Council planning record

Details reserved by Condition 3 (Surface Water During Construction), 4 (Surface Water Detailed Design) and 5 (Construction Management Plan) of planning permission F/YR22/0083/F (Erect a care home (2-storey 56 x bed) and associated works)

W H Feltham And Son Limited Estover Road March Cambridgeshire

ApprovedReference: F/YR22/3095/CONDFenland District Council

Last published check: 10 Oct 2026, 01:41. Check the council record for more recent changes.

Application location

W H Feltham And Son Limited Estover Road March Cambridgeshire

This record has no verified map location.

View council map

Application summary

Status
Approved
Application type
Discharge of condition
Received
5 Aug 2022
Validated
16 Aug 2022
Determination deadline
11 Oct 2022
Local authority
Fenland District Council

Application overview

Details reserved by Condition 3 (Surface Water During Construction), 4 (Surface Water Detailed Design) and 5 (Construction Management Plan) of planning permission F/YR22/0083/F (Erect a care home (2-storey 56 x bed) and associated works)

Proposal details

Reference
F/YR22/3095/COND
Alternative references
PP-11457384
Ward
March North
Parish
March Town Council
Agent
DWA Architects (London) Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 42 of 42

DocumentPublishedAction
Officer ReportOfficer Report · PDF2 Dec 2022View
Decision NoticeDecision Notice · PDF2 Dec 2022View
Draft Decision NoticeDraft Decision Notice · PDF2 Dec 2022View
LLFAConsultee Comment · PDF1 Dec 2022View
CONSTRUCTION METHOD STATEMENTReport · PDF30 Nov 2022View
EMAIL FROM AGENT WITH UPDATE DOCUMENTCorrespondence · PDF30 Nov 2022View
EMAIL FROM AGENT REGARDING REVISED DOCUMENTCorrespondence · PDF21 Nov 2022View
CONSTRUCTION METHOD STATEMENTCANCELLED · PDF18 Nov 2022View
LLFAConsultee Comment · PDF17 Nov 2022View
ENVIRONMENTAL HEALTHConsultee Comment · PDF15 Nov 2022View
Reconsultation SheetReconsultation Sheet · PDF8 Nov 2022View
CONSTRUCTION METHOD STATEMENTCANCELLED · PDF25 Oct 2022View
EMAIL FROM AGENT WITH REVISED CMPCorrespondence · PDF25 Oct 2022View
COND 4 -2996 - DRAINAGE STRATEGY REPORT - CARE HOME CAWOOD CLOSE - REV(I)Report · PDF21 Oct 2022View
EMAIL FROM AGENT WITH REVISED DRAINAGE SCHEMECorrespondence · PDF21 Oct 2022View
EMAIL TO AGENT WITH UPDATEConsultee Comment · PDF7 Oct 2022View
LLFA COMMENTSConsultee Comment · PDF5 Oct 2022View
COND 4 -2996 - DRAINAGE STRATEGY REPORT - CARE HOME CAWOOD CLOSE - REV HCANCELLED · PDF23 Sept 2022View
EMAIL FROM AGENT WITH REVISED DRAINAGE STRATEGYCorrespondence · PDF23 Sept 2022View
CONSTRUCTION METHOD STATEMENTCANCELLED · PDF23 Sept 2022View
LLFAConsultee Comment · PDF12 Sept 2022View
ENVIRONMENTAL HEALTHConsultee Comment · PDF8 Sept 2022View
Further Consultation SheetFurther Consultation Sheet · PDF1 Sept 2022View
Standard Consultee ListStandard Consultee List · PDF19 Aug 2022View
Application FormApplication Form · PDF16 Aug 2022View
Schedule of ConditionsSchedule of Conditions · PDF16 Aug 2022View
COND 3 - APPENDIX F DRAINAGE LAYOUT AND DETAIL - FOUL AND SURFACE WATER DRAINAGEDrawing · PDF16 Aug 2022View
COND 4 - DRAINAGE STRATEGY REPORT, REV(G)Report · PDF16 Aug 2022View
COND 4 - MIDDLE LEVEL APPROVALOther · PDF16 Aug 2022View
COND 4 - APPENDIX A - EXISTING AND PROPOSED SITE PLAN, REV ADrawing · PDF16 Aug 2022View
COND 4 - APPENDIX B - IMPERMEABLE AREAS - REV CDrawing · PDF16 Aug 2022View
COND 4 - APPENDIX C - ANGLIAN WATER RECORDSReport · PDF16 Aug 2022View
COND 4 - APPENDIX D - SOAKAWAY TESTS RESULTS.Report · PDF16 Aug 2022View
COND 4 - APPENDIX E - SUDS CALCULATIONS - REV EReport · PDF16 Aug 2022View
COND 4 - APPENDIX E - SUDS CALCULATIONS - REV FReport · PDF16 Aug 2022View
COND 4 - APPENDIX G - DRAINAGE SURVEY - REV AReport · PDF16 Aug 2022View
COND 4 - APPENDIX H - AQUACELL CORE SPECIFICATIONReport · PDF16 Aug 2022View
COND 4 - APPENDIX I - DOWNSTREAM DEFENDER DATA SHEETReport · PDF16 Aug 2022View
COND 4 - APPENDIX J - ANGLIAN WATER - PRE PLANNING REPORT - REV A.Report · PDF16 Aug 2022View
COND 4 - APPENDIX L - DESK STUDY REPORTReport · PDF16 Aug 2022View
COND 4 - APPENDIX M - SUDS PLANTER TECHNICAL DETAILSReport · PDF16 Aug 2022View
COND 5 -2.8.1. CONSTRUCTION METHOD STATEMENT - LPC MARCH CMP REV B (PETERHOUSE)CANCELLED · PDF16 Aug 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approve

Appeal status: Unknown

Decision Notice Draft Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.