England · County council

Essex planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Essex County Council. Search an address, application reference or proposal. Official Essex website

Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 28 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeCC/HLW/56/16/3/1

    Details pursuant to Condition 3- Bicycle Parking (CC/HLW/56/16- Proposed construction of a new two storey building (c.2550m2 floor area) to accommodate a 2FE, a 52 place early years centre/nursery with associated car, cycle and scooter parking, hard play areas, means of enclosure and landscaping and associated infrastructure on a 2.67 hectare site)

    Newhall Primary School, The Chase, Harlow, Newhall, CM17 9JA

    Received 12 Sept 2017
  2. Decision MadeESS/39/23/BTE/52b/01

    Details pursuant to partial discharge of condition 52b (Odour management) of planning permission ESS/39/23/BTE. ESS/39/23/BTE is a variation of the planning permission for the Rivenhall Integrated Waste Management Facility

    Rivenhall Airfield, Coggeshall Road (A120), Braintree, CO5 9DF

    Received 17 Mar 2025
  3. Decision MadeESS/24/02/HLW

    Erection of clinical waste container for storage of waste

    Units 7 & 9 Haslemere Estate,Lovet Road,Harlow

    Received 10 May 2002
  4. Decision MadeESS/80/20/TEN/NMA06

    Non-material amendment to permission ref ESS/80/20/TEN to allow the retention of the northern access onto Tye Lane

    Wivenhoe Quarry Alresford Road Wivenhoe Essex CO7 9JU

    Received 8 Jan 2026
  5. Decision MadeESS/07/16/BTE/22/5

    Details pursuant to Condition 22 of ESS/07/16/BTE - Noise monitoring results for January 2019 (ESS/07/16/BTE - Continuation of development permitted by ESS/24/14/BTE without compliance with conditions 2 (application details), 7 (timescales), 38 (sequence of restoration) and 59 (no importation of mineral for processing) to allow amended restoration levels, revised phasing and additional time to complete extraction and restoration until 2021, utilisation of overburden in restoration and processing of mineral both arising from the Integrated Waste Management Facility (if implemented). Planning permission ESS/24/14/BTE being for Extraction of an estimated reserve of 3 million tonnes of sand and gravel (from Sites A3 and A4 as identified Minerals Local Plan) and retention of existing access onto the A120, private haul road, sand and gravel processing plant, ready mixed concrete plant, bagging plant, dry silo mortar plant and water management system, internal haul roads and re-contouring of restoration levels of extraction areas (Sites R and A2) with restoration to a combination of agriculture, woodland, biodiversity, water lagoons and to levels appropriate to safeguard implementation of planning permission ESS/37/08/BTE [Integrated Waste Management Facility]

    Bradwell Quarry, Church Road, BRADWELL, CM77 8EP

    Received 15 Apr 2019
  6. Application WithdrawnCC/COL/88/05

    Single storey extension to school reception and office

    Kings Ford County Infant & Junior School,Gloucester Ave,Colchester,CO2 9AZ

    Received 17 Jun 2005
  7. Decision MadeESS/20/18/UTT/2/1

    Details pursuant to condition 2 (Notification of commencement) of ESS/20/18/UTT. ESS/20/18/UTT was for “Continuation of the winning and working of sand and gravel, erection of a concrete plant, workshop and ancillary buildings, and the importation and treatment of inert material to produce secondary aggregate and reclamation material for progressive restoration to landscaped farmland originally permitted by planning permission ref. ESS/52/13/UTT without compliance with Condition 4 (Hours of operation) to allow heavy goods vehicles to travel off site between the hours 0600 and 0700 Monday to Saturday.”

    Highwood Quarry, Stortford Road, Little Canfield, Dunmow, Essex, CM6 1SL

    Received 8 May 2019
  8. Decision MadeESS/49/17/BAS/SO

    Extension to existing Pitsea Power Station site compound by 0.193ha involving installation and operation of activated carbon based landfill gas clean-up system comprising up to 9 vessels (7.2m high), associated pipework, re -surfacing and installing concrete plinths, security fencing, new access gate and repositioning and modifying some other existing fixed plant and equipment.

    Pitsea Power Station, Pitsea Landfill, Pitsea Hall Lane, Pitsea, Basildon, SS16 4UH

    Received 1 Aug 2017
  9. Decision MadeCC/BAS/28/19/21/1

    Details pursuant to Condition 21 – Surface Water Management and Monitoring Plan for planning application ref: CC/BAS/28/19 (Upgrade works to the A127/A130 Fairglen Interchange including the creation of a new link road between A130 and A127)

    A127/A130 Fairglen Interchange

    Received 11 Jun 2020
  10. Decision MadeESS/20/18/UTT/57/2

    Details pursuant to condition 57 (Annual Aftercare report for Autumn 2020/Autumn 2021) of ESS/20/18/UTT. ESS/20/18/UTT was for “Continuation of the winning and working of sand and gravel, erection of a concrete plant, workshop and ancillary buildings, and the importation and treatment of inert material to produce secondary aggregate and reclamation material for progressive restoration to landscaped farmland originally permitted by planning permission ref. ESS/52/13/UTT without compliance with Condition 4 (Hours of operation) to allow heavy goods vehicles to travel off site between the hours 0600 and 0700 Monday to Saturday.”

    Highwoods Quarry, Stortford Road, Dunmow CM6 1SL

    Received 13 Apr 2020
  11. Decision MadeCC/COL/40/17/8/1

    Details pursuant to Condition 8 - Lighting Design Strategy for Biodiversity (CC/COL/40/17 - The erection of a single storey school building to accommodate eight new classrooms and ancillary accommodation, together with an extension to the car park and associated landscaping)

    Home Farm County Primary School, Shelley Road, Colchester. CO3 4JL

    Received 4 Oct 2017
  12. Decision MadeCC/BTE/05/14

    The continued use of a classbase for a temporary period until 31 August 2019 without compliance with Condition 2 (time limit) attached to planning permission CC/BTE/08/09

    St. Peters C Of E Primary School, Myneer Park, Coggeshall, Colchester, CO6 1YU

    Received 15 Jan 2014
  13. Decision MadeCC/HLW/84/22/4/2

    Details pursuant to Condition 4(b) – Construction Management Plan for main works of planning application ref: CC/HLW/84/22 (New vehicle parking area, new and revised accesses, acoustic security fencing, landscaping and ancillary works proposed in association with approved planning application ref: CC/HLW/21/17)

    Land between River Way and A1184 (Cambridge Road), Harlow

    Received 21 Aug 2023
  14. Decision MadeCC/HLW/58/11

    The installation of an automatic barrier to the entrance of the car park to include signage, entry phone unit, Armco barrier, new curbing & block paving

    Goodman House,Station Approach,Harlow,CM20 2ET

    Received 26 Jul 2011
  15. Decision MadeESS/20/18/UTT/64/1

    Details pursuant to condition 64 (Waste inputs & secondary outputs for first half 2019) of Planning permission ESS/20/18/UTT. ESS/20/18/UTT was a variation to “Winning & working of sand and gravel, erection of a concrete plant, workshop & ancillary buildings/importation & treatment of inert material to produce secondary aggregate & reclamation material for progressive restoration to landscaped farmland

    Highwood Quarry, Stortford Road, Little Easton, Near Great Dunmow, Essex

    Received 25 Jul 2019
  16. Decision MadeESS/55/09/CHL/25/01

    Continuation of use of an in-vessel composting facility without compliance with cond 25 (cessation of operations by 31 Dec 2009 and removal of all plant, buildings, machinery, foundations, structures, hardstandings, roads and stockpiles by 31 Mar 2010) attached to planning permission ESS/30/06/CHL, to extend the end date to require cessation of operations by 31 Dec 2013 & removal of all plant, buildings, machinery, foundations, structures, hardstandings, roads etc.

    Sandon Quarry, Southend Road, Sandon, Howe Green, Essex, CM2 7TE

    Received 2 Sept 2014
  17. Decision MadeESS/148/20/CHL/34/01

    Details pursuant to condition 34 (Archaeological Post Excavation Examination Phases 14 to 16) of ESS/148/20/CHL. ESS/148/20/CHL is a variation permission of the following development “Winning and working of sand and gravel.”

    Bulls Lodge Quarry (Boreham Airfield), Generals Lane, Boreham, Chelmsford, CM3 3HR

    Received 28 Oct 2024
  18. Decision MadeESS/60/19/MAL/6/1

    Details pursuant to condition 6 (Surface water drainage scheme) and condition 7 (Surface water drainage system maintenance plan) for planning application ref ESS/60/19/MAL: Extension to the existing materials recycling facility facilitated by the construction of an additional standalone building for enhanced plastic and waste recycling and other associated site improvement works and changes

    Green Recycling Ltd, Quayside Industrial Park, Bates Road, Maldon, Essex, CM9 5FA

    Received 2 Apr 2020
  19. Decision MadeESS/18/01/CHL

    Extraction of sand & gravel as a borrow pit in connection with A131 construction. Disposal of surplus clay from A131 Gt Leighs by pass

    Wheelers Farm,Little Waltham,Chelmsford,CM3 3LZ

    Received 26 Mar 2001
  20. Decision MadeESS/33/98/CPT

    Delete Cond. 2 ESX/67/92/CPT & apply for permanent permission for a waste transfer station, skip storage & recycling.

    27 Viking Way,27 Viking Way,Canvey

    Received 5 May 1998
  21. Decision MadeESS/03/18/BTE/23/04

    Details pursuant to Condition 23 (Noise monitoring results November 2019) of ESS/03/18/BTE. ESS/03/18/BTE was for “Extraction of 2 million tonnes of sand and gravel (from Site A5 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems and extension of the internal haul road into Site A5 with restoration to agriculture and biodiversity (species rich grassland and wetland)”

    Bradwell Quarry, Church Road, Bradwell, CM77 8EP, and land east of Sheepcotes Lane

    Received 17 Dec 2019
  22. Application WithdrawnCC/CHL/46/26

    Proposed new landscaping (to include paving and areas of grass) to replace existing hard landscaping.

    Baddow Hall Junior School New Road Great Baddow Chelmsford Essex CM2 7QZ

    Received 18 Jun 2026
  23. Decision MadeESS/04/23/EPF/19/2

    Bioaerosol monitoring pursuant to condition 19 of planning permission ref: ESS/04/23/EPF (Continued operation of composting facility without compliance with condition 8 (stockpile heights) attached to permission ref. ESS/09/20/EPF to allow windrow heights to be constructed to a maximum height of 4 metres at Ashlyns Farm, Epping Road, North Weald, Epping, CM16 6RZ.)

    Ashlyns Farm, Epping Road, North Weald, Epping, CM16 6RZ

    Received 15 Apr 2024
  24. Application WithdrawnESS/113/23/COL/56/1

    Details pursuant to Conditions 7 and 8 (Arboriculture); 10 (CEMP); 11 (Wildlife Lighting); 12 (BNG Plan); 13 (LEMP); 14 (Archaeology); 24 and 27 (Noise); 30 (Dust); 54 (Restoration); 56 (Landscaping); 57 (Agricultural Aftercare) and 58 (Amenity Aftercare) of planning permission ESS/113/23/COL that was for a western extension to Colchester Quarry at Land at Bellhouse Farm South

    Land at Bellhouse Farm South

    Received 30 Jan 2025

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage