Scotland · Local authority

Falkirk
Planning applications.

Explore collected planning applications and decisions for Falkirk. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
5,797Searchable applications
234Recorded as pending
96%Approval rate · 4,594 approved or refused records
200Refused applications

4,394 approved · 200 refused · 464 withdrawn. Received dates in our records: 30 Jun 2012 to 9 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas9 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. DecidedP/18/0080/FUL

    Managed Realignment of Bothkennar Field

    Site To The South Of Bothkennar Centre For Citizen Education Falkirk

    Received 14 Feb 2018
  2. DecidedP/18/0081/ADV

    Display of Illuminated and Non-Illuminated Advertisements

    Phoenix Honda Glensburgh Road Grangemouth FK3 8XJ

    Received 15 Feb 2018
  3. DecidedP/18/0082/FUL

    Extension to Dwellinghouse

    2 Charles Snedden Avenue Bo'ness EH51 9TJ

    Received 15 Feb 2018
  4. DecidedP/18/0083/FUL

    Extension to Dwellinghouse

    8 Miller Place Airth Falkirk FK2 8JY

    Received 15 Feb 2018
  5. DecidedP/18/0084/FUL

    Extension to Dwellinghouse and Formation of Access Ramp

    2 Kelvinview Avenue Banknock Bonnybridge FK4 1JR

    Received 15 Feb 2018
  6. DecidedP/18/0085/LBC

    Installation of Boiler Flue

    Falkirk Trinity Church Manse Place Falkirk FK1 1JN

    Received 15 Feb 2018
  7. DecidedP/18/0086/FUL

    Installation of Flue

    Falkirk Trinity Church Manse Place Falkirk FK1 1JN

    Received 16 Feb 2018
  8. DecidedP/18/0087/FUL

    Change of Use from Office (Class 2) to Assembly and Leisure (Class 11)

    102 Manor Street Falkirk FK1 1NU

    Received 16 Feb 2018
  9. DecidedP/18/0088/FUL

    Extension to Dwellinghouse

    35 South Broomage Avenue Larbert FK5 3LF

    Received 16 Feb 2018
  10. DecidedP/18/0089/FUL

    Change of Use from Class 11 (Assembly and Leisure) to Class 1 (Non Food Retail)

    Probowl Ltd Redbrae Road Falkirk FK1 4DD

    Received 16 Feb 2018
  11. DecidedP/18/0090/FUL

    Alterations to Dwellinghouse (Partially Retrospective)

    9 Forbes Crescent Larbert FK5 3LU

    Received 19 Feb 2018
  12. DecidedP/18/0091/FUL

    External Alterations and Repairs

    84 Manor Street Falkirk FK1 1NU

    Received 19 Feb 2018
  13. DecidedP/18/0092/FUL

    Extension to Dwellinghouse

    62 Cobblebrae Crescent Falkirk FK2 7QP

    Received 19 Feb 2018
  14. DecidedP/18/0093/FUL

    Erection of Outbuilding (Retrospective)

    14 George Street Grangemouth FK3 9AG

    Received 15 Feb 2018
  15. DecidedP/18/0094/FUL

    Erection of Outbuilding and Erection of Fence (1 metre high)

    30 Letham Cottages Letham Falkirk FK2 8QJ

    Received 16 Feb 2018
  16. DecidedP/18/0095/FUL

    Extension to Dwellinghouse (Dormer)

    137 High Street Bonnybridge FK4 1BY

    Received 21 Feb 2018
  17. DecidedP/18/0097/FUL

    Erection of Outbuilding

    Vine Cottage Dunmore Falkirk FK2 8LY

    Received 21 Feb 2018
  18. DecidedP/18/0098/ADV

    Display of Free-standing Non-Illuminated Advertisement

    Site To The North Of 54 Blenheim Place Bellsdyke Road Larbert

    Received 22 Feb 2018
  19. DecidedP/18/0099/PPP

    Erection of Dwellinghouse

    Carronvale House Carronvale Road Larbert FK5 3LH

    Received 22 Feb 2018
  20. DecidedP/18/0100/FUL

    Erection of Residential Care Home (Class 8 - Residential Institution)

    Falkirk Ambulance Station Windsor Road Falkirk FK1 5EW

    Received 22 Feb 2018
  21. DecidedP/18/0101/FUL

    Extension to Dwellinghouses (Dormer)

    12 & 14 South Broomage Avenue Larbert FK5 3LF

    Received 23 Feb 2018
  22. DecidedP/18/0102/FUL

    Extension and Alterations to Dwellinghouse

    Vellore House Maddiston Falkirk FK2 0BN

    Received 23 Feb 2018
  23. DecidedP/18/0103/LBC

    Extension and Alterations to Dwellinghouse

    Vellore House Maddiston Falkirk FK2 0BN

    Received 23 Feb 2018
  24. DecidedP/18/0104/FUL

    Extension to Existing Garden Centre Including Coffee Shop, Office, Storage Accommodation and Ancillary Works (Amendment to Planning Permission P/17/0169/FUL)

    Klondyke Garden Centre Burnside Nursery Polmont Falkirk FK2 0XS

    Received 26 Feb 2018

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Falkirk

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Falkirk, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage