Council planning record

Noise levels shall be monitored by the operator at six monthly intervals from the date of the commencement of development at 5 noise sensitive locations to be approved in writing with the Mineral Planning Authority. The monitoring survey shall be for a minimum of two separate 15 minute periods at each location during all permitted operations and should avoid meal breaks and periods of plant breakdown. The frequency and duration of such monitoring may be modified at the discretion of the Mineral Planning Authority. The monitoring may be required more frequently where it becomes necessary to demonstrate continuing compliance with the limiting noise levels specified above, or less frequently where the need does not arise. Monitoring should only be undertaken in calm weather conditions or at receptors with a component of wind blowing from the site. Monitoring should generally be avoided in conditions of wind speeds greater than 5m/sec average; rain; low temperatures (<3 degrees C). All noise measurements taken shall be made no closer than 3.5 metres from the façade of properties or other reflective surface and have regard to the effects of extraneous noise and shall be corrected for any such effects. The monitoring shall include the LAeq,1 hour dB noise levels both with and without the permitted operations, the prevailing weather conditions, details of the measurement equipment used and its calibration and comments on the sources of noise which control the noise climate. The results shall be kept by the operating company during the life of the permitted operations and a copy shall be supplied to the Mineral Planning Authority

Crown Quarry (Ardleigh Reservoir Extension)

Decision MadeReference: ESS/57/04/TEN/15/3Essex County Council

Last published check: 1 Oct 2026, 18:08. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee / Delegated Decision Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Submission of Details CC/ESS
Received
26 Jun 2012
Validated
26 Jun 2012
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Noise levels shall be monitored by the operator at six monthly intervals from the date of the commencement of development at 5 noise sensitive locations to be approved in writing with the Mineral Planning Authority. The monitoring survey shall be for a minimum of two separate 15 minute periods at each location during all permitted operations and should avoid meal breaks and periods of plant breakdown. The frequency and duration of such monitoring may be modified at the discretion of the Mineral Planning Authority. The monitoring may be required more frequently where it becomes necessary to demonstrate continuing compliance with the limiting noise levels specified above, or less frequently where the need does not arise. Monitoring should only be undertaken in calm weather conditions or at receptors with a component of wind blowing from the site. Monitoring should generally be avoided in conditions of wind speeds greater than 5m/sec average; rain; low temperatures (<3 degrees C). All noise measurements taken shall be made no closer than 3.5 metres from the façade of properties or other reflective surface and have regard to the effects of extraneous noise and shall be corrected for any such effects. The monitoring shall include the LAeq,1 hour dB noise levels both with and without the permitted operations, the prevailing weather conditions, details of the measurement equipment used and its calibration and comments on the sources of noise which control the noise climate. The results shall be kept by the operating company during the life of the permitted operations and a copy shall be supplied to the Mineral Planning Authority

Proposal details

Reference
ESS/57/04/TEN/15/3
Agent
Mr D K Symes

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Crown Quarry (Ardleigh Reservoir Extension)

This record has no verified map location.

Documents 0 of 0

The document list could not be fully refreshed. View the council record for the complete list.

Document details are unavailable.

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.