England · County council

Essex planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Essex County Council. Search an address, application reference or proposal. Official Essex website

Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 27 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeCC/EPF/08/17/NMA1

    Non material amendment to planning application ref: CC/EPF/08/17 (Junction 7a M11) to allow additional works to trees to accommodate the re-location of utilities from Gilden Way, Harlow

    Gilden Way and Sheering Road public highways and land between Sheering Road and M11 Motorway

    Received 25 Sept 2018
  2. Application WithdrawnESS/79/96/COL

    Vary#3 CC/COL/26/82 Deposit Waste.

    Bellhouse Landfill Site,Bellhouse & Abbotstone Landfill Site,Warren Lane,Stanway,Colchester,CO3 0NN

    Received 22 Nov 1996
  3. Decision MadeCC/BTE/150/05/LB

    Provision of new disabled access ramp to main entrance

    Halstead Library,Bridge Street,Halstead,CO9 1HU

    Received 4 Nov 2005
  4. Decision MadeCC/HLW/38/23

    Installation of an external condenser unit

    Potter Street Primary School, Carters Mead Harlow, Essex, CM17 9EU

    Received 27 Apr 2023
  5. Decision MadeCC/CPT/32/17

    The continuation of the development for the demolition of the former Montgomerie Infants School building and the erection of a new Special Needs School with associated car and cycling parking, landscaping and infrastructure without compliance with condition 2 approved drawings of pp CC/CPT/64/15 for the retrospective installation of external flues

    Application site formally used by Montgo, Land adjacent to Glenwood Special School, Rushbottom Lane, Thundersley, Benfleet, SS7 4LW

    Received 16 Jun 2017
  6. Decision MadeCC/MAL/68/22

    The retention of a double classbase for a further temporary period without compliance with Condition 2 (time limit) attached to planning permission CC/MAL/12/17

    Woodham Walter CofE Primary School, The Street, Woodham Walter CM9 6RF

    Received 13 Jul 2022
  7. Decision MadeCC/HLW/74/03

    Install relocatable classroom unit (No 1422) and renew planning permission for existing unit (No.3041)

    Hare Street Primary School and Nursery,Little Grove Field,Harlow,CM19 4BU

    Received 16 Jun 2003
  8. Decision MadeESS/13/14/BAS/13/1

    Construction and use of an Anaerobic Digestion facility

    Site east of the farm yard, Anaerobic Digestion plant, Marsh Farm, Vange by-Pass, VANGE, SS16 4QG

    Received 8 Aug 2016
  9. Decision MadeCC/CHL/15/21/13/1

    Details pursuant to Condition 13 – Construction Management Plan for planning application ref: CC/CHL/15/21 (new Primary School and Early Years Nursery)

    Land off St Luke's Way, Runwell, Wickford

    Received 12 Jul 2021
  10. Decision MadeCC/BAS/118/10

    All weather playing surface (60m x 40m) plus a 3m high perimeter fence and gates, located in the south west corner of the school site.

    Great Berry Primary School,Forest Glade,Langdon Hills,Basildon,SS166SG

    Received 16 Nov 2010
  11. Decision MadeCC/EPF/16/15

    Continuation of use of one class base for a temporary period until 31st August 2020, without compliance with Condition 2 (Time Limit) attached to planning permission CC/EPF/119/10

    Theydon Bois Primary School, Orchard Drive, Theydon Bois, Epping, CM167DH

    Received 20 Feb 2015
  12. Decision MadeESS/47/03/CHL/SO

    Cont of s & g extraction with processing & manufacture of ready mixed concrete & mortar without compliance with Cond 17 (hrs of working) attached to plng per CHL/1890/87 to allow periodic night time ready mixed concrete production & sale for highway maint

    Bulls Lodge Quarry,Generals Lane,Boreham,Chelmsford,CM3 3HR

    Received 23 Jul 2003
  13. Decision MadeCC/BAS/03/02

    Proposed variation of condition 1 (time limit) attached to approved application CC/BAS/26/97 to allow retention of 3 relocatable classbases until 31 December 2004

    Hilltop Junior School,Hilltop County Infants & Junior School,Hill Avenue,Wickford,SS11 8LT

    Received 21 Dec 2001
  14. Decision MadeESS/45/16/TEN

    Change of use of land to form minor extension of vehicles breakers yard including alterations to crossover, erection of building and construction of new internal road and turning area (resubmission of ESS/60/15/TEN)

    Auto Spares Station Yard, Great Bentley Road, Thorrington, CO7 8HT

    Received 12 Oct 2016
  15. Decision MadeESS/70/20/MAL

    Continuation of use of a washing plant for processing of indigenous sand and gravel obtained from the construction of an agricultural reservoir without compliance with Conditions 3 (cessation and restoration by 20th May 2020) and 4 (removal of plant and machinery by 20th May 2020 attached to planning permission ref ESS/03/19/MAL, to allow additional time for completion and restoration of the development

    Cobbs Farm, Maldon Road, Goldhanger, Maldon, CM9 8BQ

    Received 29 May 2020
  16. Decision MadeCC/TEN/137/05

    Construction of 2 lifts and a corridor linking one of the lifts to school buildings

    Tendring Technology College, Ladermere Road, Thorpe-le-Soken,Tendring CHS,Ladermere Road,Thorpe-le-Soken,Clacton-on-Sea

    Received 18 Oct 2005
  17. Decision MadeESS/11/13/EPF/SO

    The importation of 50,000m3 of inert material suitable to correct the differential settlement and reprofile the site and a revised restoration scheme with afteruse to energy crops and conservation grassland.

    Ongar Landfill, Mill Lane, High Ongar, CM5 9RG

    Received Not published
  18. Decision MadeESS/20/18/UTT/69/8

    Details pursuant to condition 69 (Early morning HGV movement records 1 Dec to 30 Dec 2019) of ESS/20/18/UTT. ESS/20/18/UTT was for “Continuation of the winning and working of sand and gravel, erection of a concrete plant, workshop and ancillary buildings, and the importation and treatment of inert material to produce secondary aggregate and reclamation material for progressive restoration to landscaped farmland originally permitted by planning permission ref. ESS/52/13/UTT without compliance with Condition 4 (Hours of operation) to allow heavy goods vehicles to travel off site between the hours 0600 and 0700 Monday to Saturday.”

    Highwood Quarry, Stortford Road, Little Canfield, Dunmow, Essex, CM6 1SL

    Received 14 Jan 2020
  19. Decision MadeCC/BTE/49/04

    (1) Extension of Administration Areas including Staff Room, Head Teacher's Office & Main School Office (2) Provision of Disabled Access Ramp

    Colne Engaine C E (Aided) Primary School,Green Farm Road,Colne Engaine,Colchester,CO6 2HA

    Received 8 Apr 2004
  20. Decision MadeESS/43/06/CHL/13/4

    Noise monitoring Sept 2014 - Cont of aggregate bagging plant &ancillary facilities, importation of agg for temp storage &/or bagging & approval of agg storage areas without compliance with cond 5 (hours of working) on pp ESS/50/02/CHL for the extension of working hours between 1/3 and 31/8 each year, as follows:Mon to Fri 06:00 – 22:00, Sat 06:00 – 13:00 & 06:00 – 15:00 on the following public/bank holidays: Good Friday, Easter Monday, Early May BH and Spring BH.

    Boreham Proving Ground,Bulls Lodge Quarry,Generals Lane,Boreham,Chelmsford,CM3 3HR

    Received 17 Sept 2014
  21. Application WithdrawnCC/COL/37/13

    Proposed erection of a single storey rear extension to provide a staff room

    Kingswode Hoe School, Sussex Road, Colchester, CO3 3QJ

    Received 19 Jul 2013
  22. Decision MadeESS/31/13/CHL/9/1

    Continuation of use as a waste transfer station without compliance with condition 2 (Compliance with Submitted Details), 16 (Landscape Scheme), 21 (Access Provisions) and 29 (Office and Substation Building Design) attached to planning permission reference ESS/65/12/CHL to allow the removal of the north-west staff and visitor access; removal of the substation; reorganisation of the parking area; repositioning of the vehicular and pedestrian access gates and weighbridge kiosk, and repositioning and altered design of the staff office building.

    Land west of Winsford Way, Winsford Way, Springfield, Chelmsford, CM2 5AA

    Received 15 Aug 2014
  23. Decision MadeCC/HLW/15/03

    To erect 1.8m high fence in place of existing fence on same line and gate positions as existing

    Potter Street Primary School,Carters Mead,Harlow,CM17 9EU

    Received 8 Mar 2003
  24. Decision MadeCC/BTE/33/14/8/1

    Erection of new school building to accommodate six classrooms with associated facilities, also extensions to existing school building including covered walkway to new building, extension to school kitchen on east elevation and additional classroom on south elevation.

    Chipping Hill Primary School, Owers Road, Witham, CM8 1FR

    Received 16 Sept 2014

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage