ApprovedCouncil status: Decision Made

Details pursuant to clause 3.15 of legal agreement dated 30/10/2009 associated with ESS/55/14/BTE. ESS/55/14/BTE was for Removal of condition 28 restricting geographical source of Solid Recovered Fuel and condition 30 restricting geographical source of waste paper and card attached to planning permission ESS/41/14/BTE to allow importation of Solid Recovered Fuel and waste paper and card without constraint as to the geographical source of the material. Planning permission ESS/41/14/BTE being for An Integrated Waste Management Facility comprising. • Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; • Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; • Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; • De-inking and Pulping Paper Recycling Facility to reclaim paper; • Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; • visitor/education centre; • extension to existing access road; • provision of offices and vehicle parking; • and associated engineering works and storage tanks.

Rivenhall Airfield, Coggeshall Road (A120), Braintree, Essex, CO5 9DF

Essex County CouncilReference ESS/55/14/BTE/LA2Legal Obligations

Last published check: 1 Nov 2026, 01:57. Check the council record for more recent changes.

Status and dates

Last published check: 1 Nov 2026, 01:57 (UK)

  1. DoneReceived18 Dec 2015
  2. DoneValidated6 Jan 2016
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted26 Feb 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee / Delegated Decision Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
Application type
Legal Obligations
Documents
8 published

Proposal

Details pursuant to clause 3.15 of legal agreement dated 30/10/2009 associated with ESS/55/14/BTE. ESS/55/14/BTE was for Removal of condition 28 restricting geographical source of Solid Recovered Fuel and condition 30 restricting geographical source of waste paper and card attached to planning permission ESS/41/14/BTE to allow importation of Solid Recovered Fuel and waste paper and card without constraint as to the geographical source of the material. Planning permission ESS/41/14/BTE being for An Integrated Waste Management Facility comprising. • Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; • Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; • Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; • De-inking and Pulping Paper Recycling Facility to reclaim paper; • Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; • visitor/education centre; • extension to existing access road; • provision of offices and vehicle parking; • and associated engineering works and storage tanks.

Reference
ESS/55/14/BTE/LA2
Agent
Mr David Wipps

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • ECC Receipt of EIA Planning Application 26 August 2015ECC Receipt of EIA Planning Application 26 August 201514 Jan 2016View
  • Letter from the Environment Agency re: Environmental Permitting Application 09 December 2015Letter from the Environment Agency re: Environmental Permitting Application 09 December 201514 Jan 2016View
  • Letter from Fichtner Confirming Intent to Complete Construction 16 November 2015Letter from Fichtner Confirming Intent to Complete Construction 16 November 201514 Jan 2016View
  • Letter from Ridge 16 November 2015Letter from Ridge 16 November 201514 Jan 2016View
  • Letter from BLP (Gent Fairhead & Co. Ltd's Legal Advisers) 07 December 2015Letter from BLP (Gent Fairhead & Co. Ltd's Legal Advisers) 07 December 201514 Jan 2016View
  • Letter from Gent Fairhead & Co. Ltd to ECC 18 December 2015Letter from Gent Fairhead & Co. Ltd to ECC 18 December 201514 Jan 2016View
  • Letter to Claire Tomalin (ECC) 18 December 2015Letter to Claire Tomalin (ECC) 18 December 201514 Jan 2016View
  • Decision LetterDecision Letter26 Feb 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.