Council planning record

Removal of condition 28 restricting geographical source of Solid Recovered Fuel and condition 30 restricting geographical source of waste paper and card attached to planning permission ESS/41/14/BTE to allow importation of Solid Recovered Fuel and waste paper and card without constraint as to the geographical source of the material. Planning permission ESS/41/14/BTE being for An Integrated Waste Management Facility comprising. • Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; • Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; • Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; • De-inking and Pulping Paper Recycling Facility to reclaim paper; • Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; • visitor/education centre; • extension to existing access road; • provision of offices and vehicle parking; • and associated engineering works and storage tanks.

Rivenhall Airfield, Coggeshall Road (A120), Braintree, Essex, CO5 9DF

Decision MadeReference: ESS/55/14/BTE/SOEssex County Council

Application location

Rivenhall Airfield, Coggeshall Road (A120), Braintree, Essex, CO5 9DF

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Screening Opinion Request CC/ESS
Received
12 Dec 2014
Validated
18 Dec 2014
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Removal of condition 28 restricting geographical source of Solid Recovered Fuel and condition 30 restricting geographical source of waste paper and card attached to planning permission ESS/41/14/BTE to allow importation of Solid Recovered Fuel and waste paper and card without constraint as to the geographical source of the material. Planning permission ESS/41/14/BTE being for An Integrated Waste Management Facility comprising. • Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; • Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; • Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; • De-inking and Pulping Paper Recycling Facility to reclaim paper; • Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; • visitor/education centre; • extension to existing access road; • provision of offices and vehicle parking; • and associated engineering works and storage tanks.

Proposal details

Reference
ESS/55/14/BTE/SO
Agent
Holmes & Hills LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 1 of 1

DocumentPublishedAction
Decision Letter and Appendix 1Decision Letter and Appendix 13 Feb 2015View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee / Delegated Decision Date

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

EIA not required
Decision Letter and Appendix 1
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.