Scotland · Local authority

Falkirk
Planning applications.

Explore collected planning applications and decisions for Falkirk. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
6,324Searchable applications
234Recorded as pending
96%Approval rate · 5,049 approved or refused records
220Refused applications

4,829 approved · 220 refused · 521 withdrawn. Received dates in our records: 30 Jun 2012 to 9 Oct 2026. Most recent record check: 12 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas9 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. DecidedP/21/0570/FUL

    Construction of Outbuilding

    3 Seabegs Crescent Bonnybridge FK4 2DB

    Received 20 Oct 2021
  2. DecidedP/21/0615/FUL

    Extension to Dwellinghouse

    36 Rosebank Avenue Falkirk FK1 5JP

    Received 21 Oct 2021
  3. DecidedP/21/0617/FUL

    Construction of Outbuilding

    1 Arnothill Court Falkirk FK1 5SY

    Received 25 Oct 2021
  4. DecidedP/21/0618/FUL

    Installation of Replacement Windows

    Carmaphyl Acre Road Bo'ness EH51 9SX

    Received 25 Oct 2021
  5. DecidedP/21/0621/FUL

    Change of Use of and Alterations to Stable Block to form Dwellinghouse

    Easter Pirleyhill Farm Falkirk FK1 2BA

    Received 26 Oct 2021
  6. DecidedP/21/0622/FUL

    Extension to Dwellinghouse

    East Villa Bridgeness Road Bo'ness EH51 9LR

    Received 26 Oct 2021
  7. DecidedP/21/0623/ADV

    Display of Non-Illuminated Advertisements

    118 - 120 High Street Falkirk FK1 1NW

    Received 26 Oct 2021
  8. DecidedP/21/0625/FUL

    Extension to Dwellinghouse and Rear Decking

    The Tower Polmont Falkirk FK2 0YE

    Received 27 Oct 2021
  9. DecidedP/21/0201/FUL

    Siting of Temporary Modular Buildings

    Police Station Main Road Maddiston Falkirk FK2 0LF

    Received 27 Oct 2021
  10. DecidedP/21/0626/FUL

    Alterations to Shopfronts

    Unit 26 and 26A Central Retail Park Falkirk FK1 1LW

    Received 28 Oct 2021
  11. DecidedP/21/0627/CPL

    Use of Unit 17 for Unrestricted Class 1 Food and Non Food Sales with the Exception Only of those Goods Defined as Prohibited Uses in the 2001 Minute of Agreement and 2010 Minute of Agreement.

    Unit 17 Central Retail Park Falkirk FK1 1LW

    Received 28 Oct 2021
  12. DecidedP/21/0628/FUL

    Alterations to Building, Installation of Air Conditioning/Refrigeration Units, Enclosures and Bin Store

    Unit 26 and 26A Central Retail Park Falkirk FK1 1LW

    Received 28 Oct 2021
  13. DecidedP/21/0629/FUL

    Installation of Retractable Canopy

    Chianti East Beancross Farm Polmont Falkirk FK2 0XS

    Received 28 Oct 2021
  14. DecidedP/21/0630/ADV

    Display of Illuminated and Non-Illuminated Advertisements

    Unit 9 Central Retail Park Falkirk FK1 1LW

    Received 29 Oct 2021
  15. DecidedP/21/0631/FUL

    Extension to Dwellinghouse

    9 Fairspark Terrace Bo'ness EH51 0NE

    Received 29 Oct 2021
  16. DecidedP/21/0632/FUL

    Extension to Dwellinghouse

    Dunottar 89 Dean Road Bo'ness EH51 9BA

    Received 29 Oct 2021
  17. DecidedP/21/0633/FUL

    Extension to Dwellinghouse

    11 Balmoral Gardens Brightons Falkirk FK2 0JF

    Received 29 Oct 2021
  18. DecidedP/21/0634/FUL

    Installation (Re-Location) of Extraction Flue

    2C & 2D Newmarket Street Falkirk FK1 1JQ

    Received 29 Oct 2021
  19. DecidedP/21/0635/FUL

    Installation of Self Service Jet Wash Bay

    Millfield Service Station Main Street Polmont Falkirk FK2 0PS

    Received 1 Nov 2021
  20. DecidedP/21/0636/FUL

    Replace Existing Flat Roof with New Pitched Roof

    1 Culzean Place Stenhousemuir Larbert FK5 4UD

    Received 1 Nov 2021
  21. DecidedP/21/0637/FUL

    Extension to Dwellinghouse

    York House 8 Dunure Street Bonnybridge FK4 1EF

    Received 1 Nov 2021
  22. DecidedP/21/0639/FUL

    Extension to Dwellinghouse

    26 Bonnywood Avenue Bonnybridge FK4 1NT

    Received 1 Nov 2021
  23. DecidedP/21/0640/CPL

    Use of Land for Outdoor Nursery

    Falkirk Wheel Lime Road Falkirk FK1 4RS

    Received 1 Nov 2021
  24. DecidedP/21/0641/FUL

    Alterations to Rear Elevation of Building

    Unit 26 & 26A Central Retail Park Falkirk FK1 1LW

    Received 1 Nov 2021

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Falkirk

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Falkirk, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage