Status on council recordCouncil status: Decision Made

Continuation of development of the Integrated Waste Management Facility (IWMF) with deletion of condition 66, approved details thereunder and associated conditions (Plan of Action if development not taken forward within 5 years) of planning permission ESS/34/15/BTE. ESS/34/15/BTE was amended planning permission for “The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks.”

Land at Rivenhall Airfield Coggeshall Road, Braintree, CO5 9DF

Essex County CouncilReference ESS/39/23/BTE/SOScreening Opinion Request CC/ESS

Last published check: 17 Oct 2026, 17:23. Check the council record for more recent changes.

Status and dates

Last published check: 17 Oct 2026, 17:23 (UK)

  1. DoneReceived18 May 2023
  2. DoneValidated18 May 2023
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedEIA not required19 May 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Committee / Delegated Decision Date

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Date Valid

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
Application type
Screening Opinion Request CC/ESS
Documents
12 published

Proposal

Continuation of development of the Integrated Waste Management Facility (IWMF) with deletion of condition 66, approved details thereunder and associated conditions (Plan of Action if development not taken forward within 5 years) of planning permission ESS/34/15/BTE. ESS/34/15/BTE was amended planning permission for “The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks.”

Reference
ESS/39/23/BTE/SO
Agent
Mr Jon Brier

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Appendix 1Appendix 118 May 2023View
  • Agent Decision LetterAgent Decision Letter19 May 2023View
  • Application FormApplication Form28 Apr 2023View
  • Covering LetterCovering Letter18 May 2023View
  • Letter on behalf of Indaver Rivenhall LimitedLetter on behalf of Indaver Rivenhall Limited18 Jul 2023View
  • Email on behalf of Indaver Rivenhall LimitedEmail on behalf of Indaver Rivenhall Limited18 Jul 2023View
  • FIG_1-1A_Land_Ownership_and_Proposed_Site_Plan (2)FIG_1-1A_Land_Ownership_and_Proposed_Site_Plan (2)3 May 2023View
  • Email 3rd part request for SoS Screening Direction & PCU acknowledgementEmail 3rd part request for SoS Screening Direction & PCU acknowledgement26 Jun 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

EIA not required
Agent Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.