England · County council

Essex planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Essex County Council. Search an address, application reference or proposal. Official Essex website

Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 28 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeESS/36/02/COL

    Relocation and replacement of an existing concrete batching plant

    Bellhouse & Abbotstone Landfill Site,Warren Lane,Stanway,Colchester,CO3 0NN

    Received 25 Jun 2002
  2. Decision MadeCC/COL/59/11/5/1

    Wheel Washing Facilities

    St Peters Cof E Primary School,Carters Hill,Boxted, Colchester,CO4 5YN

    Received 10 Feb 2012
  3. Decision MadeCC/BRW/95/06

    Construction of an 8 class, 2 storey teaching block adjoining the existing sports hall

    Anglo European High School,Willow Green,Ingatestone,CM4 0DJ

    Received 23 Jun 2006
  4. Decision MadeCC/EPF/65/99

    Provision of a single classbase with toilet

    Limes Farm County Junior and Infant Schools,Limes Avenue,Chigwell,IG7 5LP

    Received 22 Oct 1999
  5. Decision MadeCC/COL/172/02

    Proposed variation of Condition 1 (time limit) attached to approved application CC/COL/59/02 to allow the erection and retention of an additional bay of relocatable accommodation (lobby, store, toilets) until 31 October 2007

    Great Tey CofE Primary School,Chrismund Way,Great Tey,Colchester,CO6 1AZ

    Received 29 Oct 2002
  6. Decision MadeCC/BTE/53/07

    Single storey classroom extension with ancillary accommodation and landscaped play garden

    Stanley Drapkin County Primary School,Bower Hall Drive,Steeple Bumpstead,Haverhill,CB9 7ED

    Received 18 Apr 2007
  7. Decision MadeCC/UTT/57/16

    The development of the site to provide a new 1FE primary school with associated car, cycle and scooter parking, hard play areas, means of enclosure, landscaping and associated infrastructure.

    Former St Marys Primary School, St Johns Road, Stansted Mountfitchet, CM24 8JP

    Received 13 Dec 2016
  8. Decision MadeESS/145/20/BTE/NMA1

    Non-material amendment to permission ref: ESS/145/20/BTE (Construction and operation of a waste recycling facility comprising a standalone recycling building, static recycling plant, storage bays and associated plant and equipment, office and welfare building, weighbridge, parking, fencing, lighting, landscaping, overnight HGV parking and new vehicular access) to allow alteration in design of office and welfare building.

    Haverhill Recycling Facility, Plot 7, Phoenix Road, Haverhill, Haverhill Business Park, CB9 7AE

    Received 30 Jul 2021
  9. Decision MadeESS/21/15/COL

    Continuation of operation of asphalt plant permitted under Planning Inspectorate Ref No: T/APP/L1500/A/250991/P7 (ECC Ref No: ESX/35/93/COL) without compliance with condition 1 (hours of operation) to allow production to take place between 0700hrs and 0000hrs Monday to Friday during July 2015.

    Bellhouse Quarry and Landfill Site, Warren Lane, Stanway

    Received 14 Apr 2015
  10. Decision MadeCC/EPF/08/17/13/5

    Details pursuant to Condition 13 – Construction Environmental Management Plan (CEMP) for planning application ref: CC/EPF/08/17 (Junction 7a M11)

    Gilden Way and Sheering Road public highways and land between Sheering Road and M11 Motorway

    Received 25 Jun 2021
  11. Application WithdrawnESS/113/23/COL/13/1

    Details pursuant to Conditions 7 and 8 (Arboriculture); 10 (CEMP); 11 (Wildlife Lighting); 12 (BNG Plan); 13 (LEMP); 14 (Archaeology); 24 and 27 (Noise); 30 (Dust); 54 (Restoration); 56 (Landscaping); 57 (Agricultural Aftercare) and 58 (Amenity Aftercare) of planning permission ESS/113/23/COL that was for a western extension to Colchester Quarry at Land at Bellhouse Farm South

    Land at Bellhouse Farm South

    Received 30 Jan 2025
  12. Decision MadeCC/CHL/27/15/3/1

    Erection of a 3.2m high black weldmesh fence on black steel posts to rear of existing 1.00m high brick wall on part boundary between Ford End C Of E Primary School and Main Road, Ford End shown as line “A-B” on Plan Gq377 and coloured blue, total length approx. 22.50m

    Ford End C Of E Primary School, Main Road, Ford End, Chelmsford, CM3 1LQ

    Received 16 Jul 2015
  13. Decision MadeCC/COL/26/07

    The erection of a single storey extension to the existing primary school buildings to provide a Children's Centre housing outreach services, a "drop in" information area, health consultation and training facilities with the formation of a new adjacent car parking bay for disabled use

    Birch CofE Primary School,School Hill,Birch,Colchester,CO2 0LZ

    Received 21 Feb 2007
  14. Application WithdrawnESS/37/96/ROC

    Extraction Brickearth etc

    Land at Westbarrow Hall Farm,Pelhams Farm,Cherry Orchard Lane,Rochford

    Received 20 Jun 1996
  15. Decision MadeCC/BTE/100/03

    Proposed new multi use hall with ancillary accommodation & internal remodelling of existing school to provide internal access to new hall

    Belchamp St Paul's CofE (VA) Primary School,Vicarage Road,,Belchamp St Paul,Sudbury,CO10 7BP

    Received 31 Jul 2003
  16. Decision MadeESS/07/13/BRW

    The use of the site as a material storage, recycling and distribution facility (second submission with revised access)

    Codham Hall Farm, Codham Hall Lane, Great Warley, Brentwood, Essex

    Received 1 Mar 2013
  17. Decision MadeESS/09/18/COL

    Erection of Clean Materials Recycling Facility at Existing Established Recycling/Recovery Facility, Relocation of Existing Staff Welfare Facility, Provision of Additional Staff Parking, Culverting Section of Existing Swale, Additional Landscaping, Rainwater Harvesting together with amendments to site operating hours and HGV movement times to permit 24 HGV Movements between 07:00- 16-30 hours on Good Friday's

    Land at Greenacres, Packards Lane, Wormingford

    Received 9 Apr 2018
  18. Decision MadeCC/UTT/42/10

    The continued use of three double temporary classbases and a single temporary classbase until 31 August 2014

    Felsted Primary School,Watch House Green,Felsted,Dunmow,CM6 3EB

    Received 12 Mar 2010
  19. Decision MadeESS/39/14/BTE/47/1

    Extraction of an estimated 2.5 million tonnes of sand and gravel together with the provision of an new access from Little Braxted Lane; and the installation/construction and operation of primary processing and ancillary facilities comprising washing and bagging plant, silt lagoons, weighbridge, site management office, mess room and maintenance workshop; with restoration to agriculture and water based nature conservation habitats

    Land at Colemans Farm, Little Braxted Lane, Rivenhall End, WITHAM, CM8 3EX

    Received 26 Jul 2016
  20. Decision MadeESS/07/16/BTE/31/1

    Details pursuant to condition 31 (Woodland planting details) of ESS/07/16/BTE. ESS/07/16/BTE for “Continuation of development permitted by ESS/24/14/BTE without compliance with conditions 2 (application details), 7 (timescales), 38 (sequence of restoration) and 59 (no importation of mineral for processing) to allow amended restoration levels, revised phasing and additional time to complete extraction and restoration until 2021, utilisation of overburden in restoration and processing of mineral both arising from the Integrated Waste Management Facility (if implemented). Planning permission ESS/24/14/BTE being for Extraction of an estimated reserve of 3 million tonnes of sand and gravel (from Sites A3 and A4 as identified Minerals Local Plan) and retention of existing access onto the A120, private haul road, sand and gravel processing plant, ready mixed concrete plant, bagging plant, dry silo mortar plant and water management system, internal haul roads and re-contouring of restoration levels of extraction areas (Sites R and A2) with restoration to a combination of agriculture, woodland, biodiversity, water lagoons and to levels appropriate to safeguard implementation of planning permission ESS/37/08/BTE (Integrated Waste Management Facility)”

    Bradwell Quarry, Church Road, BRADWELL, CM77 8EP

    Received 5 Feb 2018
  21. Decision MadeCC/EPF/83/08

    The retention of a relocatable classroom unit until 31 August 2013 without complying with Condition 1 (time limit) attached to planning permission CC/EPF/101/03

    High Ongar Primary School,The Street,High Ongar,Ongar,CM5 9NB

    Received 18 Jul 2008
  22. Decision MadeCC/CHL/149/02

    Extension of Plant Room at 2nd floor level

    County Hall Site,Market Road,Chelmsford,CM1 1QH

    Received 3 Sept 2002
  23. Decision MadeESS/51/94/COL

    Diversion of access rd to Bellhouse Fm.

    Bellhouse & Abbotstone Landfill Site,Warren Lane,Stanway,Colchester,CO3 0NN

    Received 16 Aug 1994
  24. Decision MadeCC/COL/50/15

    The replacement of existing external single glazed painted timber with metal casement windows, painted timber doors and frames and double glazed anodised aluminium windows and doors with double glazed powder coated aluminium windows and doors

    Prettygate Library, Prettygate Road, Colchester, Essex, CO3 4EQ

    Received 3 Sept 2015

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage