Council planning record

Details reserved by condition 5 (highway works) of planning permission F/YR18/0331/F (Erection of 110 x dwellings comprising of: 5 x 2-storey 5-bed, 19 x 2-storey 4-bed, 73 x 2-storey 3-bed, 11 x 2-storey 2-bed and 2 x 2-bed flats with associated garages, parking and landscaping)

Phase 3 Land At Bassenhally Farm Eastrea Road Whittlesey Cambridgeshire

ApprovedReference: F/YR23/3073/CONDFenland District Council

Last published check: 10 Oct 2026, 22:58. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Discharge of condition
Received
5 Jun 2023
Validated
8 Jun 2023
Determination deadline
3 Aug 2023
Local authority
Fenland District Council

Application overview

Details reserved by condition 5 (highway works) of planning permission F/YR18/0331/F (Erection of 110 x dwellings comprising of: 5 x 2-storey 5-bed, 19 x 2-storey 4-bed, 73 x 2-storey 3-bed, 11 x 2-storey 2-bed and 2 x 2-bed flats with associated garages, parking and landscaping)

Proposal details

Reference
F/YR23/3073/COND
Alternative references
PP-12212210
Ward
Whittlesey East And Villages
Parish
Whittlesey Town Council

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Phase 3 Land At Bassenhally Farm Eastrea Road Whittlesey Cambridgeshire

This record has no verified map location.

View council map

Documents 25 of 25

DocumentPublishedAction
Decision NoticeDecision Notice · PDF4 Sept 2023View
Draft Decision NoticeDraft Decision Notice · PDF4 Sept 2023View
Officer ReportOfficer Report · PDF4 Sept 2023View
LOCAL HIGHWAY AUTHORITYConsultee Comment · PDF26 Jul 2023View
CHASER TO LHACorrespondence · PDF24 Jul 2023View
Standard Consultee ListStandard Consultee List · PDF28 Jun 2023View
MANHOLE SCHEDULEOther · PDF8 Jun 2023View
PROPOSED ROAD CROSS SECTIONS (SHEET 3)Drawing · PDF8 Jun 2023View
PROPOSED ROAD CROSS SECTIONS (SHEET 2)Drawing · PDF8 Jun 2023View
PROPOSED ROAD CROSS SECTIONS (SHEET 1)Drawing · PDF8 Jun 2023View
EXTERNAL WORKS CONSTRUCTION DETAILS (SHEET 2)Drawing · PDF8 Jun 2023View
EXTERNAL WORKS CONSTRUCTION DETAILS (SHEET 1)Drawing · PDF8 Jun 2023View
PROPOSED KERBING LAYOUTDrawing · PDF8 Jun 2023View
MATERIALS LAYOUT (SHEET 2)Drawing · PDF8 Jun 2023View
MATERIALS LAYOUT (SHEET 1)Drawing · PDF8 Jun 2023View
SECTION 38 LAYOUT (SHEET 2)Drawing · PDF8 Jun 2023View
SECTION 38 LAYOUT (SHEET 1)Drawing · PDF8 Jun 2023View
LONGITUDINAL SECTIONS (INC DRAINAGE) (SHEET 2)Drawing · PDF8 Jun 2023View
LONGITUDINAL SECTIONS (INC DRAINAGE) (SHEET 1)Drawing · PDF8 Jun 2023View
S104 DRAINAGE CONSTRUCTION DETAILS (SHEET 1)Drawing · PDF8 Jun 2023View
GULLY AREA PLANDrawing · PDF8 Jun 2023View
S104 DRAINAGE LAYOUT (SHEET 2)Drawing · PDF8 Jun 2023View
S104 DRAINAGE LAYOUT (SHEET 1)Drawing · PDF8 Jun 2023View
Application FormApplication Form · PDF8 Jun 2023View
ANGLIA WATER LETTER CONFIRMATION OF TECH APPROVALOther · PDF8 Jun 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve

Appeal status: Unknown

Decision Notice Draft Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.