ApprovedCouncil status: Decision Made

Details pursuant to Condition 6 (Transport Monitoring Programme) of planning permission ESS/86/20/MAL that was for the “Continued importation of packaged Intermediate Level Waste (ILW) without compliance with condition 02 (Initial Cessation Date) of planning permission ESS/14/16/MAL that was for the importation of packaged ILW from Magnox sites Sizewell "A" and Dungeness "A" to Bradwell Power Station and the interim storage within the existing Interim Storage Facility (ISF) to allow importation until 31st December 2023, which is the end date controlled by condition 05 (Secondary Cessation Date & ILW Limit) of planning permission ESS/14/16/MAL

Land at Bradwell Power Station, Bradwell on Sea, Southminster, Essex, CM0 7HQ

Essex County CouncilReference ESS/86/20/MAL/6/13Submission of Details CC/ESS

Last published check: 22 Oct 2026, 20:18. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 22 Oct 2026, 20:18 (UK)

  1. DoneReceived8 Jan 2024
  2. DoneValidated8 Jan 2024
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted10 Jan 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Committee / Delegated Decision Date

    Published milestoneCouncil source
  3. Date Valid

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source
  5. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Submission of Details CC/ESS
Documents
6 published

Proposal

Details pursuant to Condition 6 (Transport Monitoring Programme) of planning permission ESS/86/20/MAL that was for the “Continued importation of packaged Intermediate Level Waste (ILW) without compliance with condition 02 (Initial Cessation Date) of planning permission ESS/14/16/MAL that was for the importation of packaged ILW from Magnox sites Sizewell "A" and Dungeness "A" to Bradwell Power Station and the interim storage within the existing Interim Storage Facility (ISF) to allow importation until 31st December 2023, which is the end date controlled by condition 05 (Secondary Cessation Date & ILW Limit) of planning permission ESS/14/16/MAL

Reference
ESS/86/20/MAL/6/13
Agent
Mr Mike Southall

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application Form - Without Personal DataApplication Form - Without Personal Data8 Jan 2024View
  • How the fee was calculatedHow the fee was calculated8 Jan 2024View
  • A summary of the attachments in the proposalA summary of the attachments in the proposal8 Jan 2024View
  • Covering letterCovering letter10 Jan 2024View
  • SOD ReportSOD Report10 Jan 2024View
  • Agent DecisionAgent Decision10 Jan 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Agent Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.