ApprovedCouncil status: Decision Made

Before topsoils and subsoils are stripped a detailed Scheme of Soil Movement and Storage shall be submitted for the written approval of the Minerals Planning Authority, in consultation with Natural England. Such scheme shall take the results of the Salinity Report (dated February 1991) and the applicants’ letter of 16 August 1991 to MAFF into account. Unless otherwise approved in writing by the Minerals Planning Authority, the soil handling scheme shall: identify the areas to be treated; be based on treating each 25cm layer of subsoil with gypsum prior to stripping. (In order to achieve the maximum mixing effect); and specify the rate and the method of gypsum application. Soils shall be moved and stored in accordance with the approved scheme.

Barling Marsh Quarry and Landfill Site,Mucking Hall Road,Barling Magna,Rochford,SS3 0NR

Essex County CouncilReference ESS/51/08/ROC/5/1Submission of Details CC/ESS

Last published check: 12 Nov 2026, 03:38. Check the council record for more recent changes.

Status and dates

Last published check: 12 Nov 2026, 03:38 (UK)

  1. DoneReceived11 May 2012
  2. DoneValidated18 May 2012
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted11 Jul 2012

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
Application type
Submission of Details CC/ESS
Documents
0 published

Proposal

Before topsoils and subsoils are stripped a detailed Scheme of Soil Movement and Storage shall be submitted for the written approval of the Minerals Planning Authority, in consultation with Natural England. Such scheme shall take the results of the Salinity Report (dated February 1991) and the applicants’ letter of 16 August 1991 to MAFF into account. Unless otherwise approved in writing by the Minerals Planning Authority, the soil handling scheme shall: identify the areas to be treated; be based on treating each 25cm layer of subsoil with gypsum prior to stripping. (In order to achieve the maximum mixing effect); and specify the rate and the method of gypsum application. Soils shall be moved and stored in accordance with the approved scheme.

Reference
ESS/51/08/ROC/5/1

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.