Scotland · Local authority

Falkirk
Planning applications.

Explore collected planning applications and decisions for Falkirk. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
6,339Searchable applications
234Recorded as pending
96%Approval rate · 5,062 approved or refused records
220Refused applications

4,842 approved · 220 refused · 523 withdrawn. Received dates in our records: 30 Jun 2012 to 9 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas9 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. DecidedP/22/0130/FUL

    Extension to Dwellinghouse and Formation of Deck

    4 Wallace Brae Grove Reddingmuirhead Falkirk FK2 0FF

    Received 14 Mar 2022
  2. DecidedP/22/0133/FUL

    Construction of 12 Industrial Units (Class 5)

    Manuel Works Whitecross Linlithgow EH49 6LH

    Received 15 Mar 2022
  3. DecidedP/22/0134/FUL

    Construction of No. 5 Dwellinghouses (Amendment to P/18/0432/FUL)

    Land To The North Of 44 Drum Farm Lane Bo'ness Harbour Road Bo'ness

    Received 15 Mar 2022
  4. DecidedP/22/0135/PPP

    Development of Land to form Solar PV (Photovoltaic) Electricity Generation

    Land North Of 3 North Inches Falkirk

    Received 15 Mar 2022
  5. DecidedP/22/0137/FUL

    Extension to Dwellinghouse

    10 Pirleyhill Drive Shieldhill Falkirk FK1 2EA

    Received 16 Mar 2022
  6. DecidedP/22/0138/FUL

    Alterations and Extension to Dwellinghouse and Formation of Raised Deck

    38 Weir Street Falkirk FK1 1RA

    Received 16 Mar 2022
  7. DecidedP/22/0139/FUL

    Construction of Boundary Fence

    Land To The East Of Unit 6 Bonnybridge Industrial Estate Murnin Road Bonnybridge

    Received 16 Mar 2022
  8. DecidedP/22/0140/FUL

    Construction of Public House/Restaurant Incorporating External Drinking/Eating Areas, Sub-Division/Alteration of Existing Class 5 (General Industrial) Building and Associated Access and Parking

    Billy Mills Body Shop Castlelaurie Industrial Estate Bankside Falkirk FK2 7XF

    Received 16 Mar 2022
  9. DecidedP/22/0141/FUL

    Alterations and Extension to Dwellinghouse

    Glenearn 15 Camelon Road Falkirk FK1 5RU

    Received 17 Mar 2022
  10. DecidedP/22/0142/FUL

    Construction of a Holiday Lodge (Retrospective)

    Glenbervie House Torwood Larbert FK5 4SJ

    Received 17 Mar 2022
  11. DecidedP/22/0143/FUL

    Construction of Outbuilding and Boundary Fence

    80 Bellsdyke Road Larbert FK5 4EN

    Received 18 Mar 2022
  12. DecidedP/22/0144/FUL

    Extension to Dwellinghouse

    46 Chestnut Crescent Dunipace Denny FK6 6LF

    Received 18 Mar 2022
  13. DecidedP/22/0145/ADV

    Display of Illuminated and Non-Illuminated Advertisements

    Unit 3 Bridge Street Bonnybridge FK4 1AA

    Received 21 Mar 2022
  14. DecidedP/22/0146/FUL

    Extension to Dwellinghouse

    17 Forest View Polmont Falkirk FK2 0UL

    Received 21 Mar 2022
  15. DecidedP/22/0147/FUL

    Extension to Dwellinghouse

    Shangri La Farm 15 Cauldcoats Holdings Blackness Linlithgow EH49 7NP

    Received 21 Mar 2022
  16. DecidedP/22/0148/FUL

    Extension to Dwellinghouse

    17 Pirleyhill Drive Shieldhill Falkirk FK1 2EA

    Received 22 Mar 2022
  17. DecidedP/22/0149/FUL

    Siting of Snack Van

    Site To The East Of 152 Thornhill Road Thornhill Road Falkirk

    Received 22 Mar 2022
  18. DecidedP/22/0150/FUL

    Extension to Dwellinghouse

    41 Avonbank Gardens Dunipace Denny FK6 6LH

    Received 22 Mar 2022
  19. DecidedP/22/0151/FUL

    Extension to Dwellinghouse

    35 Kestrel Drive Brightons Falkirk FK2 0TR

    Received 22 Mar 2022
  20. DecidedP/22/0152/FUL

    Extension to Dwellinghouse

    11 Nobel View Reddingmuirhead Falkirk FK2 0EF

    Received 23 Mar 2022
  21. DecidedP/22/0153/FUL

    Construction of Outbuilding

    Priorsford 75 Grahamsdyke Road Bo'ness EH51 9DZ

    Received 23 Mar 2022
  22. DecidedP/22/0155/FUL

    Extension and Alteration to Dwellinghouse and Construction of Outbuilding

    Ardroi 37 Church Road California Falkirk FK1 2BD

    Received 24 Mar 2022
  23. DecidedP/22/0157/FUL

    Extension to Dwellinghouse

    2 Howard Street Falkirk FK1 5JG

    Received 24 Mar 2022
  24. DecidedP/22/0158/FUL

    Construction of Stables and Livestock Shelter

    Binniehill Farm Binniehill Road Slamannan

    Received 25 Mar 2022

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Falkirk

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Falkirk, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage