ApprovedCouncil status: Decision Made

Extension of time of 2 years to the period for commencement of development (condition 1) of planning permission granted by the Secretary of State Ref. APP/Z1585/V/09/2104804 (ECC ref ESS/37/08/BTE), allowing the date of commencement to be extend from 2 March 2015 to 2 March 2017. The planning permission being for An Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks in accordance with application number ESS/37/08/BTE dated 26 August 2008 (as amended). (NB The timescale for commencement has been revised by condition. Commencement is required by 2 March 2016)

Rivenhall Airfield, Coggeshall Road (A120), Braintree, CO5 9DF

Essex County CouncilReference ESS/41/14/BTERemoval/Variation of Condition ESS

Last published check: 1 Nov 2026, 14:22. Check the council record for more recent changes.

Status and dates

Last published check: 1 Nov 2026, 14:22 (UK)

  1. DoneReceived5 Aug 2014
  2. DoneValidated7 Aug 2014
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted4 Dec 2014

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee / Delegated Decision Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
Application type
Removal/Variation of Condition ESS
Documents
88 published

Proposal

Extension of time of 2 years to the period for commencement of development (condition 1) of planning permission granted by the Secretary of State Ref. APP/Z1585/V/09/2104804 (ECC ref ESS/37/08/BTE), allowing the date of commencement to be extend from 2 March 2015 to 2 March 2017. The planning permission being for An Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks in accordance with application number ESS/37/08/BTE dated 26 August 2008 (as amended). (NB The timescale for commencement has been revised by condition. Commencement is required by 2 March 2016)

Reference
ESS/41/14/BTE
Agent
Mr David Whipps

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • APPEAL - Grounds of Appeal 29 May 2015APPEAL - Grounds of Appeal 29 May 201531 Jul 2015View
  • APPEAL - Rivenhall IWMF Update on NeedAPPEAL - Rivenhall IWMF Update on Need31 Jul 2015View
  • APPEAL - Decision NoticeAPPEAL - Decision Notice31 Jul 2015View
  • APPEAL - Revised Decision NoticeAPPEAL - Revised Decision Notice31 Jul 2015View
  • APPEAL - Business development since August 2014APPEAL - Business development since August 201431 Jul 2015View
  • APPEAL - Decision Notice (Conditions 28 & 30 Removed)APPEAL - Decision Notice (Conditions 28 & 30 Removed)31 Jul 2015View
  • APPEAL - Letter from PINS to ECC 27 July 2015APPEAL - Letter from PINS to ECC 27 July 201531 Jul 2015View
  • APPEAL - Full Statement of CaseAPPEAL - Full Statement of Case31 Jul 2015View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
APPEAL - Decision Notice APPEAL - Revised Decision Notice APPEAL - Decision Notice (Conditions 28 & 30 Removed) APPEAL - Decision Notice to go with ECC email to PINS 11th March 2016 APPEAL - ECC email to PINS 11th March 2016 + decision notice Decision Letter Email - 7 August 2014 Revised Decision Notice Secretary Of State Decision Letter - 2 March 2010
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.