England · County council

Essex planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Essex County Council. Search an address, application reference or proposal. Official Essex website

Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 29 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeCC/BAS/83/01

    Proposed multi-purpose hall and new all weather multi-use games area

    Greensted Junior School,Kirby Road,Basildon,SS141RX

    Received 18 Jun 2001
  2. Decision MadeCC/TEN/102/03

    Continuation of development approved under CC/TEN/79/98 without compliance with condition 31st July 2003 and retention of the relocatable unit until 31st July 2008

    Bradfield County Primary School,Heath Rd,Bradfield,Manningtree,CO11 2UZ

    Received 29 Jul 2003
  3. Decision MadeCC/TEN/99/09

    The continued use of three classbases for a temporary period until 31 December 2011 without compliance with condition 2 (time limit) attached to planning permission CC/TEN/165/06

    Ravenscroft County Primary School,Nayland Drive,Clacton on Sea,CO16 8TZ

    Received 10 Dec 2009
  4. Decision MadeESS/29/20/TEN/34/1

    Details pursuant to Conditions 34 (Noise); 39 (Dust); 40 and 41 (Drainage) of planning permission ESS/29/20/TEN that was for the proposed western extension to Martells Quarry for the extraction, processing, sale and distribution of silica sand and gravel, and subsequent restoration using inert materials along with the creation of a new access.

    Land at Martells Quarry, Slough Lane, Ardleigh, Essex, CO7 7RU

    Received 16 Feb 2024
  5. Decision MadeESS/54/08/ROC/NMA11

    Non-material amendment to permission ref ESS/54/08/ROC to allow: clarification of the cell diving embankment heights; use of imported material for construction of the embankments; use of a geosynthetic drainage layer beneath the embankments; change to the approved key trench; alterations to the material compliance testing criteria; and alterations to compaction layers within the embankments (originally approved under condition 33).

    Wallasea Island,Rochford,SS4 2HD

    Received 14 Dec 2012
  6. Decision MadeESS/39/14/BTE/LA6

    Details pursuant to legal agreement associated with ESS/39/14/BTE - Schedule 6 – Highway matters. ESS/39/14/BTE was for "Extraction of an estimated 2.5 million tonnes of sand and gravel together with the provision of an new access from Little Braxted Lane; and the installation/construction and operation of primary processing and ancillary facilities comprising washing and bagging plant, silt lagoons, weighbridge, site management office, mess room and maintenance workshop; with restoration to agriculture and water based nature conservation habitats."

    Land at Colemans Farm, Colemans Farm, Little Braxted Lane, Rivenhall, Witham, CM8 3EX

    Received 2 Sept 2016
  7. Decision MadeESS/52/06/UTT/SPO

    Request for a scoping opinion

    Preferred Area K, Liitle Easton,Little Easton Airfield,Little Easton,Dunmow,CM6 2BB

    Received 26 Oct 2006
  8. Decision MadeESS/28/14/CHL

    Use of previously imported materials for the construction and expansion of a screening bund to the existing recycling facility and to achieve revised restoration of former silt lagoons to biodiversity areas. In addition approval under condition 42 of Planning Permission CHL/1890/87 to allow importation of 12,000m3 of clean soils and clays for restoration purpose

    Bulls Lodge Quarry, Generals Lane, Boreham, Chelmsford, CM3 3HR

    Received 9 Jun 2014
  9. Decision MadeESS/39/14/BTE/18/1

    Extraction of an estimated 2.5 million tonnes of sand and gravel together with the provision of an new access from Little Braxted Lane; and the installation/construction and operation of primary processing and ancillary facilities comprising washing and bagging plant, silt lagoons, weighbridge, site management office, mess room and maintenance workshop; with restoration to agriculture and water based nature conservation habitats

    Land at Colemans Farm, Colemans Farm, Little Braxted Lane, Rivenhall, Witham, CM8 3EX

    Received 23 Jun 2016
  10. Decision MadeCC/MAL/28/24

    Removal of existing storage sheds, installation of new heating system (Air Source Heat Pumps), provision of new acoustic enclosure, electrical intake cabinet and storage shed.

    Cold Norton County Primary School, 2 St Stephens Road, Cold Norton, Essex, CM3 6JE

    Received 10 May 2024
  11. Decision MadeESS/03/17/BTE/13/1

    Details pursuant to Condition 13 – Noise Monitoring for planning application ref: ESS/03/17/BTE (Braintree Waste Transfer Station)

    Braintree Waste Transfer Station, Cordons Farm, Long Green, Cressing, Braintree, CM77 8DL

    Received 10 May 2018
  12. Decision MadeESS/63/10/CHL

    Retrospective planning permission for mineral extraction (now ceased) Infilling existing void with inert waste (construction waste, soils & clays) Recycling of inert materials to recover secondary aggregates and soils. Restoration to species rich grassland in line with the Essex Biodiversity Habitat Action Plan.

    St Clere's Hall Pit,Main Road,Danbury,Chelmsford,CM3 4AR

    Received 16 Dec 2010
  13. Decision MadeCC/COL/51/14

    The retention of one classbase for a temporary period until 31 December 2019 without compliance with Condition 2 (time limit) attached to planning permission CC/COL/103/09

    Gosbecks Primary School, Owen Ward Close, Colchester, CO2 9DG

    Received 22 Oct 2014
  14. Decision MadeCC/CPT/64/10

    Replacement of an existing Crittall window with a new UPVC window and the creation of a new windon in the side elevation

    Canvey Island Library,High Street,Canvey,SS8 7RB

    Received 4 Jun 2010
  15. Decision MadeCC/COL/142/08

    Landscaping work to provide a 1.5m wide footpath within school playing field and creation of new access and gate to north east boundary of school.

    Chappel C of E Primary School,The Street,Chappel,Colchester,CO6 2DD

    Received 16 Dec 2008
  16. Decision MadeESS/51/98/TEN

    Irrigation Reservior

    Land at Lodge Farm,Lodge Farm,Lodge Farm Lane,St Osyth,Clacton-0n-Sea,CO16 8SA

    Received 26 Aug 1998
  17. Application WithdrawnESS/57/15/MAL

    Proposed washing plant for use during the construction of an agricultural reservoir previously approved under Planning Ref. ESS/35/14/MAL

    Cobbs Farm, Maldon Road, Goldhanger, Maldon, CM9 8BQ

    Received 30 Nov 2015
  18. Decision MadeCHL/1019/87-34e

    Aftercare - Phases 3, 4 and 5 2007/08

    Bulls Lodge Quarry

    Received 22 Jan 2008
  19. Decision MadeCC/BTE/37/14

    The provision of a new modular classroom for a temporary period until 31 August 2021.

    Bocking Church Street Primary School, Church Street, Braintree, CM7 5LA

    Received 4 Jun 2014
  20. Decision MadeCC/MAL/45/14/LB/3/1

    Listed Building Consent for Rebuilding and reinstatement of existing boundary brick wall

    East Essex Adult Community College, The Friary, Carmelite Way, Maldon, Essex, CM9 5FJ

    Received 7 Jul 2015
  21. Decision MadeCC/BTE/58/07

    Development of a new two storey sixth form building to provide 15 classbases and perfomring arts facilities along with a refectory to accommodate a maximum of 300 students

    Notley High School,Notley Road,Braintree,CM7 1HL

    Received 18 May 2007
  22. Decision MadeCC/COL/34/12/SO

    Construction of a new 300 place primary school with external hard and soft play areas, canopy and 20 space car park

    Vacant Land, Circular Road East, Colchester

    Received 4 Sept 2012
  23. Decision MadeCC/BAS/28/19/14/1

    Details pursuant to Condition 14 – Railway line considerations/assessment for planning application ref: CC/BAS/28/19 (Upgrade works to the A127/A130 Fairglen Interchange including the creation of a new link road between A130 and A127)

    A127/A130 Fairglen Interchange

    Received 12 Oct 2020
  24. Decision MadeESS/07/18/TEN/45/1

    Details pursuant to Condition 45 – Landscape Scheme for Plant Site – ESS/07/18/TEN: Part retrospective application for the continuation of extraction of sand & gravel, reinstatement with inert fill and restoration to part agriculture, part nature conservation and part open water, without compliance with Conditions 1 (compliance with submitted details), 32 (compliance with submitted restoration plan and submission of plant site restoration plan by 16/03/17), 43 (aftercare), 44 (lake formation), 45 (Planting scheme by 16/03/17), condition 50 (Completion by 31 December 2018) and 51 (Removal of buildings and plant by 31 December 2018) attached to permission ref ESS/58/17/TEN, to allow an amended restoration design including additional open water and altered habitats (land to the east of Keelars Lane), the late submission of a restoration plan for the plant site and inclusion of imported restoration material (west of Keelars Lane) the late submission of a planting scheme, and an extension of time to complete the restoration of the plant site until 30 June 2019.

    Wivenhoe Quarry, Alresford Road, Wivenhoe, CO7 9JU

    Received 29 Jan 2019

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage