Council planning record

Non-Material Amendment to the Description of Development of planning permission ESS/39/23/BTE to remove reference to materials processed within the IWMF, together with the re-wording of Condition 29 to include reference to materials processed within the IWMF. ESS/39/23/BTE is an amended planning permission for the Rivenhall Integrated Waste Management Facility (IWMF)

Land at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DF

Application WithdrawnReference: ESS/39/23/BTE/NMA13Essex County Council

Last published check: 12 Oct 2026, 09:21. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Committee / Delegated Decision Date

    Published milestoneCouncil source
  6. Decision Date

    Published milestoneCouncil source

Application summary

Status
Application Withdrawn
Application type
Non Material Amendment
Received
7 Mar 2025
Validated
1 Apr 2025
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Non-Material Amendment to the Description of Development of planning permission ESS/39/23/BTE to remove reference to materials processed within the IWMF, together with the re-wording of Condition 29 to include reference to materials processed within the IWMF. ESS/39/23/BTE is an amended planning permission for the Rivenhall Integrated Waste Management Facility (IWMF)

Proposal details

Reference
ESS/39/23/BTE/NMA13
Agent
Mr Alex MacGregor

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DF

This record has no verified map location.

Documents 23 of 23

DocumentPublishedAction
Application FormApplication Form9 Apr 2025View
ECC as Waste Planning Authority Note re Consultation Responses and CorrespondenceECC as Waste Planning Authority Note re Consultation Responses and Correspondence15 Apr 2025View
How the fee was calculatedHow the fee was calculated7 Mar 2025View
A summary of the attachments in the proposalA summary of the attachments in the proposal7 Mar 2025View
Planning statementPlanning statement7 Mar 2025View
EA ChecklistEA Checklist2 Apr 2025View
Scoping Opinion ESS/51/24/BTEScoping Opinion ESS/51/24/BTE2 Apr 2025View
Agent Email - FW - Rivenhall IWMF - NMA wording and sequence of applicationsAgent Email - FW - Rivenhall IWMF - NMA wording and sequence of applications4 Feb 2026View
VAA-WA-58020002_0.0 Landownership and Proposed Site PlanVAA-WA-58020002_0.0 Landownership and Proposed Site Plan20 Mar 2025View
Site NoticeSite Notice4 Apr 2025View
National Highways Consultation ResponseNational Highways Consultation Response30 Apr 2025View
Ringways Jacobs (Noise) Consultation ResponseRingways Jacobs (Noise) Consultation Response13 May 2025View
Ringway Jacobs (Air Quality) Consultation ResponseRingway Jacobs (Air Quality) Consultation Response14 May 2025View
Bradwell with Pattiswick Parish Council Consultation ResponseBradwell with Pattiswick Parish Council Consultation Response22 May 2025View
Coggeshall Parish Council Consultation ResponseCoggeshall Parish Council Consultation Response27 May 2025View
Cllr Ross Playle Consultation ResponseCllr Ross Playle Consultation Response3 Jun 2025View
Ringway Jacobs (Lighting) Consultation ResponseRingway Jacobs (Lighting) Consultation Response6 Jun 2025View
ECC - Public Health Consultation ResponseECC - Public Health Consultation Response9 Jun 2025View
EA response to Non Material Amendment ESS/39/23/BTE/NMA13EA response to Non Material Amendment ESS/39/23/BTE/NMA1318 Jun 2025View
EA response to S73/Variation application ESS/23/25/BTEEA response to S73/Variation application ESS/23/25/BTE18 Jun 2025View
EA response to Outline application to Carbon Capture Use and Storage plant with Heat Offtake.EA response to Outline application to Carbon Capture Use and Storage plant with Heat Offtake.18 Jun 2025View
Place ServicesPlace Services18 Jul 2025View
Anglian Water Consultation ResponseAnglian Water Consultation Response31 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.