England · County council

Essex planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Essex County Council. Search an address, application reference or proposal. Official Essex website

Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 28 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeESS/113/22/BAS/36/1

    Details pursuant to Condition 36 (Surface Water Pipe management) of planning permission ESS/113/22/BAS that was for Redevelopment and consolidation of an existing Materials Recycling Facility (MRF) at Archers Fields, Pitsea, Basildon, Essex, SS13 1DH

    Land At Archers Fields, Pitsea, Basildon, Essex, SS13 1DH

    Received 27 May 2026
  2. Decision MadeESS/31/05/BTE/SPO

    Scoping Opinion Waste Management Facility

    Rivenhall Airfield,Bradwell Quarry,Coggeshall Road,Bradwell,Braintree,CM77 8EP

    Received 5 Aug 2005
  3. Decision MadeESS/39/13/TEN/11/1

    Details pursuant to Condition 11 (lighting details) of planning application ref: ESS/39/13/TEN (Continuation of winning and working of mineral with progressive infilling and restoration to agriculture and nature conservation)

    Brightlingsea Quarry, Moverons Lane, Brightlingsea, CO7 0SB

    Received 15 Jan 2025
  4. Decision MadeCC/HLW/145/98

    The change of use of 0.75ha of land to be used as a school playing field by the HARLOW SPECIAL SCHOOL, TENDRING ROAD, HARLOW

    Harlow Fields School,Tendring Road,Harlow,CM18 6RN

    Received 25 Nov 1998
  5. Decision MadeCC/UTT/90/20/11/1

    Details pursuant to Condition 11 – Construction Management Plan for planning application ref: CC/UTT/90/20 (All-through school; sports hall; formal and informal hard and soft play areas/pitches; new vehicular and pedestrian accesses; vehicle drop-off and parking areas; landscaping and other associated infrastructure and works)

    Land to the east of Buttleys Lane, Stortford Road, Great Dunmow, CM6 1SH

    Received 14 Feb 2024
  6. Decision MadeESS/06/18/MAL/19/1

    Details pursuant to Condition 19 (Noise Monitoring) (ESS/06/18/MAL - Continuation of the construction of an agricultural reservoir by the extraction and removal from the site of sand, gravel and surplus soils without compliance with conditions 2 (compliance with submitted details), 27 (planting scheme) and 40 (aftercare) attached to planning permission ref ESS/21/17/MAL, to allow an amended restoration scheme including revised planting, increased agricultural land, altered reservoir profile and wetland swale)

    Cobbs Farm, Maldon Road, Goldhanger, CM9 8BQ

    Received 10 May 2019
  7. Application WithdrawnESS/24/99/UTT

    Vary #2 ESX/11/92/UTT to extend Christmas & New Year opening hours

    Ugley Landfill Site,Ugley Landfill Site,Cambridge Road,Stansted Mountfitchet,CM22 6HT

    Received 16 Jul 1999
  8. Decision MadeCC/COL/46/13/4

    Application for a new single storey extension, demolition of existing toilet block, infill of undercroft to create 2 no. new classbases and associated works

    St. Georges New Town Junior School, Canterbury Road, Colchester, CO2 7RU

    Received 18 Mar 2014
  9. Decision MadeESS/13/12/COL/SO

    Extending the time limit for implementation of development (Condition 1) attached to previous permission ESS/40/08/COL for an additional 3 years for the use of land as a scrap metal waste recycling and transfer facility involving the collection and receipt, sorting, storage, and processing of metal and other material components and parts from the dismantling of vehicles and other non-ferrous household items; the erection of a non-ferrous warehouse building incorporating administrative staff offices and adjoining covered storage area; erection of a vehicle process building and scrap sorting bays; Installation of weighbridge and scrap shearer plant plus formation of vehicle parking and hard standing areas

    Haven Quay, Quayside, Haven Road, Colchester, CO2 8HT

    Received 6 Feb 2012
  10. Decision MadeESS/28/14/CHL/13/1

    Use of previously imported materials for the construction and expansion of a screening bund to the existing recycling facility and to achieve revised restoration of former silt lagoons to biodiversity areas. In addition approval under condition 42 of Planning Permission CHL/1890/87 to allow importation of 12,000m3 of clean soils and clays for restoration purpose

    Bulls Lodge Quarry, Generals Lane, Boreham, Chelmsford, CM3 3HR

    Received 10 Jul 2015
  11. Decision MadeESS/25/94/BTE

    Temp import & Stockpile from 2419

    Barnards Pit,Barnards Farm Pit,Hatfield Peverel,Chelmsford

    Received 6 Apr 1994
  12. Decision MadeESS/28/12/MAL

    Extension to existing Waste Transfer Station including ancillary skip hire business encompassing 2 additional existing buildings and outside storage of inert waste materials

    Park Farm, Park Lane, Tolleshunt Knights, Maldon, CM9 8HB

    Received 2 Apr 2012
  13. Decision MadeESS/17/18/TEN/47/1

    Details pursuant to Condition 47 – Soil Movement Scheme – ESS/17/18/TEN: Extraction of 3.8 million tonnes of sand and gravel as an easterly extension to the existing Wivenhoe Quarry, erection of sand and gravel processing plant and ancillary facilities, new vehicular access onto the B1027 Brightlingsea Road, and restoration to agriculture and low-level water-based nature conservation habitats, lowland meadow, woodland planting and hedgerow enhancement using approximately 1.2 million cubic metres of imported inert waste material

    Land to the south of Colchester Main Road, Alresford, Nr Colchester, C07 8DB

    Received 4 Oct 2022
  14. Decision MadeESS/03/07/HLW

    Continuation of development for the production of coated roadstone without compliance with Cond 5 (hours of operation) as attached to permission ESS/31/01/HLW, to allow extended night time & introduce Sunday working for a period not exceeding 40 days pa

    Harlow Rail Depot,Station Approach,Harlow,CM20 2EL

    Received 11 Jan 2007
  15. Decision MadeCC/MAL/56/06

    Retention of a relocatable classroom until 31 December 2007 without complying with condition 5 (time limit) attached to planning permission CC/MAL/19/01

    Cold Norton Primary School,St Stephens Road,Cold Norton,Maldon,CM3 6JE

    Received 28 Mar 2006
  16. Decision MadeCC/CHL/29/15/NMA1

    Change from the jointed oak timber cladding to western red cedar

    Springfield Primary School, Forsythia Close, Chelmsford, CM1 6XW

    Received 8 Oct 2015
  17. Decision MadeESS/52/05/CHL

    Excavation and regrading of land to provide additional flood storage

    Land at Old Hall Farm, Boreham, Essex,Old Hall and Generals Farms,Boreham,Chelmsford,CM2 6GF

    Received 21 Nov 2005
  18. Decision MadeCC/UTT/62/08

    Proposed part single and part two storey extension to the rear of the school, including demolition of an existing store and construction of a bin store

    Wimbish County Primary School,Maple Lane,Tye Green,Wimbish,Saffron Walden,CB10 2XE

    Received 29 May 2008
  19. Application WithdrawnESS/35/05/ROC

    Proposed construction of a building to screen and partially enclose waste transfer activities

    Unit 13,Rawreth Industrial Estate,Raweth Lane,Rayleigh,SS6 9RL

    Received 16 Sept 2005
  20. Decision MadeCC/CHL/85/21/06/01

    Details pursuant to condition 6 (Archaeology Written Scheme of Investigation) of CC/CHL/85/21. CC/CHL/85/21 was for “Chelmsford North East Bypass (CNEB): A single carriageway road between Roundabout 4 of the Beaulieu Park Radial Distributor Road (RDR1) and a new roundabout on the A131 at Chatham Green plus dualling of the existing A131 between Chatham Green and Deres Bridge roundabout. With one intermediate roundabout, 3 road overbridges and 1 pedestrian/cycle/horse overbridge. Together with other associated works and landscaping.”

    Land between Beaulieu Park (north of Generals Lane), Boreham Parish, and Deres Bridge Roundabout on A131, Great & Little Leighs Parish, to the north east of Chelmsford.

    Received 17 Jun 2022
  21. Decision MadeCC/CHL/68/99

    Renewal of temporary planning for two existing relocatable classbases

    Danbury Park County Primary School,Well Lane,Danbury,Chelmsford,CM3 4AB

    Received 12 Nov 1999
  22. Decision MadeCC/COL/15/99

    Proposed extension to form Quiet Study Area, Extension to office, storage facilities

    Langham County Primary School,School Road,Langham,Colchester,CO4 5BB

    Received 9 Mar 1999
  23. Decision MadeESS/57/04/TEN/NMA2

    Non-material amendment to planning permission reference: ESS/57/04/TEN to allow a) an enlarged stockpiling area for materials, prior to processing, and top soil b) further bunding/screening around the site c) revised access to the silt lagoon area d) re-alignment of the landscape planting along the north-eastern boundary and e) revised phasing for working.

    Crown Quarry (Ardleigh Reservoir Extension),Old Ipswich Road,Tendring,Colchester,CO7 7QR

    Received 23 Sept 2013
  24. Decision MadeESS/105/21/TEN/22/1

    Details pursuant to Condition 22 (CEMP) of planning permission ref no: ESS/105/21/TEN that was for the “Continuation of construction of an irrigation reservoir without compliance with Condition 3 (Approved Details) of Planning Permission ESS/24/15/TEN that was for "Construction of an irrigation reservoir involving the excavation, processing and removal of sand, gravel and soils, engineering works and ancillary buildings" to now provide for retrospective revisions to the location and design of the peripheral environmental bund, aggregate processing plant, mineral stockpile and storage areas, the site entrance, the internal access road and site water management and the addition of a mobile soil screening plant.

    Land at: Elmstead Hall, Elmstead, Colchester, Essex

    Received 7 Dec 2022

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage