Awaiting decisionCouncil status: Under Consideration
Hybrid Planning Application Comprising: (1) Outline Planning Permission Capable Of Phased And Severable Delivery (With All Matters Reserved Except Principal Vehicular Access From Gosport Road) For Demolition Of Existing Buildings And Structures, Including Bellman Aircraft Hangars; Decommissioning Of Aircraft Taxiway; Employment Development Within Use Classes E(G)(Ii), E(G)(Iii), B2 And B8 (Up To 56,559Sqm Gea/54,035Sqm Gia) With Ancillary Uses; Earthworks And Site Reprofiling; Access Roads, Parking And Servicing Areas; Footways And Cycleways; Secondary Access Points; Drainage Infrastructure, Including Pumping Stations And Sustainable Drainage Systems; Utilities And Associated Infrastructure; Airside Facilities; Landscaping; Ecological Enhancements Including Biodiversity Net Gain; Fencing, Lighting, Security And Associated Works; And (2) Full Planning Permission For Alterations To The Principal Vehicular Access From Gosport Road; Realignment Of The Existing Access Road And Construction Of The First Section Of The Site Spine Road; Installation Of Drainage, Pumping Station And Electrical Infrastructure, Including Associated Below-Ground Works; Perimeter Landscaping, Bunds, Fencing And Screening; Ecological Enhancements; And Associated Works.
Hybrid Planning Application Comprising: (1) Outline Planning Permission Capable Of Phased And Severable Delivery (With All Matters Reserved Except Principal Vehicular Access From Gosport Road) For Demolition Of Existing Buildings And Structures, Including Bellman Aircraft Hangars; Decommissioning Of Aircraft Taxiway; Employment Development Within Use Classes E(G)(Ii), E(G)(Iii), B2 And B8 (Up To 56,559Sqm Gea/54,035Sqm Gia) With Ancillary Uses; Earthworks And Site Reprofiling; Access Roads, Parking And Servicing Areas; Footways And Cycleways; Secondary Access Points; Drainage Infrastructure, Including Pumping Stations And Sustainable Drainage Systems; Utilities And Associated Infrastructure; Airside Facilities; Landscaping; Ecological Enhancements Including Biodiversity Net Gain; Fencing, Lighting, Security And Associated Works; And (2) Full Planning Permission For Alterations To The Principal Vehicular Access From Gosport Road; Realignment Of The Existing Access Road And Construction Of The First Section Of The Site Spine Road; Installation Of Drainage, Pumping Station And Electrical Infrastructure, Including Associated Below-Ground Works; Perimeter Landscaping, Bunds, Fencing And Screening; Ecological Enhancements; And Associated Works.
Reference
P/26/1268/D3
Ward
Stubbington
UPRN
10012140488
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.