Scotland · Local authority

Falkirk
Planning applications.

Explore collected planning applications and decisions for Falkirk. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
5,746Searchable applications
234Recorded as pending
96%Approval rate · 4,546 approved or refused records
197Refused applications

4,349 approved · 197 refused · 463 withdrawn. Received dates in our records: 30 Jun 2012 to 9 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas9 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. DecidedP/17/0571/FUL

    Replacement of Conservatory Roof and Glazing

    16 Bonnymuir Crescent Bonnybridge FK4 1GD

    Received 1 Sept 2017
  2. DecidedP/17/0572/FUL

    Alteration and Extension to Industrial Unit to Form Office Building (Class 4)

    The Old Mill Industrial Estate Airth

    Received 1 Sept 2017
  3. DecidedP/17/0573/MSC

    Erection of 6 Dwellinghouses and Associated Infrastructure

    Myrehead Farm Linlithgow EH49 6LQ

    Received 4 Sept 2017
  4. DecidedP/17/0574/FUL

    Installation of Telecommunication Cabinets

    Site To The North Of 1 Bank Street Bank Street Falkirk

    Received 4 Sept 2017
  5. DecidedP/17/0575/FUL

    Extension to Dwellinghouse

    36 Kings Road Grangemouth FK3 9AR

    Received 4 Sept 2017
  6. DecidedP/17/0576/FUL

    Extension to Dwellinghouse

    The Brae 25 Glen Brae Falkirk FK1 5LL

    Received 4 Sept 2017
  7. DecidedP/17/0579/PPP

    Development of Land for Residential Purposes

    Land To The South Of 4 - 7 The Bungalows The Bungalows Larbert

    Received 6 Sept 2017
  8. DecidedP/17/0580/PPP

    Erection of Dwellinghouse

    West Riverside Farm Denny FK6 5JF

    Received 6 Sept 2017
  9. DecidedP/17/0581/FUL

    Erection of 3 Dwellinghouses, Car Parking and Access Road

    Land To The South Of 3 Hillcrest Square Reddingmuirhead

    Received 6 Sept 2017
  10. DecidedP/17/0582/FUL

    Change of Use from Industrial Use to Form Dwellinghouse

    15 Corbiehall Bo'ness EH51 0AW

    Received 7 Sept 2017
  11. DecidedP/17/0583/FUL

    Demolish Existing Garage and Porch, Extension to Dwellinghouse and Formation of Vehicular Access

    16 Jubilee Road Dunipace Denny FK6 6NH

    Received 7 Sept 2017
  12. DecidedP/17/0584/CPL

    Extension to Dwellinghouse and Erection of Decking

    53 Franklin Avenue Falkirk FK2 7FU

    Received 8 Sept 2017
  13. DecidedP/17/0585/FUL

    Extension to Dwellinghouse

    27 Garvald Road Head Of Muir Denny FK6 5NR

    Received 8 Sept 2017
  14. DecidedP/17/0586/FUL

    Change of Use from Former Bank (Ground Floor) to 2 No. 2 Bedroom Flats

    26 Duke Street Denny FK6 6DD

    Received 8 Sept 2017
  15. DecidedP/17/0587/CPL

    Extension to Dwellinghouse

    15 Kinloch Place Grangemouth FK3 0EB

    Received 11 Sept 2017
  16. DecidedP/17/0588/FUL

    Development of a Class 5 Biofuels Demonstration Plant Comprising Buildings, Plant and Associated Works

    Site To The East Of 3 Caledon Green Caledon Green Grangemouth

    Received 12 Sept 2017
  17. DecidedP/17/0589/FUL

    Extension to Dwellinghouse

    6 Torwood Avenue Larbert FK5 4NG

    Received 12 Sept 2017
  18. DecidedP/17/0590/FUL

    Demolition of Public House (Sui Generis) and Erection of Building for Retail Use (Class 1) with Associated Infrastructure, Including ATM Machine

    175 Dean Road Bo'ness EH51 0HG

    Received 12 Sept 2017
  19. DecidedP/17/0592/FUL

    Installation of French Doors and Formation of Bay Window

    36 Laurel Grove Bonnybridge FK4 2EE

    Received 12 Sept 2017
  20. DecidedP/17/0593/LBC

    Replacement Windows

    1A - 1D Kirk Wynd Falkirk FK1 1LZ

    Received 13 Sept 2017
  21. DecidedP/17/0594/FUL

    Extension to Dwellinghouse (Raising of Roof Height)

    123 Bantaskine Street Falkirk FK1 5EX

    Received 13 Sept 2017
  22. DecidedP/17/0595/FUL

    Alterations and Extensions to Hotel

    Park Hotel 1 Arnothill Falkirk FK1 5RY

    Received 14 Sept 2017
  23. DecidedP/17/0596/CPL

    Extension to Dwellinghouse

    6 Waterfurs Drive Falkirk FK2 7GB

    Received 14 Sept 2017
  24. DecidedP/17/0597/PPP

    Subdivision of Garden Ground and Erection of Dwellinghouse Incorporating Formation of Vehicular Access

    57 Grahamsdyke Road Bo'ness EH51 9DZ

    Received 18 Sept 2017

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Falkirk

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Falkirk, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage