Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 28 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeESS/12/17/ROC/9/1

    Details pursuant to Condition 9 – Foul Water Drainage Scheme - ESS/12/17/ROC: The erection of buildings comprising one Reception Hide and one Viewing Hide for use by the general public; the development of a staff compound comprising one Office Building and one Meeting Room Building, Staff Parking Area; the erection of one Workshop and development of a new Hardstanding; and associated works.

    Wallasea Island Wild Coast Project, Creeksea Ferry Road, Wallasea Island, SS4 2HD

    Received 21 Nov 2019
  2. Decision MadeESS/32/18/TEN/16/5

    Details pursuant to Condition 16 (Noise Monitoring) of planning permission ESS/32/18/TEN that was for the "Installation and use of a washing plant for the recycling of non-hazardous and inert wastes, the use of a crusher, the installation of a weighbridge office and relocation of a weighbridge together with associated access onto the highway" Land at Martells Quarry, Slough Lane, Ardleigh, Essex, CO7 7RU.

    Land at: Martells Quarry, Slough Lane Ardleigh, Essex CO7 7RU

    Received 29 Sept 2020
  3. Decision MadeESS/28/23/TEN/47/1

    Details pursuant to Condition 47 – Soil Movement Scheme – ESS/28/23/TEN: Continuation of Extraction of 3.8 million tonnes of sand and gravel as an easterly extension to the existing Wivenhoe Quarry, erection of sand and gravel processing plant and ancillary facilities, new vehicular access onto the B1027 Brightlingsea Road, and restoration to agriculture and low-level water-based nature conservation habitats, lowland meadow, woodland planting and hedgerow enhancement using approximately 1.2 million cubic metres of imported inert waste material without compliance with Conditions 2 (Approved details), 23 (Restoration Phasing Plan), 28 (Highway improvements and site access road) and 35 (Visibility splays) attached to permission ref ESS/17/18/TEN to allow the extraction and storage on site of sand and gravel (no export of mineral or import of waste) prior to the establishment of the approved access and highway works.

    Land to the South of Colchester Main Road (known as Sunnymead, Elmstead and Heath Farms), Nr Wivenhoe, Alresford, CO7 8DB

    Received 25 Jun 2024
  4. Decision MadeESS/52/26/CHL/SO

    Screening opinion: Continuation of development without compliance with conditions 3 and 4 (cessation dates) of planning permission ref: ESS/01/18/CHL to allow an extension of time to complete mineral extraction and site restoration

    Land at Sheepcotes Farm, Sheepcotes Lane, Little Waltham, CM3 3LU

    Received 6 Jul 2026
  5. Decision MadeCC/EPF/156/07

    The continued use and retention of 1 relocatable classroom until 31 October 2012 without complying with Condition 1 (time limit) attached to planning permission CC/EPF/166/02

    Staples Road Primary School,Staples Road,Loughton,IG10 1HR

    Received 31 Oct 2007
  6. Application WithdrawnESS/23/06/CPT

    Use of land as asbestos waste transfer station including demolition of existing building

    ACE Limited, 195 Church Road, Benfleet

    Received 31 May 2006
  7. Decision MadeESS/104/22/COL/6/1

    Details pursuant to Conditions 5 (CEMP); 6 (Biodiversity Enhancement) and 7 (Lighting) of planning permission ESS/104/22/COL for the Expansion of the existing landfill gas power station compound, including the installation of an extra engine and flare to allow for management of additional gas generated by the neighbouring Bellhouse Landfill site.

    Bellhouse Quarry And Landfill Site, Electricity Generating Station, Warren Lane, Stanway, Essex, CO3 0NN

    Received 17 Jul 2023
  8. Decision MadeESS/86/20/MAL/6/4

    Details pursuant to Condition 6 (Transport Monitoring Programme) of planning permission ESS/86/20/MAL that was for the “Continued importation of packaged Intermediate Level Waste (ILW) without compliance with condition 02 (Initial Cessation Date) of planning permission ESS/14/16/MAL that was for the importation of packaged ILW from Magnox sites Sizewell "A" and Dungeness "A" to Bradwell Power Station and the interim storage within the existing Interim Storage Facility (ISF) to allow importation until 31st December 2023, which is the end date controlled by condition 05 (Secondary Cessation Date & ILW Limit) of planning permission ESS/14/16/MAL”

    Land at Bradwell Power Station, Bradwell on Sea, Southminster, Essex, CM0 7HQ

    Received 6 Oct 2021
  9. Decision MadeESS/11/14/TEN/SO

    The extraction of 4,000 tonnes of sand and gravel to facilitate the construction of a digestate store, part of a combined heat and power bio-gas plant (already approved at this site). Together with the on-site screening and exportation of some of the materials extracted (retrospective)

    Allen's Farm, Tye Road, Elmstead Market, Colchester, Essex, CO7 7BN

    Received 16 Dec 2013
  10. Out for ConsultationESS/42/17/CHL/23/06

    Details pursuant to condition 23 of ESS/42/17/CHL – Noise monitoring results November 2026. ESS/42/17/CHL was an amendment to “Extraction of an estimated reserve of 2.8 million tonnes of sand and gravel (from sites A38 and A39 as identified in the Minerals Local Plan 2014) and retention of existing access onto the A131, sand and gravel processing plant, associated buildings and plant, progressive restoration to agriculture using inert fill, installation of inert recycling plant to generate secondary aggregates. In addition, revised restoration scheme for the existing quarry area.”

    Blackley Quarry, and land to the north east and north west of the existing quarry, A131, Great Leighs, CM3 1QP

    Received 17 Nov 2026
  11. Decision MadeCC/UTT/120/07

    Installation of a single storey relocatable classroom unit with toilet facilities

    Stebbing County Primary School,High Street,Stebbing,Dunmow,CM6 3SH

    Received 21 Aug 2007
  12. Decision MadeESS/21/12/CHL/NMA1

    Non Material Amendment to planning permission ESS/21/12/CHL to allow: amended working phases to facilitate adequate support to Phase 2C road, extraction of same tonnage of mineral as previously permitted, site restoration amended on boundary with Bulls Lodge Quarry, realigned of site access point, amended phases of extraction and infilling compatible with Radial Distributor Road construction.

    Land to the South of Park Farm, Springfield, Chelmsford, Essex

    Received 29 Feb 2016
  13. Decision MadeESS/03/17/BTE

    Continuation of use as a Waste Transfer Station without compliance with Condition 2 (compliance with submitted details) attached to planning permission reference ESS/28/16/BTE, to allow an additional use of the site for overnight parking of associated Heavy Goods Vehicles and trailers

    Waste Transfer Station, Cordons Farm, Long Green, Cressing, CM77 8DL

    Received 2 Nov 2016
  14. Decision MadeCC/COL/15/20

    The provision of a new accessible ramp to the main school entrance. (Re-alignment of accessible ramp approved by planning permission CC/COL/68/19)

    Kendall Primary School, Recreation Road, Colchester CO1 2HH

    Received 12 Feb 2020
  15. Decision MadeESS/61/01/BRW

    Enforcement Action Variation of Condition 3 & 6 (BRW/123/86) to allow a time extension to the landfilling & restoration operations until 31 December 2003 & 31 December 2004 respectively

    Ongar Landfill Site,Mill Lane,Ongar,CM5 9RG

    Received 3 Dec 2001
  16. Decision MadeCC/HLW/47/17/3/1

    Details pursuant to Condition 3 – Construction Management Plan for planning application ref: CC/HLW/47/17 (Flood alleviation earth bund)

    Land forming part of Kingsmoor playing field, Parndon Wood Road, Harlow

    Received 5 Feb 2018
  17. Decision MadeCC/BTE/38/14/9/1

    Demolition of part of an existing classroom and extension of existing school hall and a classroom, new single storey 4 classroom extension to the rear and construction of an all-weather artificial grass surface, relocated hard play area equipment, soft landscaping, cycle and scooter parking and temporary construction access involving the removal, and reinstatement post construction, of the brick entrance pillars to allow for temporary wider access during construction.

    Silver End CP School, School Road, Silver End, Witham, CM8 3RZ

    Received 27 Aug 2015
  18. Decision MadeCC/BAS/10/10

    The retention of a classbase (unit 1262) for a temporary period of 6 years until 31 December 2016 without complying with condition 2 (time limit) attached to CC/BAS/164/05

    Pitsea Junior School,High Road,Pitsea,Basildon,SS133AB

    Received 13 Jan 2010
  19. Decision MadeCC/MAL/95/22/NMA2

    ‘Non-material amendment to permission ref CC/MAL/95/22 to allow: - Increased fence height around Reception and SEN play areas; - Change of external paving from Marshalls Harvest to Brett’s Autumn Gold (previously approved under Conditions 9 and 12); - Altered fenceline to avoid clash with office window; - Altered location of ASHP; - Addition of acoustic fencing around ASHP.’

    Land allocated for a new primary school under Land South of Limebrook Way and East of Maldon Wick, Maldon, Essex

    Received 16 Oct 2023
  20. Decision MadeCC/BTE/69/02

    Double relocatable classbase

    The Notley High School,Notley High School,Notley Road,Braintree,CM7 1HL

    Received 14 May 2002
  21. Decision MadeESS/41/14/BTE/SO

    Extension of time of 2 years to the period for commencement of development (condition 1) of planning permission granted by the Secretary of State Ref. APP/Z1585/V/09/2104804 (ECC ref ESS/37/08/BTE), allowing the date of commencement to be extend from 2 March 2015 to 2 March 2017. The planning permission being for An Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks in accordance with application number ESS/37/08/BTE dated 26 August 2008 (as amended).

    Rivenhall Airfield, Coggeshall Road (A120), Braintree, CO5 9DF

    Received 5 Aug 2014
  22. Decision MadeESS/24/15/TEN/31/4

    Details pursuant to Condition 31 (Noise Monitoring) of Planning permission ref no: ESS/24/15/TEN (Construction of an irrigation reservoir involving the excavation, processing and removal of sand, gravel and soils, engineering works and ancillary buildings at Elmstead Hall, Elmstead, Colchester).

    Elmstead Hall, Elmstead, Colchester, CO7 7EX

    Received 26 Jan 2021
  23. Decision MadeCC/BAS/37/16

    The construction of a 2 storey extension to provide 7no. classbases and ancillary facilities to allow the expansion of the schools from 2FE to 3FE. The provision of 4no. additional car parking spaces and 42no. additional cycle parking spaces. The provision of a new MUGA pitch

    Ghyllgrove County Junior School, The Gore, Basildon, Essex, SS14 2BG

    Received 15 Jul 2016
  24. Decision MadeCC/CHL/118/02

    Safety handrails to roof of A block extensions and B block

    County Hall Site,Market Road,Chelmsford,CM1 1QH

    Received 28 Jun 2002

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage