council planning record

Details reserved by Condition 3 (Materials - in respect of lodges only), 5 (Access), 8 (Surface Water Drainage), 9 (Surface Water Run-Off), 11 (Lodge Positions), 12 (Ecology Survey), 13 (CEMP), 14 (Ecology Design) and 16 (Soft Landscaping) of planning permission F/YR24/0818/VOC (Variation of condition 6 (access) of planning permission F/YR21/0145/F (Erect 67 x holiday lodges, a toilet block, a reception building with associated parking and landscaping, and extensions to existing garden centre building and car park) - continue to use both access points)

Skylark Garden Centre And Country Store Manea Road Wimblington March Cambridgeshire PE15 0PE

ApprovedReference: F/YR25/3077/CONDFenland District Council

Last published check: 12 Oct 2026, 19:38. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Discharge of condition
Received
30 Jun 2025
Validated
3 Jul 2025
Determination deadline
28 Aug 2025
Local authority
Fenland District Council

Application overview

Details reserved by Condition 3 (Materials - in respect of lodges only), 5 (Access), 8 (Surface Water Drainage), 9 (Surface Water Run-Off), 11 (Lodge Positions), 12 (Ecology Survey), 13 (CEMP), 14 (Ecology Design) and 16 (Soft Landscaping) of planning permission F/YR24/0818/VOC (Variation of condition 6 (access) of planning permission F/YR21/0145/F (Erect 67 x holiday lodges, a toilet block, a reception building with associated parking and landscaping, and extensions to existing garden centre building and car park) - continue to use both access points)

Proposal details

Reference
F/YR25/3077/COND
Alternative references
PP-14101567
Ward
Doddington And Wimblington
Parish
Wimblington Parish Council
Agent
Avison Young

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Skylark Garden Centre And Country Store Manea Road Wimblington March Cambridgeshire PE15 0PE

This record has no verified map location.

View council map

Documents 118 of 118

DocumentPublishedAction
Decision NoticeDecision Notice · PDF23 Dec 2025View
EMAIL FROM AGENT CONFIRMING CLADDING MIXCorrespondence · PDF19 Dec 2025View
AGREEMENT TO EOT - 31/12/25Agreement to extension of time · PDF19 Dec 2025View
FDC ECOLOGY OFFICERConsultee Comment · PDF18 Dec 2025View
EMAIL TO AGENT WITH QUERIESCorrespondence · PDF15 Dec 2025View
LANDSCAPE PHASING PLANDrawing · PDF15 Dec 2025View
EMAIL FROM AGENT WITH REVISED DETAILSCorrespondence · PDF15 Dec 2025View
ECOLOGY COMMENTSConsultee Comment · PDF4 Dec 2025View
CCC HIGHWAYS TEAMConsultee Comment · PDF3 Dec 2025View
COND 5 - SCHEDULE OF DETAILSOther · PDF27 Nov 2025View
COND 3 - SCHEDULE OF MATERIALSOther · PDF27 Nov 2025View
EMAIL FROM AGENT WITH REVISED SCHEDULESCorrespondence · PDF27 Nov 2025View
Reconsultation SheetReconsultation Sheet · PDF26 Nov 2025View
CONSULTANT TREE OFFICERConsultee Comment · PDF23 Nov 2025View
CCC LEAD LOCAL FLOOD AUTHORITYConsultee Comment · PDF14 Nov 2025View
AGREEMENT TO EOT - 5/12/25Agreement to extension of time · PDF14 Nov 2025View
CANEXEL CLADDING BROCHUREOther · PDF13 Nov 2025View
COND 3 - BALUSTRADE AND GLASS OPTIONSOther · PDF13 Nov 2025View
EMAIL FROM AGENT CONFIRMING MATERIALS COLOURCorrespondence · PDF13 Nov 2025View
COND 5 - LIGHTING PLANDrawing · PDF13 Nov 2025View
COND 5 -LIGHTING PLAN - SHEET 1Drawing · PDF13 Nov 2025View
COND 5 -LIGHTING PLAN - SHEET 2Drawing · PDF13 Nov 2025View
COND 5 -ACCESS AND PARKING MATERIALS PLANDrawing · PDF13 Nov 2025View
COND 5 - CRIMPLESHAM GRAVEL DETAILSOther · PDF13 Nov 2025View
COND 5- SELF BINDING GRAVEL DETAILSOther · PDF13 Nov 2025View
Reconsultation SheetReconsultation Sheet · PDF6 Nov 2025View
COND 9 - CONSTRUCTION PHASE PLAN (SHEET 1 OF 2)Drawing · PDF4 Nov 2025View
COND 8 - CATCHMENT 1 - SW CALCULATION PACKOther · PDF4 Nov 2025View
EMAIL FROM AGENT WITH FURTHER DETAILSCorrespondence · PDF4 Nov 2025View
Reconsultation SheetReconsultation Sheet · PDF3 Nov 2025View
COND 14 - ECOLOGICAL DESIGN STRATEGYReport · PDF14 Oct 2025View
EMAIL FROM AGENT WITH FURTHER INFORMATION AND AGREEMENT TO EOT - 14/11/25Agreement to extension of time · PDF14 Oct 2025View
UPDATE AND QUERIES TO AGENTCorrespondence · PDF9 Oct 2025View
ENVIRONMENTAL HEALTH COMMENTSConsultee Comment · PDF23 Sept 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT FDrawing · PDF18 Sept 2025View
COND 3 - SCHEDULE OF MATERIALS - ISSUE FOURCANCELLED · PDF18 Sept 2025View
CONDITION 5 ACCESS & PARKING MATERIALS PLANCANCELLED · PDF18 Sept 2025View
COND 5 - SCHEDULE OF DETAILS - ISSUE FOURCANCELLED · PDF18 Sept 2025View
COND 8 - GARDEN CENTRE EXTENSION - DRAINAGE STRATEGYDrawing · PDF18 Sept 2025View
COND 8 - DRAINAGE DESIGN FOR CATCHMENT 1Drawing · PDF18 Sept 2025View
COND 11 - PROPOSED PHASING PLANDrawing · PDF18 Sept 2025View
COND 11 - PROPOSED SITE SECTIONSDrawing · PDF18 Sept 2025View
COND 16 - 25133.102 LANDSCAPE PHASING PLANCANCELLED · PDF18 Sept 2025View
COND 16 - BOUNDARY TREATMENTS PLANDrawing · PDF18 Sept 2025View
COVERING LETTER FROM AGENTOther · PDF18 Sept 2025View
AGREEMENT TO EOT - 10/10/25Agreement to extension of time · PDF29 Aug 2025View
ENVIRONMENTAL HEALTHConsultee Comment · PDF24 Aug 2025View
EMAIL TO AGENT WITH QUERYCorrespondence · PDF22 Aug 2025View
FDC TREE CONSULTANTConsultee Comment · PDF22 Aug 2025View
FENLAND HIGHWAYS DIVISIONConsultee Comment · PDF21 Aug 2025View
CCC LEAD LOCAL FLOOD AUTHORITYConsultee Comment · PDF18 Aug 2025View
CORRESPONDENCE BETWEEN AGENT, ENGINEER AND THE LLFACorrespondence · PDF14 Aug 2025View
LLFAConsultee Comment · PDF8 Aug 2025View
CAMBRIDGESHIRE CONSTABULARYConsultee Comment · PDF4 Aug 2025View
FDC ECOLOGISTConsultee Comment · PDF24 Jul 2025View
Further Consultation SheetFurther Consultation Sheet · PDF22 Jul 2025View
MIDDLE LEVELConsultee Comment · PDF21 Jul 2025View
COND 3 - SCHEDULE OF MATERIALS - ISSUE TWOCANCELLED · PDF3 Jul 2025View
COND 5 - SCHEDULE OF DETAILS - ISSUE TWOCANCELLED · PDF3 Jul 2025View
COND 11 - PROPOSED SITE SECTIONSCANCELLED · PDF3 Jul 2025View
COND 11 - PROPOSED PHASING PLANCANCELLED · PDF3 Jul 2025View
COND 11 - PROPOSED SITE PLANDrawing · PDF3 Jul 2025View
COND 11 - EXISTING SITE SECTIONSDrawing · PDF3 Jul 2025View
COND 12 - SKYLARK ECOLOGY SURVEYS 2025Report · PDF3 Jul 2025View
COND 13 - SKYLARK CEMP BIODIVERSITYReport · PDF3 Jul 2025View
COND 14 - SKYLARK - ECOLOGICAL DESIGN STRATEGY 2025CANCELLED · PDF3 Jul 2025View
COND 16 - LANDSCAPE PROPOSALSDrawing · PDF3 Jul 2025View
COND 9 - CONSTRUCTION PHASE PLAN (SHEET 2 OF 2)Drawing · PDF3 Jul 2025View
COND 8 - RECEPTION - DRAINAGE STRATEGYDrawing · PDF3 Jul 2025View
COND 8 - GARDEN CENTRE EXTENSION - DRAINAGE STRATEGYCANCELLED · PDF3 Jul 2025View
F/YR24/0818/VOC - DECISION NOTICEDecision Notice · PDF3 Jul 2025View
COND 8 - DEFRA STANDARDS CHECKLISTReport · PDF3 Jul 2025View
COND 8 - GROUND INVESTIGATION REPORTReport · PDF3 Jul 2025View
COND 8 - MAINTENANCE SCHEDULEOther · PDF3 Jul 2025View
COND 8 - STANDARD CONSTRUCTION DETAILS (1 OF 2)Drawing · PDF3 Jul 2025View
COND 8 - STANDARD CONSTRUCTION DETAILS (2 OF 2)Drawing · PDF3 Jul 2025View
COND 8 - EXCEEDANCE FLOW PLANDrawing · PDF3 Jul 2025View
COND 8 - EXCEEDANCE FLOW PLANDrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT JDrawing · PDF3 Jul 2025View
COND 8 - TYPICAL FOREBAY DISCHARGE DETAIL FOR SUB-CATCHMENT IDrawing · PDF3 Jul 2025View
COND 8 - TYPICAL FOREBAY DISCHARGE DETAIL FOR SUB-CATCHMENT HDrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT H AND IDrawing · PDF3 Jul 2025View
COND 8 - TYPICAL FOREBAY DISCHARGE DETAIL FOR SUB-CATCHMENT GDrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT GDrawing · PDF3 Jul 2025View
COND 8 - TYPICAL FOREBAY DISCHARGE DETAIL FOR SUB-CATCHMENT FDrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT FCANCELLED · PDF3 Jul 2025View
COND 8 - TYPICAL FOREBAY DISCHARGE DETAIL FOR SUB-CATCHMENT EDrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT EDrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT D.Drawing · PDF3 Jul 2025View
COND 8 - TYPICAL FOREBAY DISCHARGE DETAIL FOR SUB-CATCHMENT DDrawing · PDF3 Jul 2025View
COND 8 - TYPICAL FOREBAY DISCHARGE DETAIL FOR SUB-CATCHMENT CDrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT CDrawing · PDF3 Jul 2025View
COND 8 - TYPICAL FOREBAY DISCHARGE DETAIL FOR SUB-CATCHMENT BDrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT B (SHEET 2 OF 2)Drawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT B (SHEET 1 OF 2Drawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR SUB-CATCHMENT ADrawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR CATCHMENT 2Drawing · PDF3 Jul 2025View
COND 8 - DRAINAGE DESIGN FOR CATCHMENT 1CANCELLED · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT J - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT H - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT I - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT G - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT F - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT E - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT D - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT C - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT B - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - SUB-CATCHMENT A - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - CATCHMENT 2 - SW CALCULATION PACKReport · PDF3 Jul 2025View
COND 8 - CATCHMENT 1 - SW CALCULATION PACKBNG Metric · PDF3 Jul 2025View
COND 8 - FOREBAY DESIGN CALCULATIONReport · PDF3 Jul 2025View
COND 8 - CATCHMENT 1 CONSTRUCTION DETAILSDrawing · PDF3 Jul 2025View
COND 8 - CATCHMENT 2 CONSTRUCTION DETAILSDrawing · PDF3 Jul 2025View
COND 8 - TYPICAL STANDARD SWALE CROSS SECTION DETAILSDrawing · PDF3 Jul 2025View
COND 8 - TYPICAL CULVERT DESIGNDrawing · PDF3 Jul 2025View
Schedule of ConditionsSchedule of Conditions · PDF3 Jul 2025View
Application FormApplication Form · PDF3 Jul 2025View
COND 9 - CONSTRUCTION PHASE PLAN (SHEET 1 OF 2)CANCELLED · PDF3 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve

Appeal status: Unknown

Decision Notice F/YR24/0818/VOC - DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.