Council planning record

Continuation of installation of waste pre-treatment facilities and recontouring of the landfill to facilitate restoration permitted by ESS/35/06/BAS without compliance with condition 4 (completion timescales), to allow waste to be deposited on site until 31 December 2025 and the site restored to nature conservation by 31 December 2027 and without compliance with condition 3 (waste geographical sources) to allow importation of waste from outside Essex and Southend and also without the development of the previously permitted waste pre-treatment facility

Pitsea Landfill, Pitsea Hall Lane, Pitsea, Basildon, SS16 4UH

Decision MadeReference: ESS/49/14/BASEssex County Council

Last published check: 28 Sept 2026, 16:40. Check the council record for more recent changes.

Application location

Pitsea Landfill, Pitsea Hall Lane, Pitsea, Basildon, SS16 4UH

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Full App with EIA ESS
Received
10 Nov 2014
Validated
27 Nov 2014
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Continuation of installation of waste pre-treatment facilities and recontouring of the landfill to facilitate restoration permitted by ESS/35/06/BAS without compliance with condition 4 (completion timescales), to allow waste to be deposited on site until 31 December 2025 and the site restored to nature conservation by 31 December 2027 and without compliance with condition 3 (waste geographical sources) to allow importation of waste from outside Essex and Southend and also without the development of the previously permitted waste pre-treatment facility

Proposal details

Reference
ESS/49/14/BAS
Agent
Mr Adrian Foster

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 171 of 171

DocumentPublishedAction
Reg 24 StatementReg 24 Statement9 May 2022View
Decision Notice - EIA Determined ApplicationDecision Notice - EIA Determined Application9 May 2022View
Committee Report 25 September 2015Committee Report 25 September 201524 Sept 2015View
Committee Addendum 25 September 2015Committee Addendum 25 September 201525 Sept 2015View
Committee Minutes 25 September 2015Committee Minutes 25 September 201522 Oct 2015View
Committee Report ESS/49/14/BAS January 2020Committee Report ESS/49/14/BAS January 202020 Jan 2020View
Committee Report ESS/49/14/BAS January 2020 - Appendix 1Committee Report ESS/49/14/BAS January 2020 - Appendix 120 Jan 2020View
Committee Report ESS/49/14/BAS January 2020 - Appendix 2Committee Report ESS/49/14/BAS January 2020 - Appendix 220 Jan 2020View
Committee Minutes ESS/49/14/BAS January 2020Committee Minutes ESS/49/14/BAS January 202024 Feb 2020View
Committee Report July 2020 ESS/49/14/BASCommittee Report July 2020 ESS/49/14/BAS20 Jul 2020View
Committee Addendum July 2020Committee Addendum July 202024 Jul 2020View
Committee Minutes July 2020Committee Minutes July 202024 Aug 2020View
Committee Report ESS/49/14/BAS October 2020Committee Report ESS/49/14/BAS October 202016 Oct 2020View
Committee Report ESS-49-14-BAS Feb 2021Committee Report ESS-49-14-BAS Feb 202118 Feb 2021View
Committee Minutes February 2021Committee Minutes February 202118 Mar 2021View
Committee Report ESS/49/14/BAS March 2022Committee Report ESS/49/14/BAS March 202217 Mar 2022View
Application FormApplication Form4 Dec 2014View
A summary of the attachments in the proposalA summary of the attachments in the proposal4 Dec 2014View
How the fee was calculatedHow the fee was calculated4 Dec 2014View
Volume 1 - Planning Supporting Statement - November 2014Volume 1 - Planning Supporting Statement - November 20144 Dec 2014View
Volume 1 - Appendix B - Wonder Day PressVolume 1 - Appendix B - Wonder Day Press4 Dec 2014View
Volume 1 - Appendix B - Wonder Day Draft FlyerVolume 1 - Appendix B - Wonder Day Draft Flyer4 Dec 2014View
Volume 1 - Appendix B - Public Liaison Group Minutes 240614Volume 1 - Appendix B - Public Liaison Group Minutes 2406144 Dec 2014View
Volume 1 - Appendix B - Frequently Asked QuestionsVolume 1 - Appendix B - Frequently Asked Questions4 Dec 2014View
Volume 1 - Appendix B - Draft Letter to CouncillorsVolume 1 - Appendix B - Draft Letter to Councillors4 Dec 2014View
Volume 1 - Appendix B - Publicity Involvement ProgrammeVolume 1 - Appendix B - Publicity Involvement Programme4 Dec 2014View
Volume 1 - Appendix B - Councillors Contacts ListVolume 1 - Appendix B - Councillors Contacts List4 Dec 2014View
Volume 1 - Appendix C - Planning Permission ESS3506BASVolume 1 - Appendix C - Planning Permission ESS3506BAS4 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-5 - Review of Hydrogeological Risk AssessmentVolume 2 - ES Chapter 10 - Appendix 10-5 - Review of Hydrogeological Risk Assessment4 Dec 2014View
Planning Application 2006 - Appendix 7 - Table 4Planning Application 2006 - Appendix 7 - Table 44 Dec 2014View
Planning Application 2006 - Appendix 6 - Tables 1 - 3Planning Application 2006 - Appendix 6 - Tables 1 - 34 Dec 2014View
Planning Application 2006 - Cover LetterPlanning Application 2006 - Cover Letter4 Dec 2014View
Planning Application 2006 - Section 1 - IntroductionPlanning Application 2006 - Section 1 - Introduction4 Dec 2014View
Planning Application 2006 - Section 2 - Application FormsPlanning Application 2006 - Section 2 - Application Forms4 Dec 2014View
Planning Application 2006 - Section 3 - Planning ConsiderationsPlanning Application 2006 - Section 3 - Planning Considerations4 Dec 2014View
Planning Application 2006 - Section 4 - Need for Waste Management FacilitiesPlanning Application 2006 - Section 4 - Need for Waste Management Facilities4 Dec 2014View
Planning Application 2006 - Section 5 - Landfill Working & Restoration SchemePlanning Application 2006 - Section 5 - Landfill Working & Restoration Scheme4 Dec 2014View
Planning Application 2006 - Section 6 - Mechanical & Biological Treatment FacilityPlanning Application 2006 - Section 6 - Mechanical & Biological Treatment Facility4 Dec 2014View
Planning Application 2006 - Section 7 Benefits, Disbenefits & SustainabilityPlanning Application 2006 - Section 7 Benefits, Disbenefits & Sustainability4 Dec 2014View
Planning Application 2006 - Appendix 1 Environmental Policy StatementPlanning Application 2006 - Appendix 1 Environmental Policy Statement4 Dec 2014View
Planning Application 2006 - Appendix 2 - Location PlanPlanning Application 2006 - Appendix 2 - Location Plan4 Dec 2014View
Planning Application 2006 - Appendix 3 - Application BoundaryPlanning Application 2006 - Appendix 3 - Application Boundary4 Dec 2014View
Planning Application 2006 - Appendix 4 - Existing Permission ESS5196BASPlanning Application 2006 - Appendix 4 - Existing Permission ESS5196BAS4 Dec 2014View
Planning Application 2006 - Appendix 13 - Drawing 17 & Landform ModellingPlanning Application 2006 - Appendix 13 - Drawing 17 & Landform Modelling4 Dec 2014View
Planning Application 2006 - Appendix 5 Existing S106 Legal AgreementPlanning Application 2006 - Appendix 5 Existing S106 Legal Agreement4 Dec 2014View
Planning Application 2006 - Appendix 8 - Environmental InformationPlanning Application 2006 - Appendix 8 - Environmental Information4 Dec 2014View
Planning Application 2006 - Appendix 9 Drawing UtilitiesPlanning Application 2006 - Appendix 9 Drawing Utilities4 Dec 2014View
Planning Application 2006 - Appendix 11 Drawings 12 - 13Planning Application 2006 - Appendix 11 Drawings 12 - 134 Dec 2014View
Planning Application 2006 - Appendix 12 Drawings 14 - 16Planning Application 2006 - Appendix 12 Drawings 14 - 164 Dec 2014View
Planning Application 2006 - Appendix 10 Drawings 5 to 11 Part 2Planning Application 2006 - Appendix 10 Drawings 5 to 11 Part 24 Dec 2014View
Planning Application 2006 - Appendix 10 Drawings 5 to 11 Part 1Planning Application 2006 - Appendix 10 Drawings 5 to 11 Part 14 Dec 2014View
Planning Application 2006 - Appendix 10 Drawings 5 to 11 Part 3Planning Application 2006 - Appendix 10 Drawings 5 to 11 Part 34 Dec 2014View
Pitsea RSPB Response Letter 27 May 2015Pitsea RSPB Response Letter 27 May 20151 Jun 2015View
Holehaven Birds & Barges LeafletHolehaven Birds & Barges Leaflet16 Sept 2015View
Veolia Letter S106Veolia Letter S1064 Oct 2019View
Site Restoration Plan - P/2Site Restoration Plan - P/24 Dec 2014View
Site Context Plan - P/1Site Context Plan - P/14 Dec 2014View
Volume 3 - Non Technical Summary - November 2014Volume 3 - Non Technical Summary - November 20144 Dec 2014View
Volume 2 - Environmental Statement (ES)- Chapeter 1 - IntroductionVolume 2 - Environmental Statement (ES)- Chapeter 1 - Introduction4 Dec 2014View
Volume 2 - ES Chapter 1 - Appendix 1.2 - Screening and Request for a Scoping OpinionVolume 2 - ES Chapter 1 - Appendix 1.2 - Screening and Request for a Scoping Opinion4 Dec 2014View
Volume 2 - ES Chapter 1 - Appendix 1.3 - ESS3714BAS - Scoping OpinionVolume 2 - ES Chapter 1 - Appendix 1.3 - ESS3714BAS - Scoping Opinion4 Dec 2014View
Volume 2 - ES Chapter 2 - Site DescriptionVolume 2 - ES Chapter 2 - Site Description4 Dec 2014View
Volume 2 - ES Chapter 3 - Description of DevelopmentVolume 2 - ES Chapter 3 - Description of Development4 Dec 2014View
Volume 2 - ES Chapter 4 - Planning PolicyVolume 2 - ES Chapter 4 - Planning Policy4 Dec 2014View
Volume 2 - ES Chapter 5 - AlternativesVolume 2 - ES Chapter 5 - Alternatives4 Dec 2014View
Volume 2 - ES Chapter 6 - Statutory & Non-Statutory Designated sites for Nature Conservation 6-1Volume 2 - ES Chapter 6 - Statutory & Non-Statutory Designated sites for Nature Conservation 6-14 Dec 2014View
Volume 2 - ES Chapter 6 - EcologyVolume 2 - ES Chapter 6 - Ecology4 Dec 2014View
Volume 2 - ES Chapter 6 - Appendix 6-1 - Statutory Site DesignationsVolume 2 - ES Chapter 6 - Appendix 6-1 - Statutory Site Designations4 Dec 2014View
Volume 2 - ES Chapter 6 - Appendix 6-2 - Ecology Baseline ReportsVolume 2 - ES Chapter 6 - Appendix 6-2 - Ecology Baseline Reports4 Dec 2014View
Volume 2 - ES Chapter 6 - Appendix 6-3 - Nonstatutory Site CitationsVolume 2 - ES Chapter 6 - Appendix 6-3 - Nonstatutory Site Citations4 Dec 2014View
Volume 2 - ES Chapter 6 - Appendix 6-4 - Essex Field Club ReportVolume 2 - ES Chapter 6 - Appendix 6-4 - Essex Field Club Report4 Dec 2014View
Volume 2 - ES Chapter 6 - Appendix 6-5 - Information to Support HRAVolume 2 - ES Chapter 6 - Appendix 6-5 - Information to Support HRA4 Dec 2014View
Volume 2 - ES Chapter 7 - Landscape and Visual EffectsVolume 2 - ES Chapter 7 - Landscape and Visual Effects4 Dec 2014View
Volume 2 - ES Chapter 7 - Landscape TopographyVolume 2 - ES Chapter 7 - Landscape Topography4 Dec 2014View
Volume 2 - ES Chapter 7 - Landscape Topography Plan 7-1Volume 2 - ES Chapter 7 - Landscape Topography Plan 7-14 Dec 2014View
Volume 2 - ES Chapter 7 - Potential Landscape and Visual Receptors Plan 7-2Volume 2 - ES Chapter 7 - Potential Landscape and Visual Receptors Plan 7-24 Dec 2014View
Volume 2 - ES Chapter 7 - Landscape Character Plan 7-3Volume 2 - ES Chapter 7 - Landscape Character Plan 7-34 Dec 2014View
Volume 2 - ES Chapter 7 - Landscape Topography Plan 7-4Volume 2 - ES Chapter 7 - Landscape Topography Plan 7-44 Dec 2014View
Volume 2 - ES Chapter 7 - Viewpoint A - Picnic Area Bowers MarshesVolume 2 - ES Chapter 7 - Viewpoint A - Picnic Area Bowers Marshes4 Dec 2014View
Volume 2 - ES Chapter 7 - Viewpoint B - South BenfleetVolume 2 - ES Chapter 7 - Viewpoint B - South Benfleet4 Dec 2014View
Volume 2 - ES Chapter 7 - Viewpoint C - Winter GardensVolume 2 - ES Chapter 7 - Viewpoint C - Winter Gardens4 Dec 2014View
Volume 2 - ES Chapter 7 - Viewpoint D - Holehaven CreekVolume 2 - ES Chapter 7 - Viewpoint D - Holehaven Creek4 Dec 2014View
Volume 2 - ES Chapter 7 - Viewpoint E - Thames Gateway Logistics ParkVolume 2 - ES Chapter 7 - Viewpoint E - Thames Gateway Logistics Park4 Dec 2014View
Volume 2 - ES Chapter 7 - Viewpoint F - Existing View - High RoadVolume 2 - ES Chapter 7 - Viewpoint F - Existing View - High Road4 Dec 2014View
Volume 2 - ES Chapter 7 - Viewpoint G - Existing View - Vange MarshesVolume 2 - ES Chapter 7 - Viewpoint G - Existing View - Vange Marshes4 Dec 2014View
Volume 2 - ES Chapter 7 - Viewpoint H - Existing View - St Michael's TowerVolume 2 - ES Chapter 7 - Viewpoint H - Existing View - St Michael's Tower4 Dec 2014View
Volume 2 - ES Chapter 8 -Traffic and TransportationVolume 2 - ES Chapter 8 -Traffic and Transportation4 Dec 2014View
Volume 2 - ES Chapter 8 - Appendix 8A - Traffic Survey DataVolume 2 - ES Chapter 8 - Appendix 8A - Traffic Survey Data4 Dec 2014View
Volume 2 - ES Chapter 8 - Appendix 8B - Accident DataVolume 2 - ES Chapter 8 - Appendix 8B - Accident Data4 Dec 2014View
Volume 2 - ES Chapter 9 - Air QualityVolume 2 - ES Chapter 9 - Air Quality4 Dec 2014View
Volume 2 - ES Chapter 10 - Flood Risk Assessment & Water EnvironmentVolume 2 - ES Chapter 10 - Flood Risk Assessment & Water Environment4 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-1 -Water Resources and DrainageVolume 2 - ES Chapter 10 - Appendix 10-1 -Water Resources and Drainage4 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-2 - Figure 2.2 bVolume 2 - ES Chapter 10 - Appendix 10-2 - Figure 2.2 b4 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-2 - Figure 2.2 aVolume 2 - ES Chapter 10 - Appendix 10-2 - Figure 2.2 a4 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-3 - Contour 1 (1)Volume 2 - ES Chapter 10 - Appendix 10-3 - Contour 1 (1)4 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-3 - Contour 1 (2)Volume 2 - ES Chapter 10 - Appendix 10-3 - Contour 1 (2)4 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-4 - PIT211-220Volume 2 - ES Chapter 10 - Appendix 10-4 - PIT211-2204 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-4 - PIT231-238Volume 2 - ES Chapter 10 - Appendix 10-4 - PIT231-2384 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-4 - PIT221-230Volume 2 - ES Chapter 10 - Appendix 10-4 - PIT221-2304 Dec 2014View
Volume 2 - ES Chapter 10 - Appendix 10-4 - PIT201-210Volume 2 - ES Chapter 10 - Appendix 10-4 - PIT201-2104 Dec 2014View
Volume 2 - ES Chapter 11 - ConclusionsVolume 2 - ES Chapter 11 - Conclusions4 Dec 2014View
Environmental Statement 2006 - Contents & SummaryEnvironmental Statement 2006 - Contents & Summary4 Dec 2014View
Environmental Statement 2006 - Section 1 - IntroductionEnvironmental Statement 2006 - Section 1 - Introduction4 Dec 2014View
Environmental Statement 2006 - Section 2 - History of Waste DisposalEnvironmental Statement 2006 - Section 2 - History of Waste Disposal4 Dec 2014View
Environmental Statement 2006 - Section 3 - EIA ApproachEnvironmental Statement 2006 - Section 3 - EIA Approach4 Dec 2014View
Environmental Statement 2006 - Section 4 - Development Proposals & RationaleEnvironmental Statement 2006 - Section 4 - Development Proposals & Rationale4 Dec 2014View
Environmental Statement 2006 - Section 5 - Scope of AssessmentEnvironmental Statement 2006 - Section 5 - Scope of Assessment4 Dec 2014View
Environmental Statement 2006 - Section 6 - Existing EnvironmentEnvironmental Statement 2006 - Section 6 - Existing Environment4 Dec 2014View
Environmental Statement 2006 - Section 12 - Nature ConservationEnvironmental Statement 2006 - Section 12 - Nature Conservation4 Dec 2014View
Environmental Statement 2006 - Section 8 - Planning PolicyEnvironmental Statement 2006 - Section 8 - Planning Policy4 Dec 2014View
Environmental Statement 2006 - Section 9 - IntroductionEnvironmental Statement 2006 - Section 9 - Introduction4 Dec 2014View
Environmental Statement 2006 - Section 10 - Recreation & AmenityEnvironmental Statement 2006 - Section 10 - Recreation & Amenity4 Dec 2014View
Environmental Statement 2006 - Section 11- Water Resources & DrainageEnvironmental Statement 2006 - Section 11- Water Resources & Drainage4 Dec 2014View
Environmental Statement 2006 - Site Location & Contraints PlanEnvironmental Statement 2006 - Site Location & Contraints Plan4 Dec 2014View
Environmental Statement 2006 - Section 13 - Noise EffectsEnvironmental Statement 2006 - Section 13 - Noise Effects4 Dec 2014View
Environmental Statement 2006 - Section 14 - Air QualityEnvironmental Statement 2006 - Section 14 - Air Quality4 Dec 2014View
Environmental Statement 2006 - Section 15 - InCombination & Culmative Effects & SustainabilityEnvironmental Statement 2006 - Section 15 - InCombination & Culmative Effects & Sustainability4 Dec 2014View
Scoping Opinion Appendix ESS3714BAS - SPOScoping Opinion Appendix ESS3714BAS - SPO4 Dec 2014View
Additional Information - Monitoring MethodologyAdditional Information - Monitoring Methodology24 Mar 2015View
Additional Information - Heritage Statement March 2015Additional Information - Heritage Statement March 201524 Mar 2015View
Email from Agent 20 March 2015Email from Agent 20 March 201524 Mar 2015View
Additional Information - Cover Letter 11 February 2015Additional Information - Cover Letter 11 February 201524 Mar 2015View
Pitsea Landfill Email - 30032015Pitsea Landfill Email - 3003201530 Mar 2015View
Protected Species Email 270515Protected Species Email 2705151 Jun 2015View
Protection Measures for Protected SpeciesProtection Measures for Protected Species1 Jun 2015View
Progressive Restoration Completed up to 2014Progressive Restoration Completed up to 201416 Jun 2015View
Landfill Phase Locations PlanLandfill Phase Locations Plan16 Jun 2015View
Phase 1 Settlement PredictionPhase 1 Settlement Prediction16 Jun 2015View
Survey Results for SettlementSurvey Results for Settlement16 Jun 2015View
Phase 2 and 3 Settlement PredictionPhase 2 and 3 Settlement Prediction16 Jun 2015View
Settlement Info Letter IssueSettlement Info Letter Issue16 Jun 2015View
Phase 4 Settlement PredictionPhase 4 Settlement Prediction16 Jun 2015View
Additional Information from ApplicantAdditional Information from Applicant28 Jul 2015View
Disturbance Study Report 2012/2013Disturbance Study Report 2012/201328 Jul 2015View
SSSI Monitoring Summary August 2013 - February 2014SSSI Monitoring Summary August 2013 - February 201428 Jul 2015View
Addditional Information from Application RE: Issue of SettlementAddditional Information from Application RE: Issue of Settlement28 Jul 2015View
Additional supporting Information - Veolia dated 7 May 2020Additional supporting Information - Veolia dated 7 May 202020 May 2020View
EA ChecklistEA Checklist21 May 2020View
Holehaven Creek Bird Disturbance Monitoring Summary 2018 - 2019Holehaven Creek Bird Disturbance Monitoring Summary 2018 - 20194 Aug 2020View
Holehaven SSSI Monitoring and Barge Disturbance Report 2018Holehaven SSSI Monitoring and Barge Disturbance Report 201817 Aug 2020View
Pitsea HRA ESS-49-14-BAS - Revised 190820Pitsea HRA ESS-49-14-BAS - Revised 19082021 Aug 2020View
Wood. Holehaven Creek SSSI Barge Disturbance Study Report 2019 - 2020 for issueWood. Holehaven Creek SSSI Barge Disturbance Study Report 2019 - 2020 for issue25 Aug 2020View
Deed of Termination signed by the RSPB (Attachment)Deed of Termination signed by the RSPB (Attachment)19 Nov 2020View
Deed of Termination signed by the RSPB (Email)Deed of Termination signed by the RSPB (Email)19 Nov 2020View
Draft - Pitsea Hall Lane Railbridge - Revised proposed priority system Sept 20Draft - Pitsea Hall Lane Railbridge - Revised proposed priority system Sept 2015 Feb 2021View
Predator monitoring and management programme - FINAL 16 Sep 2015Predator monitoring and management programme - FINAL 16 Sep 201524 Mar 2021View
Operational Management Plan - Appendicies D-E Transportation of Restoration Matrials By barge to Pitsea Landfill Site via Holehaven Creek 2013Operational Management Plan - Appendicies D-E Transportation of Restoration Matrials By barge to Pitsea Landfill Site via Holehaven Creek 201324 Mar 2021View
Operational Management Plan - Transportation of Restoration Matrials By barge to Pitsea Landfill Site via Holehaven Creek 2013Operational Management Plan - Transportation of Restoration Matrials By barge to Pitsea Landfill Site via Holehaven Creek 201325 Mar 2021View
Operational Management Plan - Appendicies A to C Transportation of Restoration Matrials By barge to Pitsea Landfill Site via Holehaven Creek 2013Operational Management Plan - Appendicies A to C Transportation of Restoration Matrials By barge to Pitsea Landfill Site via Holehaven Creek 201325 Mar 2021View
Drawing PIT-RES-405E - Progressive Restoration completed upto 2019Drawing PIT-RES-405E - Progressive Restoration completed upto 201920 May 2020View
Drawing PIT-RES-453 - Projected Restoration Areas 2020Drawing PIT-RES-453 - Projected Restoration Areas 202020 May 2020View
Figure 3 - Revised Restoration Masterplan dated 2018Figure 3 - Revised Restoration Masterplan dated 201813 May 2020View
Draft - Pitsea Hall Lane Railbridge - Proposed priority system and widened footwayDraft - Pitsea Hall Lane Railbridge - Proposed priority system and widened footway13 May 2020View
Habitats Regulation AssessmentHabitats Regulation Assessment17 Aug 2020View
Revised Site Notice – Application description amendedRevised Site Notice – Application description amended9 Dec 2014View
Additional Information - Site NoticeAdditional Information - Site Notice15 May 2020View
Site Notice - EIA Determined ApplicationSite Notice - EIA Determined Application9 May 2022View
Canvey Island Town Council Consultation Response (Email)Canvey Island Town Council Consultation Response (Email)1 Jun 2020View
Canvey Island Town Council Consultation Response (Attachment)Canvey Island Town Council Consultation Response (Attachment)1 Jun 2020View
Pitsea Mount Residents Association Add Info Consultation Response (Email)Pitsea Mount Residents Association Add Info Consultation Response (Email)9 Jun 2020View
Pitsea Mount Residents Association Add Info Consultation Response (Attachment)Pitsea Mount Residents Association Add Info Consultation Response (Attachment)9 Jun 2020View
Castle Point Borough CouncilCastle Point Borough Council10 Jun 2020View
Environment Agency Add Info Consultation Response (Email)Environment Agency Add Info Consultation Response (Email)10 Jun 2020View
Environment Agency Add Info Consultation Response (Attachment)Environment Agency Add Info Consultation Response (Attachment)10 Jun 2020View
Basildon Borough Council - Planning Department Consultation Response (Email)Basildon Borough Council - Planning Department Consultation Response (Email)19 Jun 2020View
Basildon Borough Council - Planning Department Consultation Response (Attachment)Basildon Borough Council - Planning Department Consultation Response (Attachment)19 Jun 2020View
Natural EnglandNatural England29 Jun 2020View
Natural England 21/09/20 consultation responseNatural England 21/09/20 consultation response21 Sept 2020View
Environmental Statement 2006 - Section 7 - AlternativesEnvironmental Statement 2006 - Section 7 - Alternatives4 Dec 2014View
S106 AgreementS106 Agreement9 May 2022View
Deed of VariationDeed of Variation10 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee / Delegated Decision Date

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source
  5. Consultation Start

    Published milestoneCouncil source
  6. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted
Decision Notice - EIA Determined Application
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.